|
GENERAL NOTES PROJECT TEAM DRAWING INDEX
<br /> aQ
<br /> � �
<br /> 1. ALL CONSTRUCTION SHALL COMPLY WITH THE 2012 INTERNATIONAL BUILDING CODE AS ADOPTED BY I NTE RI ORS O � �
<br /> THE CITY OF EVERETT,WASHINGTON STATE REGULATIONS WASHINGTON STATE ENERGY CODE,AND OWNER p�..� ^ �
<br /> ALL APPLICABLE LOCAL CODES,ORDINANCES,AND STANDARDS. H 9LN.COMMERCIAL STN SUITE 165 I DO.O G E N E RAL N OTES PROJ ECT TEAM � � � � N
<br /> � � �, �
<br /> 2. CONTRACTOR IS TO VERIFYALL EXISTING CONDITIONS,DIMENSIONS,DETAILS,ETC.,AND NOTIFY THE BELLINGHAM,WASHINGTON 98225 ABBREVIATI ON, DRAWI N G I N DEX ' Z > �N O
<br /> OFFICE:360 647-1916
<br /> ARCHITECT OF ANY AND ALL DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK. C O N T A C T: M A R K (7 � � �y �
<br /> 3. ALL ITEMS MARKED"N.I.C."ARE NOT PART OF THIS CONTRACT. I D� .00 F L00 R P LAN � � � � �
<br /> 4, ALL WORK SHALL BEAPPLIED IN ACCORDANCE WITH THE MANUFACTURER'S LATEST RECOMMENDATIONS I D�.O� DEMOLITION PLAN SOUTH W � � � N
<br /> ORWRITTENDIRECTIONS. ID�.02 DEMOLITION PLAN NORTH A � � �' �'
<br /> � INTERIOR DESIGN GROUP
<br /> 5. DO NOT SCALE DRAWINGS;DIMENSIONS GOVERN.THE CONTRACTOR SHALL NOTIFY ARCHITECT ZENA DESIGN GROUP I D� .O3 FLOOR PLAN SOUTH - z � �
<br /> IMMEDIATELY OF ANY AND ALL DISCREPANCIES. CONTRACTOR SHALL CONSULT OWNER'S 1829 QUEEN ANNE AVE.N.,SUITE D a �%1
<br /> REPRESENTATIVE WHEN ADDRESSING QUESTIONS OF MATERIAL,METHODS,DETAIL OR WORKMANSHIP SEATTLE,WA 98109 I D� .O4 F L00 R P LAN NO RT H W N
<br /> NOT COVERED IN THE CONTRACT DOCUMENTS. OFFICE;206-622-9112 �
<br /> 6. ALL DIMENSIONS ARE FROM FINISH FACE OF WALL UNLESS OTHERWISE NOTED.
<br /> CONTACT:BETTYBLOUNT ID� .05 FLOOR FINISH PLAN SOUTH N �
<br /> 7. WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF THE WORK,THE I D� .O6 F L00 R F I N I S H P LAN N 0 RTH
<br /> DETAILSSHALLBETHESAMEASFOROTHERSIMILARWORK. ID� .O7 FURNITURE PLAN SOUTH
<br /> GENERALCONTRACTOR ID1 .08 FURNITURE PLAN NORTH
<br /> 8. WHERE DEVICES OR ITEMS OR PARTS THEREOF ARE REFERRED TO IN SINGULAR,IT IS INTENDED TBD
<br /> THATSUCHSHALLAPPLYTOASMANYSUCHDEVICES,ITEMSORPARTSASAREREQUIREDTO IDZ.00 REFLECTED CEILING PLAN SOUTH
<br /> PROPERLY COMPLETE THE WORK. + ��� i v
<br /> .
<br /> r,,�,,; , ��
<br /> ID2.01 REFLECTED CEILING PLAN NORTH �, ��" ';°I
<br /> 9, CONTRACTOR SHALL VERIFY ALL"BUILDING STANDARDS"WITH BUILDING OWNER PRIOR TO -
<br /> BEGINNING ANY WORK. HOWEVER,THERE SHALL BE NO DEVIATIONS WHATSOEVER FROM THE I DZ.02 E LECTRI C P LAN N 0 RTH I I I I T
<br /> CONTRACTDOCUMENTSWITHOUTTHEARCHITECT'SWRITTENAPPROVALTHEREOF.THE iD2.O3 ELECTRIC PLAN NORTH
<br /> CONTRACTOR AGREES TO DEFEND,INDEMNIFY,AND HOLD THE ARCHITECT HARMLESS FROM ANY
<br /> CWMS ARISING AS A RESULT OF UNAPPROVED CHANGES.
<br /> ID3.00 ELEVATIONS SOUTH
<br /> 10 SHOWN HEREON OR NOT AND 0 PROTECT HEM FROM DAMAGE.THE CONTRACTORISHALL EAR ALL I D3.O� ELEVATIONS SOUTH
<br /> EXPENSE OF REPAIR OR REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGED BY OPERATIONS I D3.O2 ELEVATI O NS SO UTH ¢ ` � v 0 s� � � � , � �
<br /> IN CONJUNCTION WITH THE EXECUTION OF HIS WORK.
<br /> ID3.03 ELEVATIONS SOUTH
<br /> 11. THE CONTRACTOR WILL VERIFY AND CONFORM TO ALL REQUIREMENTS OF ALL UTILITY COMPANIES I D3.O4 E LEVATION S SO UTH ❑ ❑
<br /> UNLESS OTHERWISE NOTED IN THE PLANS AND SPECIFICATIONS. I D3.O5 ELEVATIONS NORTH
<br /> 12. SHOULD A CONFLICT OF INFORMATION EXIST IN THE CONSTRUCTION DOCUMENTS,THE CONTRACTOR I D3.O6 ELEVATIONS NORTH �
<br /> SHALL CONTACT THE ARCHITECT IMMEDIATELY. �
<br /> 13. SUBMITfALS ARE REQUIRED AND MUST BE SIGNED BY THE OWNER OR DESIGNER BEFORE WORK I D3.O7 ELEVATI O NS NORTH r T 1
<br /> BEGINS. INCLUDED MSDS WITH ALL SUBMITfALS. ROUTE ALL SUBMITTALS TO DESIGNER. I D3.OH ELEVATIONS NORTH �,
<br /> ID3.09 ELEVATIONS NORTH � �
<br /> 14. APPROVED PLANS SHALL BE KEPT IN A PLAN BOX AND SHALL NOT BE USED BY ANY WORKERS.ALL �
<br /> CONSTRUCTION SETS SHALL REFLECT THE SAME INFORMATION AS WELL AS ALL REVISIONS,ADDENDA,
<br /> AND CHANGE ORDERS.THE CONTRACTOR SHALLALSO MAINTAIN IN GOOD CONDITION,ONE COMPLETE (D3.�O ELEVATIONS NORTH �
<br /> SET OF PLANS WITH ALL REVISIONS,ADDENDA,AND CHANGE ORDERS,ON THE PREMISES AT ALL TIMES W
<br /> ID3.11 ELEVATIONS NORTH � W
<br /> _
<br /> WH H ARE T BE UNDER THE CARE OF THE JOB SUPERINTENDENT. I D3.�2 ELEVATIONS NORTH y
<br /> 15. DEMO AND REMOVE EXISTING PLANTERS AND THEIR CONTENTS. �
<br /> � 16. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND COORDINATING ALL WORK ASSOCIATED WITH I D3.�3 E LEVATI ON S NORTH � W uJ
<br /> FLOOR PENETRATIONS,INCLUDING MEANS AND METHODS OF DETECTING AND PROTECTING REINFORCING. 3 O O T � 0
<br /> 17. PATCH AND REPAIR ALL EXISTING SURFACES AS REQUIRED BY DEMOLITION AND NEW CONSTRUCTION I D3.15 ELEVATIONS SOUTH � � U
<br /> TO RECEIVE NEW SCHEDULED FINISHES. ALL SURFACES ARE TO HAVE"LIKE-NEW"APPEARANCE. � �
<br /> 18. ELECTRICAL ROUGH-IN AND REFLECTED CEILING PLAN ARE FOR THE GENERAL INFORMATION OF THE �"T 1
<br /> CONTRACTOR. EXACT LOCATIONS SHOULD BE VERIFIED. A B B R E V I AT I O N S I D4.O� D ETAI LS ��i �
<br /> 19. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE MANUFACTURER'S LATEST I D4.O2 DETAI LS Q
<br /> RECOMMENDATIONS OR WRITTEN DIRECTIONS. @ AT GFRC �LASS FIBER REINFORCED CONCRETE
<br /> I D 4.0 3 D E T A I L S
<br /> 20. THE CONTRACTOR SHALL ENSURE THAT THIS PROJECT AND ALL CONSTRUCTION ACTIVITIES RELATED # POUND OR NUMBER GL S G ASS FIBER SURFACED I D4.O4 D ETAI LS
<br /> THERETO CONFORM WITH ALL LOCAL,REGIONAL,STATE,AND/OR FEDERAL REGULATIONS PERTAINING AB ANCHOR BOLT G.W.B, GYPSUM WALLBOARD
<br /> TO DISTURBING,DISPLACING,AND/OR REMOVAL OF ASBESTOS OR ASBESTOS CONTAINING ACT ACOUSTICAL CEILING TILE HC HOLLOW CORE I D4.O5 DETAI LS
<br /> ADJ ADJUSTABLE I D4.O6 DETAI LS
<br /> MATERIALS. AFF ABOVE FINISH FLOOR HDWD HARDWOOD
<br /> • ALUM ALUMINUM HDWR HARDWARE
<br /> 21. JOB SITE SAFETY: THE DESIGNER HAS NOT BEEN RETAINED OR COMPENSATED TO PROVIDE DESIGN ACP ASPHALT CONC PAVING HDRL HANDRAIL I D4.O7 D ETAI LS
<br /> AND/OR CONSTRUCTION REVIEW SERVICES RELATED TO THE CONTRACTOR'S SAFETY PRECAUTIONS OR BD BOARD DM NSIDE DIAMETER I D4.OH D ETAI LS
<br /> TO MEANS,METHODS,TECHNIQUES,SEQUENCES OR PROCEDURES FOR THE CONTRACTOR TO PERFORM BLDG BUILDING INSUL INSULATION
<br /> HIS WORK. THE UNDER-TAKING OF PERIODIC SITE VISITS BY THE ARCHITECT/ENGINEER SHALL NOT BE BM B�M INT INTERIOR I D4.O9 D ETAI LS
<br /> CONSTRUED AS SUPERVISION OF ACTUAL CONSTRUCTION NOR MAKE HIM RESPONSIBLE FOR PROVIDING BOT BOTTOM �T JOINT
<br /> A SAFE PLACE FOR THE PERFORMANCE OF WORK BY THE CONTRACTOR,SUBCONTRACTORS, SUPPLIERS BRG BEARING LVL LAMINATED VENEER LUMBER I D4.�O DETAI LS
<br /> OR THEIR EMPLOYEES,OR FOR ACCESS, VISITS,USE,WORK,TRAVEL OR OCCUPANCY BY ANY PERSON. gUR BUILT-UP ROOFING MAS MASONRY (D4.� � DETAI LS
<br /> CAB CABINET MAX MAXIMUM ID4.�2 DETAILS
<br /> 22. THE BUILDING WILL REMAIN OPEN DURING CONSTRUCTION-ALL SAFETY AND PROTECTIONS NEED TO CFT CERAMIC FLOOR TILE MECH MECHANICAL
<br /> BE OBSERVED TO ENSURE HOTEL GUESTS AND STAFF SAFETY. CJT CONTROL JOINT MFT MARBLE FLOOR TILE I D4.�3 DETAI LS
<br /> 23. THE BUILDING REQUIRES ALL CONTRACTORS,SUBCONTRACTORS AND VENDORS TO FOLLOW ALL � CENTER LINE MT MIRROR TILE
<br /> MTL METAL I D4.14 D ETAI LS
<br /> FEDERAL,STATE 8�LOCAL SAFETY REQUIREMENTS AND GUIDELINES OUTLINED BY OSHA 8�WISHA. CMU CONC ETE MASONRY UNITS MFR MANUFACTURER
<br /> MIN MINIMUM I D 4.1 5 D E T A I L S
<br /> 24. THE BUILDING REQUIRES ALL CONTRACTORS TO PROVIDE COPY OF COMPANY LIFE SAFETY PROGRAM COL COLUMN MO MASONRY OPENING
<br /> AND FALL PROTECTION AND CONDUCT WEEKLY SAFETY MEETINGS WITH ATTENDANCE ROSTER CONSTR CON TRUCTION NIC NOT IN CONTRACT I D4.�6 D ETAI LS
<br /> SUBMITTED TO OWNER'S REP. CONSTR JT CONSTRUCTION JOINT NTS NOT TO SCALE
<br /> 25. THEBUILDINGISANON-SMOKINGFACILITY, SMOKINGISONLYALLOWEDOFFPREMISES. CONTR CONTRACT(Of� P� PARTICLEBOARD IDS.00 FINISH SCHEDULE
<br /> 26. WORK HOURS:SEVEN(7)DAYS A WEEK-5:00 AM TO 5:00 AM. CORR CORRIDOR P� P�T I DS.O� D 00 R S C H E D U L E
<br /> 27. WORK THAT CREATES NOISE MUST BE COORDINATED WITH OWNERSHIP AT LEAST TWO DAYS PRIOR TO CPT CARPET P-�M PLASTIC LAMINATE
<br /> gT,o,�T� �T CERAMICTILE PLYWD PLYWOOD ID5.02 LIGHTING SCHEDULE
<br /> 28. ALL DELIVERIES MUST BE COORDINATED WITH CLUB AT LEAST 2 DAYS PRIOR TO DELIVERY, CTSK COUNTERSINK QT QUARRY TILE �
<br /> DET DETAIL RB RESILIENT BASE Q
<br /> 2g. DUMPSTERS MUST BE COORDINATED WITH THE OWNERSHIP PRIOR TO SET DOWN. � DIAMETER REINF REINFORCE(D) (ING) � _
<br /> DIM DIMENSION RFG ROOFING � C� �
<br /> 30. ALL OPERATIONS CONDUCTED ON THE PREMISES SHALL NOT BE OBJECTIONABLE BEYOND THE RM RM p �
<br /> PROPERTY BOUNDARY LINES BY REASON OF NOISE,STEAM,ODOR,FUMES,GASES,SMOKE,VIBRATION, DN DOWN RO ROUGH OPENING N p
<br /> HAZARD OR OTHER CAUSES. IN ADDITION,THE CONTRACTOR SHALL MINIMIZE DISRUPTIONS OF BUILDING DS DOWNSPOUT RS ROUGH SAWN m N
<br /> EA EACH � m
<br /> OCCUPANTS DUE TO NOISE,ODOR,FUMES,OR VIBRATION. AT THE END OF CONSTRUCTION THE Eg EXPANSION BOLT SC SOLID CORE
<br /> CONTRACTOR SHALL COMPLETELY CLEAN ALL AREAS SOILED BY CONSTRUCTION ACTIVITIES INCLUDING SCH SCHEDULE d�
<br /> EIFS EXT INSUL FIN SYSTEM }-
<br /> THOSE IN WHICH NO WORK WAS DONE. ELEC ELECTRICAL SEC SECTION Q m m Z
<br /> 31. ALL WORK SHALL BE GUARANTEED FOR A PERIOD OF(1)YEAR AFTER COMPLETION UNLESS ELEV ELEVATION SIM SIMILAR � Z z � �
<br /> SPEC SPECIFICATION � � Q
<br /> OTHERWISE SPECIFIED,AND SHALL BE SO STATED IN CONTRACTOR'S WRITTEN PROPOSAL AND EQ EQUAL gq SQUARE
<br /> AGREEMENT. ALL REPAIRS,CORRECTIONS,DISCREPENCIES,ECT„MUST BE MADE WITHOUT ANY EQUIP EQUIPMENT STL STEEL
<br /> ADDITIONAL COST TO THE OWNER,AND WITHIN FIVE(5)DAYS AFTER NOTICE IS GIVEN. EXIST EXISTING SV SHEET VINYL p p � � a
<br /> EXP JT EXPANSION JOINT T 8�B TOP AND BOTTOM
<br /> EXT EXTERIOR TEMP GL TEMPERED GLASS
<br /> FDN FOUNDATION TYP TYPICAL JOB. NO.
<br /> FECB FIRE EXTINGUISHER CAB V.I.F. VERIFY IN FIELD '
<br /> FIN FINISH(ED) W� W�TH ��17�� O
<br /> FL FLOOR WD WOOD
<br /> FRT FIRERETARDENTTREATED WpW WINDOW SHT. NO.
<br /> FT FOOT OR FEET yyT WALL TILE
<br /> FTG FOOTING yy�p WITHOUT
<br /> FUR FURRING WR-GL WIRED GLASS
<br /> GA GAUGE WSCT WAINSCOT I D O■OO
<br /> GALV GALVANIZED yy�F WELDED WIRE FABRIC �
<br /> GC GENERALCONTRACTOR
<br /> J
<br />
|