|
- � I,! IIII I,�I_
<br /> U
<br /> , z o �
<br /> �
<br /> � EXTERIOR INTERIOR z � O
<br /> � INTERIOR
<br /> �XTERIOR PLYWOOD 2x FRAMING � � U O
<br /> ANODIZ�D ALUM. DOUBLE STUDS AT JAMB SHEATHING '�
<br /> r r �=� AND HEAD WITH ANCHOR co PLYWOOD SHEATHING (n �
<br /> WINDOW rRAM�W_ x
<br /> STRAP. w W �
<br /> � �
<br /> HOL�S %8� EXTERIOR 1 1/2" DRAINABLE SUBSTRATE- � � O
<br /> SILI_R�CEPTOR W/ 2" PLYWOOD E.I.F.S. E.I.F.S. SEE � � ~'
<br /> �
<br /> r r � � 1 1/2" DRAINABLE E.I.F.S. SHEATHING �
<br /> �AST�N�R SHEET A1.0 � .. � z z
<br /> 3 8"ScTTING B-D HM FRAME HEADER -SEE �`� W Cn � Q U
<br /> / N � STRUCTURAL � '.: FLASHING & DRAINAGE PER � z 0 I �
<br /> HEADER- �
<br /> SID�WALK PAASHING METAL E.I.F.S. REQUIREMENTS. � O Z Q �
<br /> �- � 5/8"GYP. SEE f-- I— W •
<br /> HEADER-SEE
<br /> CV N BOARD SCHEDULE ' STRUCTURAL ALUM. FLASHING SAME FIN.AS STRUCTURAL U � J � �
<br /> � ' 4 � ,� FINISH �� WINDOW. W Z — � �'—
<br /> �J ' � NO E.I.F.S. DRAIN 3/8"SHIM, BACKER ROD, STOREFRONT F— = z � Z
<br /> �XPANSION �II I FR � . . SCREED STRIP, USE SEALANT&LAG BOLT BACK PLATE — � 0 �
<br /> ALIGN AS SHOWN WITH U N D E R W R A P Q � TO SUPPORT = � � �
<br /> ' � .� � EDGE OF SLAB 3 i W Q INTFRIOR EXTERIOR R O SHIM � z � �
<br /> ' SEALANT&
<br /> � 4 � Q Q � . BACKER ROD CJ U� SILICONE 4 � � � ¢ -
<br /> Q WD. DOOR 4 3/8" BACKER ROD& 3/8' SHIM Q � � J
<br /> ' �..
<br /> . . Q �. N ANODIZED ALUMINUM LAG BOLT Q � � � O
<br /> . � SEALANT WINDOW FRAME- SEE &WASHER W N m � x
<br /> � EXTERIOR �� STAINLESS
<br /> INTERIOR WINDOW SCHEDULE. ANODIZED ALUMINUM WINDOW � Cn
<br /> NOT�: S�� D-TAIL 16/A6.1 FOR ADDITIONAL INFORMATION FiEGARDING WATER ALIGN FRAME WITH FRAME-SEE WINDOW SCHEDULE. ^ �
<br /> PROOFING AT AND NEA�WINDOWS/DOORS SUBSTRATE AS NOTED ON STEEL FACE OF SHEATHING ALIGN FFiAME AS SHOWN � �
<br /> SHEET A1.0 SERVICE DOOR- SEE DOOR 3/8"SHIM, LAG BOLT&
<br /> SCHEDULE-ALIGN FRAME WASHER O
<br /> . � �
<br /> WITH FACE OF SHEATNI
<br /> �� - �_ �� N.M. DOOR 3" = 1�_0° 13 HEAD / JAM� @ SERVICE DOOR 3" = 1'-0�� g WINDOW FiEAD @ DRIVE T�IRU 3" = 1'_0" 5 T1fPICAL WINDOW HEAD 3" _ �'-o" 1 z o
<br /> S I L L @ F U L L F I E I G H T O P E N I N G S 3 1 0 1 5 J A M B @
<br /> o z
<br /> _ -�
<br /> � � .
<br /> �.
<br /> ANODIZED ALUMINUM
<br /> WINDOW FRAME- SEE SILICONE 12331 - _
<br /> NOTE: ANODIZED ALUM. WINDOW SCHEDULE. ALANT OVER REGISTERED
<br /> 5�� SEE FLOOR FINISH WINDOW FRAME-ALIGN ALIGN FRAME WITH LAG BOLT ARCHITECT
<br /> 2x FRAMING 3�� PLAN FOR FLOOR PAQUE PA ELF RA�ME POLYWOOD ACE 0 �
<br /> FINISHES ��
<br /> ANODIZED ALUM. SILL G BOLT& RUSSELL T. ARBUCKLE
<br /> �,� ''��'�'li��'' �� INTERIOR RECEPTOR.W/ WASHER STATE OF WASHINGTON
<br /> 2ND SURFACE EXTERIOR CAUI K JOINT MTL°Z�END DAMGNO/
<br /> WATER 20 GA. S.S.WALL GUARD- SEALANT AT FLASHING WEEP HOLE "PLASTIC
<br /> � SERVICE DOOR- TOP OF SILL JAMB TO BACKER ROD& ��� SHIM
<br /> BUTYL FLASHING PROOFING SEE DOOR JAMB-A�ACH W/CONST. TO ALLOW WEEPAGE
<br /> APPLIED OVER CAULK
<br /> TAPE AT TOP OF SCHEDULE AND ADHESIVE WITHIN FRAME ANODIZED ALUM. OLID �
<br /> HEADER-SEE BLDG PAPEFi STUDS & SCOPE OF WORK �
<br /> � FLASHING S LRFACE ' \
<br /> STRUCTURAL PLYWD :
<br /> FINISH FLOOR R.O. � > a
<br /> . .� .. .,.� �;,,..���.
<br /> 1/2" GYP. BOARD BUTYL FLASHING '`� � PLASTIC OVER CONCRETE N EXTER�OR TAPE OVER ���, ������������'���
<br /> _ II TAPE APPLIED \ 3�8„ SLAB INTERIOR � :� ��
<br /> E L. 7'-2 R.O. P R I O R T O B L D G 1/2"PLYWO BLDG PAPER D.A.BENTIEY CONSTRUCTION,LLC
<br /> EL. 8'-0 5/8" R.O. AT SIM PAPER W/3" MIN. SPACER ADA COMPLIANTP A C I F I C N O R T H W E S T O F F I C E
<br /> 2"G.W.B. 10709 NE COXLEY DRIVE
<br /> � CASED OPENING � FIAP SHIM ALUMINUM XTERIOR FINISH VANCOUVER,WA 98662
<br /> THRESHOLD- SEE ELEVS.
<br /> PH.360.695.9234
<br /> SET IN SEALANT �� INTERIOR
<br /> 2ND SURFACE ••��.� .
<br /> (PEMCO 157A) EXTERIOR FAX 360.695.9634
<br /> '�- WATEF3 �`.;,,:..;:\\�"' ./ ' . � MIDWEST OFFICE
<br /> � • � EXTERIOR FINISH 871 CANTERBURY RD.,UNIT G
<br /> PROOFING a . �
<br /> PPLIED OVER ;; PRE-MOLDED n a . ' ' � WFAX 40.25�0.2501 5
<br /> SEE ELEVS. PH.440.250.2500
<br /> A
<br /> STUDS & �� EXPANSION JOINT NOTE: SEE DETAIL 16lA6.1 FOR ADDITIONAL INFORMATION REGARDING WATER
<br /> NOTE: SEE DETAIL 16/A6.1 FOR ADDITIONAL WFORMATION FiEGARDING WATER ��
<br /> PLYWD \. PROOFING AT AND NEA'R WINDOWS/DOORS PROOFING AT AND NEAR WINDOWS/DOORS
<br /> PROPRIETARY INfORMATION NOTICE:
<br /> \ A
<br /> \ THRESHO�D @ SERVI�E DOO� 3�� — 1�-O�� 1 � WI�VDOW SILL @ DRIVE THRU 3�� — I�_��� 6 T�YPICAL WINDOW SILL 3 — � -0 L THESEDOCUMENTSMAYCONTAIN
<br /> CASED OPENING DETAIL 3 — 1 -� � � PROPRIETARY WFORMATIONTHATISTHE ,
<br /> WOOD SOLE PROPERTY OF YUM BRANDS,WC. SUCH
<br /> NOTE: WOOD SILLS
<br /> EXTEND FACE OF ALUM &JAMBS SHALL BE FRAMING INFORMATION HAS BEEN PROVIDEDT
<br /> ARCHITECT OF RECORD FOR USE
<br /> SPECIFICALLY fOR THIS PROJECT. THE DESIGN
<br /> ELEMENTS EMBODIED IN THESE DOCUMENTS
<br /> ANGLE FOR CAULK& PRESSURE
<br /> ARE SPECIFICALLY FOR THIS PROJECT.
<br /> BACKER ROD TREATED PLYWOOD
<br /> WALL 2O GA. S.S.WALL GUARD- INFORMATION CONTAINED HEREIN R
<br /> END DAM @ SHEATHING SUBSTRATE- INTERIOR THESOLEPROPERTYOFYUMBRANDS,INC
<br /> TOP OF SILL TO BOTTOM AND/OR EAARCHITECTURE&DESIGN,INC.
<br /> SEE SHEET A1.0 AND IS CONFIDENTIAL AND PROPRIETARY
<br /> FIFS DRAINAGE � �� OF CLG. -ATTACH W/ INTERIOR AND IS NOTTO BE COPIED,REPRODUCED,
<br /> CHANNELS SEE WINDOW BOT.
<br /> TRACK WATER PROOFING ROUGH OPENING INTERIOR
<br /> DISCLOSED OR OTHERWISE TRANSFERED T
<br /> CONST. ADHESIVE OTHER PARTIES IN ANY FORM WHATSOEVER
<br /> DTL. 7/A6.2 „ 2" ,, ANODIZED ALUMINUM
<br /> 795 DOW CORNING CAULK JOINT �--�- WINDOW FRAME-SEE �RICH ECfURE�&D SIGN,�j AEN CONSENT �
<br /> SILICONE (OR EQ.) WINDOW SCHEDUL .
<br /> OVER LAG BOLT/ AFTER FRAMWG 2ND SURFACE WATER PFi00FING PER EIFS MANUFACTURER. > ;
<br /> . .. . . . . : : . ••. . .. . •: r :. • • .:. .:. :,
<br /> •... .. . . ..
<br /> :•,:� .::: . ..:.. . . .. .... ANODIZED ALUM. . . . . . . .. ;.�..�.,... ... . . .. .. :r
<br /> WASHER THRU ADD FLASHING TAPE AROUND TH� ROUGH OPENING FOR THE WINDOW AND D/T WINDOW
<br /> BOT.TRACK(TYP) & DOOR OPENING FRAME HOLD 3/8" q REVIEW CKSET 6.25.201
<br /> 2ND SURFACE AT END DAM B •
<br /> SPACE FOR REVIEW CKSET 8.2.201
<br /> WATER 2x FRAMING � AGENCY REVIEW 8.10.201 "
<br /> BACKER Fi
<br /> PROOFING
<br /> APPLIED OVER O�D 3 g"
<br /> STUDS & SPACE FOR p DESIGN REVIEW 19.7.201
<br /> BACKER ROD PLYWOOD
<br /> PLYWD SHEATHING E
<br /> _ F MISC REV'SN 11.29.201
<br /> c���t- c��d-
<br /> � ADD SILL RECEPTOR AND END DAM
<br /> G REVIEW RE . 2.420
<br /> 3 i i ---- -- �`.
<br /> ;, '
<br /> WINDOW BOT. ���C�°� THIS DIAGRAM SHOWS THE APPLICATION OF SILL RECEPTOFi AND VERTICAL 4 P�YWD SHEATHING BACKER ROD E.I.F.S. - ,
<br /> TRACK (SII L " � \., EIFS ADHESIVE DRAINAGE CHANNELS. USE 100% PURE ISOPROPYL ALCOHOL 1 1/2° DRAINABLE E.I.F.S.
<br /> AND SEALANT --- `
<br /> _ ----
<br /> RECEPTOR) \ TO CLEAN METAL SURFACE PRIOR TO APPLYING SILICONE. 1 1/2" DRAINABLE E.LF.S. CONT. 3/4"X 1 1/2°X ' ;
<br /> �....... . :, WOOD PLYWOOD SHEATHING �� 26 GA ALUM ANGLE
<br /> EXTERIOR FOR CALKING BED
<br /> 3/8°SPACE � CONTRACT DATE: 04.10.18
<br /> CONTINUOUS AFiOUND FRAMING EIFS SYSTEM
<br /> .,
<br /> � SEE DTL. 7/A6.2 EXTERIOR
<br /> � ,
<br /> ENTIRE WINDOW `\;�� EXTERIOR
<br /> \ PLYWOOD BUILDING TYPE: M40-EXP.LT
<br /> ° WALL • GLAZING SYSTEM N07E: SEE DETAIL 16/A6.1 FOR ADDITIONAL INFORMATION REGARDWG WATER NOTE: SEE DETAIL 16/A6.1 FOR ADDITIONAL WFORMATION REGARDING WATER
<br /> WEEP HOLES @ 24 O.C. PROOFING AT AND NEAR WINDOWS!DOORS PLAN VERSION: XX-XX
<br /> U�
<br /> SHEATHING � . !I'�iP�. ',,
<br /> PROOFING AT AND NEAR WINDOWS/DOORS
<br /> ' BRAND DESIGNER: D.Dickson
<br /> �� �� � 3�� - 1�-0� 11 WIN�OW JAMB DRIVE THRU 3° = 1'-0" 7 �PICAI. WINDOW JAM� 3" _ �'_�" 3 sITE NUMBER: XXX-XXX
<br /> . E.I.F.S JAIVI� � SERVICE Dd01� - ' C
<br /> STOREFRONT STORE NUMBER: 22602
<br /> � WINDOW BODY �
<br /> . �,,
<br /> � � � � �. � � TACO �ELL ;
<br /> � � ' ' // SUBSTRATE-
<br /> SUBSTRATE-
<br /> SEE SHEET A1.0 2727 BROADWAY ST.
<br /> SEE SHEET A1.0 INTERIOR ,
<br /> I (3) 2X6 EVERETT,WASHINGTON 98201
<br /> ANODIZED ALUMINUM HOLD 3/8" SPACE FOR SEE STRUCTURAL
<br /> � EXTERIOR INTERIOR INTERIOR BACKER ROD DRAWINGS
<br /> WINDOW FRAME- SEE
<br /> I WSERT FLASHING BELOW SILL
<br /> RECEPTOR THEN CAULK WINDOW SCHEDULE. ANODIZED ALUMINUM
<br /> _ _ _ _ _ _ _ _ _ _ _ ��_� ANODIZED ALUMINUM ALIGN FRAME WITH WINDOW FRAME- SEE
<br /> - - , � �� DOOR-SEE DOOR FACE OF SHEATHING WINDOW SCHEDUL . �
<br /> � � �. � . �� SCHEDULE ��^O
<br /> - - - - - - - - � - - - -.- - - -.- -� o <CO
<br /> �- WINDOW FLASHING - � '
<br /> � ��L�
<br /> WINDOW ELEVATION MAINTAIN POSITIVE ALUMINUM � �.
<br /> DRAINAGE AWAY FINISH TO MATCH . � . CONCRETE SLAB PLYWOOD M4O
<br /> NOTE: THERE STOREFRONT � ' � BACKER ROD &CAULK ON TOP SHFATHING
<br /> SHOULD BE A 3/8" FROM WALL AT � . . OF SILL FLASHING
<br /> ALL FLASHING . . . . _ EXPLORER LIGHT
<br /> SPACE AROUND NOTE: DO NOT CAULK/ � ADA COMPLIANT .
<br /> THE ENTIRE OBSTRUCT WEEP HOLES ' . ALUMINUM THRESHOLD �I�
<br /> WINDOW FRAME TO DRILLED IN SILL RECEPTOR . -SET IN SEALANT DRAWN BY:
<br /> AI LOW FOR A (PEMCO 157A) � BACKER ROD PLYWOOD EA JOB: �jT 036M
<br /> CONTINUOUS RING AND SEALANT
<br /> � OVER BUILDING PAPER 4%2' BACKER ROD SHEATHING E.I.F.S.
<br /> OF BACKER ROD
<br /> AND CAULK SIMILAR � OVER 1/2"PLYWOOD AND SEALANT SI
<br /> TO A TYPICAL NDOW SYSTEM 21i2" E.I.F.S. OVER BUILDING PAPER EAK METAL
<br /> COMPLETING WI PFiE-MOLDED ��d BREAK METAL OVER 1/2"PLYWOOD TO MATCH SHEET:
<br /> GASKET ON A EXPANSION JOINT . � a . ' TO MATCH STOREFRONT EXTERIOR �Ai SUCTION
<br /> � BOTTLE TOP. . Q a STOREFRONT
<br /> a SET STOFiEFRONT WINDOW, APPLY EIFS SYSTEM AND THEN ADD WINDOW .
<br /> � FLASHING OVER TOP OF EIFS AT WINDOW SILL EXTERIOR DOOR-WIND
<br /> N NOTE: SEE DETAIL 16/A6.1 FOR ADDITIONAL INFORMATION REGARDING WATER
<br /> �, PROOFING AT AND NEAR WINDOWS/DOORS SHEET: A�• i .
<br /> � s�� _ ��_o�� 12 �TOREFRONT JAM� DETAIL 3" _ �'-o" 8 ST013E�RONT JAMB DETAIL 3" = 1'_0" 4 .
<br /> � NTS 1 Q, STOREFRONT DOOR SI O.L
<br /> N TYPICAL WINDOW WALL WATER PRnOFING
<br /> �
<br /> 00 O EA ARCHITECTURE & DESIGN, INC. AGENCY REVIEW RESPONSE PLOT DATE: 2.4.20 9
<br />
|