Laserfiche WebLink
EXCERPTS OF THE 2Q I 5 Interna�ional Residential Code: Pal't III CHAPTER 6 WALLS (THESE EXCEPTS DOES NOR RELEASE YOU FROM YOLIR RESPONSIBILITY OF THE I.R.C.) ����% '[v� Y <br /> � �r <br /> �" � <br /> ���� � <br /> �--�����,���'�- <br /> TABLE R602.3(I) TABLE R602.3(I)--continued FIRGURE R602.6(I) �'��"� '� �'` ��� �` ' � <br /> �����"����������` .,���,���,° <br /> FASTENER SCHEDULE FASTENER SCHEDULE NOTCHING AND BORED HO�ES <br /> ITEM DESCRIPTION OF BUILDING ELEMENTS NLIMBER AND TYPE SPACING AND LOCATION ITEM DESCRIPTION OF BUILDING ELEMENTS NUMBER AND TYPE OF FASTENERa, b, c SPACING AND LOCATION <br /> LIMITATIDNS FOR EXTERIOR WALLS AND BEARING WALLS Precisiora F� Gr�rce <br /> OF FASTENERa, b,c <br /> 6619 I 32nd Ave NE <br /> Post Mail Box 242 ` <br /> ROOf 3-16d box(31/2 " x 0.135");or�-16d Kirkland, WA 98033-8627 <br /> 24 2" subfloor to joist or girder common (3 I/2 " x 0.162") Blind and face nail TOP PLA7ES <br /> 4-Sd box(2 I/2 " x 0.I I3")or , <br /> . 3-8d common(� I/2 " x 0.131 ");or 2 5 2" lanks lank�beam--floor�roof 3-16d box(31/2 " x 0.135");or�-16d At each bearin face nail �:y <br /> I Biocking between cei(ing joists or rafters to top plate Toe nail � (� � g� 206-619-3995 <br /> 3-I Od box(3" x 0.I�S");or common(3 I/2 " x 0.I 62") <br /> 3-3" x 0.I 31 " nails 3-I 6d box 3 I/2 " x 0.I 35" ; or ! 2eclectic7@gmail.com � ' <br /> �6 6and or rim joist to joist � � End nail BORED HOLE MAX. STCID Skype:eclecticseven <br /> 4-Sd box(� I/2 " x 0.�I 3")or 2-16d common (3 I/2 " X 0.I 6�"� DIAMETER 60 PERCENT <br /> 3-Sd common 2 I/2 " X 0.I 3 I " ;or OF STUD DEPTH • <br /> 2 Ceiling joists to top plate � � Per joist, toe nail 2 7 Built-up girders and beams, 2-inch lumber layers 20d common (4" x 0.19�");or Nail each layer as follows: 3�" o.c. . , <br /> 3-IOd box(3" x 0.I2S");or at top and bottom and staggered. <br /> 3-3" x 0.I 3 I " nails 24" o.c. face nail at to and bottom 5/8 IN.MIN.TO EDGE <br /> I Od box(3" x 0.1�8");or P <br /> Ceiling joist not attached to parallel rafter, laps over 4-I Od box(3" x 0.128");or 3" x 0.!3 I ° nails) staggered on opposite sides <br /> 3 partitions[see Sections R802.3.1, R802.3.2 and Table 3-I 6d common(3 1/2 " x 0.I 62"); or Face nail 5/s IN.�v��N. To E��E <br /> And:2-20d common 4" x 0.I 9�" or � <br /> R802.5.I(9)] =f-3" x 0.13 I " nails � )' <br /> Ceiling joist attached to parallel rafter(heel ioint) 3-I Od box(3" x 0.128");or Face nail at ends and at each splice NOTCH MUST NOT EXCEED r� ` <br /> =� Table R802.S.I 9 Face nail 3-3" X 0.I 3 I " nails 25 PERCENT OF STUD DEPTH v <br /> [see Sections R80�.3.I and R80�.3.2 and Table � � <br /> R80�.5.I(9)] 4-16d box(3 I/2 " x 0.I 35"); or BORED HOLES SHALL NOT BE O <br /> 3-16d common (3 I/2 " X 0.I 6�");or LOCA7ED IN THE SAME CROSS � <br /> Collar tie to rafter, face nail or I 1/4 " x �0 ga, ridge strap to q-IOd box(3" x 0.1�8")• or 2 8 Ledger strip supporting joists or rafters At each joist or rafter, face nail SECTION OF CIIT OR NOTCH IN > <br /> 5 � Face nail each rafter 4-I Od box(3" X 0.I�8");or S7UD IF HOLE IS BETWEEN�10 PERCENT AND � � • <br /> rafter 3-�Od common (3° x 0.148"); or <br /> 4-3" X 0.I 3 I " nails 4-3" X �.I 3 I " rlails 60 PERCENT OF STUD DEPTH,"THEN STL1D <br /> MUST BE DOUBLE AND NO MORE THAN TWO �,� <br /> 3-I 6d box nails (3 I/� " x 0.I 35"); 29 Brid in to 'oist 2-I Od 3" x 0.128" Each end, t02 lldll SUCCESSIVE STUDS ARE DOLIGLED A�ti�D SO � � <br /> � toe nails on one side and I toe � g 1 � I BORED <br /> 6 Rafter or roof truss to late or 3-I Od common nails(3"x 0.I 48"); � <br /> P nail on opposite side of each rafter � <br /> or 4-I Od box(3" x 0.12 8"); or or truss� For Si; I inch=25.4 mm. •O � <br /> Intermediate <br /> 4-3" x 0.I 31 " nails ITEM DESCRIPTION OF BUILDING ELEMENTS NUMBER AND TYPE OF FASTENERa, b, c Ed ges NOTE: CONDITION FOR EXTERIOR AND BEARING WALLS. •.� .,� <br /> supports�,e <br /> � 4-16d(3 I/� " x 0.135");or (inches)n (�nches) � � <br /> Roof rafters to ricige, valley or hip rafters or roof rafter to 3-IOd common (3 1/2 " x 0.148"); Toe nail _ <br /> minimum 2"ridbe beam or 4-IOd box(3" x 0.128")• or Wood structural panels, subFloor, roof and interior wall sheathing to framing and particleboard wall sheathing to framing[see Table R602.3(3) � �j p <br /> '�-3" x U.I 31 " nails for wood structural panel exterior waii sheathing to wall framing] �y � � <br /> 3-16d(3 I/2 " x 0.I 35"); or 6d common(2° x 0.I I 3")nail(subfloor, wau)� FIRGURE R602.6�2� `� <br /> 30 3/8 "- 1/2 " 6 12r � • � II �` <br /> 2-IOd common (3 I/� " x 0.I 48"); or Sd common (� I/� " x 0.13 I ")nai►(roo f� N O T C H I N G A N D B O R E D H O L E S L I M I T A T I O N S • - <br /> End nail ' _ ' <br /> 3-!Od box(3" x 0.128");or 3� �9�32 „ _ � „ Sd common nail(�I/2 " x 0.131 ") 6 ��� FOR INTERIOR NON BEARING WALLS � '� � ° ` <br /> 3-3" x D.I 3 I " nails ' <br /> Wa�� 32 1 I/8 " - I I/4 " I Od common(3" x 0.148")nail;or � � v <br /> 16d common (3 I/2 " x 0.I6�") 24" o.c. face nail S d(2 I/� " x 0.I 3 I ")de forme d nai l 6 1 2 � � �u . <br /> TOP PLATES � <br /> Other wall sheathing� � <br /> 8 Stud to stud(not at braced wall panels) IOd box(3" x 0.128");or 16" o.c. face nail � N `rv <br /> 3" x 0.I 3 I " naiis „ i 1/2"galvanized roofing nail, 7/I6 " head � � <br /> 33 I/2 structural cellulosic fiberboard sheathing diameter, or 1 " crown staplel6 ga.,I I/4" long 3 6 � � r�r, <br /> 16d box(3 I/� x 0.I 35 ) '�- <br /> " " ;or 3" x I�" o,c. face nail x <br /> Stud to stud and abutting studs at intersecting wall corners „ • I 3/4 " alvanized roofin nail, 7/16 "head S7��p = <br /> g 0.I 3 I nails 3� �5/3� " structural cellulosic fiberboard sheathin g g , BORED HOLE MAX. � <br /> (at braced wall panels) g diameter, or 1 " crown staple 16 ga., I I/4 ' long 3 6 D I A M E T E R 6 0 P E R C E N T � ry <br /> I 6d common (3 1/� " x 0.I 62") I 6" o.c. face nail OF STUD DEPTH � <br /> 16d common (3 I/2 " x 0.162") 16" o.c. each edge face nail 35 1/2 ° gypsum sheathinge � 1/� " galvanized roofing nail; staple galvanized 7 � � O � <br /> 1 0 B u i l t-u p h e a d e r(2°t o 2"h e a d e r w i t h I/2"s p a c e r) I 1/2 " l o n g; I I/4 "s c r e w s, T y p e W 5/8 I N.M I N. T O E D G E • � V � �� <br /> I 6 d b o x(3 1/2 x 0.I 3 5') I 2 o.c. e a c h e d g e f a c e n a i l or S �-� <br /> .�1 � <br /> 5-Sd box(� I/2 " x D.I f 3"); or „ 1 I/2 " galvanized roofing nail;staple galvanized, - • <br /> � � Continuous header to stud 4-Sd coriunon(� I/2 ° x 0.131 ");or Toe nail 36 5/8 gypsum sheathingd ��/� " Iong; I I/4 "screws, Type W � � 5/s IN.��uN. To E��E O <br /> �}-I Od box(3" x 0.128") or S � <br /> NOTCH MUST NOT EXCEED <br /> I6d common (3 1/2 " x 0.162") I6" o.c. face nail Wood structural panels, combination subfloor underlayment to framing 40 PERCENT OF STUD DEPTH � � <br /> �� Top plate to top plate ' <br /> BORED HOLES SHALL NOT BE � <br /> I Od box(3" x 0,128");or 12" o.c. face nail 37 3/�1 " and less 6d deformed(2" x 0.I�0")nail;or LOCA7ED IN THE SAME CROSS <br /> 3" X 0.I 3 I " nails Sd common(�1/2 " X 0.I 31 ")nail 6 �� SECTION OF CUT OR NOTCH IN � <br /> 8-I 6d common 3 I/2 " x 0.I 6�" ; Sru� � <br /> ( ) Sd common (�I/2 " x 0.I3 I ")nail;or � <br /> Double top plate splice for SDCs A-D2 with seismic braced 38 7/8 " - I " 6 12 '!` <br /> I 3 or 12-I 6d box(3 l/2 ° x 0.I 35");or Sd deformed(2[/2 " x 0.120")nail � <br /> wall line s acinv < 25' Face nail on each side of end joint �1 <br /> v b ��-�O d boX�3" X �.I�8"�; oi' , , For S I; 1 inc h =2 5.4 mm. �� - <br /> 12-3" x 0.I 3 I " nails (mmimum 24" lap spiice length each 3� � ��8 „ ���4 „ I Od common(3" x 0.I 48")nail;or 6 �� <br /> s i d e o f e n d j o i n t) S d d e f o r m e d(2 t/2 " x 0.I�0")nai l � <br /> Double top plate splice SDCs D0, D I, or D2;and braced �2_�6d 3 I/2 " x 0.I 35° <br /> w a l l l i n e s p a c i ng A �5' � � F o r S I: I i n c h = 2 5.4 m m, I f o o t = 3 0 4.8 m m, I m i l e p e r h o u r= 0.4 4 7 m/s; I k s i = 6.8 9 5 M P a. <br /> (countinued) (countinued) ' ` <br /> TABLE R602.3(I)--continued FIRGURE R602.6.1 . <br /> FASTENER SCHEDULE TOP PLATE FRAMING TO ACCOMMODATE PIPING Project Site: � <br /> I 410 Hollow Dale PI <br /> ITEM DESCRIPTION OF BUILDING ELEMENTS NUMBER AND TYPE OF FASTENER�� b�� SPACING AND LOCATION Everett, WA 98204 <br /> WALL CONSTRLICTION EXTERIOR OR BEARING WALL <br /> 16d common (3 I/2 " x 0.162") 16" o.c. face nail TABLE R602.3(I)--continued FASTENiNG SCHEDULE <br /> �:} Bottom plate to joist, rim joist, band jofst or <br /> NOTCH GREATER THAN 50 UI Illg epartment: <br /> blocking(not at braced wall panels) 16d box(3 I/2 " x 0.I 35");or ���� o.C. (aCe ndil PERCENT OF THE PLATE WIDTH Cl tY Of EVeI'2tC <br /> 3" x 0.I 3 I " nails a. Nails are smooth-common, box or deformed shanks except where otherwise stated. Nails used for framing and sheathing connections shall <br /> Bottom plate to joist, rim joist, band joist or 3-16d box (3 I/2 " x 0.I 35");or 3 each 16" o.c. face nail have minimum average bending yield strengths as shown: 80 ksi for shank diameter of 0.I 92 inch(20d common nail), 90 ksi for shank Building Code: <br /> �5 �� � �� diameters lar er than 0.142 inch but not lar er than 0.I 77 inch, and 100 ksi for shank diameters of 0.14� inch or less. 16 GAGE(05=#IN.)AND 15 IN lK�1L�E , <br /> blockin at braced wali anels 2-16d common 3 I/2 x Q 162' ; or 2 each 16 o.c. face nail g g I.R.C. 2015 . y <br /> �( � � ( ) b. Staples are I 6 gage wire and have a minimum 7/I 6-inch on diameter crown width. '��. METAL TIE FASTENED ACROSS AND <br /> 4-3° X 0.I 3 I " nails 4 each 16" o.c. face nail c. Nails shall be s aced at not more than 6 inches on center at all su orts where s ans are 48 inches or reater. TO THE PIATE AT E�CH SIDE OF THE <br /> 4-Sd box 2 I/� " X 0.1 I 3" ot' � pp p g NOTCH WITH 8- 16d NAILS EACH SIDE <br /> � ) d. Four-foot by 8-foot or 4-foot by 9-foot panels shall be applied vertically. TOP PIATEs <br /> 3-16d box(3 I/2 " x 0.I 35");or e. Spacing of fasteners not inciuded in this table shall be based on 7able R602.3(2). I , � <br /> 4-Sd common(2 I/2° x 0.I 3! ");or Toe nail f. Where the ultimate design wind speed is I 30 mph or less, nails for attaching wood structural panel roof sheathing to gable end wall I <br /> 4-I Od box(3 "x 0.I�S");or framing shali be spaced 6 inches on center. Where the ultimate design wind speed is greater than 130 mph, nails for attaching panel For SI; I inch=25.4 mm. `PIPE <br /> I 6 Top or bottorn plate to stud �}-3" x 0.I 31 " nails roof sheathing to intermediate supports shall be spaced 6 inches on center for minimum 48-inch distance from ridges, eaves and gable <br /> 3-I6d box(3 1/2 " x 0.135");or end walls;and 4 inches on center to gable end wall framing. <br /> 2-16d cornmon (3 I/2 " x 0.161"); or End nai( b• Gypsum sheathing shall conform to ASTM C 1396 and shall be instalied in accordance with GA 253. Fiberboard sheathing shall conform <br /> 3-IOd box(3 "�c 0.I�8"); or to ASTM C 208. ' <br /> . <br /> h. Spacing of fasteners on floor sheathing panel edges applies to panel edges supported by framing members and required blocking and�'.- " <br /> 3-3" x 0.131 " naiis o-=���" ° �'' ;<; ,. <br /> 3 floor perimeters only. Spacing of fasteners on roof sheathing panel edges applies to panel edges supported by framing members� i1 � :. <br /> ,� . -�,, .�,�,,:.: C4^��'red block�:no. Blocr';�^R�f,��Rf.^r;f�^^�sh���hin anel�d A�: ar�z4.^:�icular to the framin members ne n r vi :N�ce t as <br /> 3-IOd box(3 x 0.I�8 ), or -,r ��:� <.-� � 1 .,e b ; d ,;� ,, r g P ���>� � �� g ed ot be p o ded� p R,. �. x;,- �. <br /> ,.My�� r. > ; v .. . ,: - , , . <br /> nu�;. <br /> �` ,:>.d� _� - <br /> w.� <br /> �- <br /> � �':�. <br /> r .='� . <br /> To lates la s at corn r re uired b , r rovi i n ' i <br /> , , . <br /> 9�_ � <br /> , e s and intersections s o s c..:,th s code floo► :erimeter,:iall =;su orted b framin members or solid biockin . ��,:.. <br /> �� P�' �' �-I n,� � �� x :� q y �' � PP y g g � � F1R'�URE k�, `?2..:I.3 Desi ner; Vernon • <br /> 6d co nor 3 I/2 0.I 62" ; or Face nail �"' i ; �?� g <br /> � ) �g <br /> ..� <br /> :�'�:3 �. 3!' C�c,. <br /> 3a <br /> �u:� Wh r r � '�`.:a <br /> �- �� e e a a ter ::;� fastened to 'n adacer.��'� arali _e�6n a�ist in ccordance with hi s he I r " ��` <br /> „ „ , ���, >: ;. �„ � / ��,��P g;,a � t S C C�U e, p ovide two toe nails on one : '2 Of The `y �.,t � �� � <br /> ��� -,i. .� ,�a . �::, :•...,� � .,_ :�.�� • :,. , s:� ...^ r� i': �'���<�. <br /> 3-3 x 0.131 na�ls � • � � � �,:= r ;�,,.► Januar 3, 2018 <br /> '' � P� , 'S . <br /> , � �a ....a TE s F NDA TI P.: S:. <br /> r-� .� � U O C, �UCTION ::�` y <br /> :, . . . . . . ` �� , ;.. .f <br /> ;� �" i�a�ter anr. .����. ::Is from the �ilin oi to to �te i►�accord< re wiiii this schedule. The oe �I � -- � �� �.,:. <br /> �,� � g/ p��� t na on the opposite side of tf after a,:� , � �� �x� <br /> „ „ � .�;, �� shall na.�be re c: ,d. ��� ;' '�, 3. -�. f� ;s � F� . <br /> 3-Sd box(� I/2 x 0:I I3 )or ,�t „; ti_� q ���� ,� ;,,z � � ��._� 3 �;�� ,�'' Client: <br /> �_ ,_a 3' �� �:� .�° s �°��� . <br /> „ ,� s a,. , �:., ,, WF�RE FOG=`'.;'V6 SECTIION <br /> � x�tA 1 ��' t <br /> 2-8d -ommon I 2 x 0 I I r � ''� � <br /> c / . 3 0 � ,� �., ��" <br /> � �� <br /> , . <br /> , <br /> � . <br /> , ., > <br /> ,, <br /> ., <br /> _ .: ..w <,: ; <br /> „ )� - _,.- .., .�:�:a. �:� ��;��a:._ ..x�,��... ;� .��...., �.; �� ;�: <br /> . F, � <br /> r.... ,u, �� ... .��._ �_a:� � _.:. � � � ��SPLICE �.:���� � � ' � ��-:YROV►,��.. Mr Sisk <br /> � ;� , .z� ��s�. �. ,,�.�. � ._.,�:�- Mu.� . �_ �_w��,..._ � J�. I�°,,��RE 7HAh �� <br /> �g I brace to each stud and plate 2-IOd box(3 "x 0.I18");or � MfTAL TIE 16 GA. BY 1.5 BY .Id►lUd 3, 2��8 <br /> 2 staples I 3/4° rY <br /> 4 FT.M►N., EACH SIDE OF THE <br /> 3-Sd box(� I/2 " x 0.I I 3") or 2x SILL 2 Fr SPLICE W/8 16d COMMON NAILS. Design Issued <br /> �g 1 " x 6°sheathing to each bearinb 2-Sd common (2 1/2" x 0.I 3 I "); or PLATE <br /> 2-I Od box(3 "x 0.125");or Face nail � �MIN. ��-�x P�ATE ry 20 I 7 <br /> Janua 3, <br /> CONCRETE <br /> � staples I"crown, I 6ga., I 3/4"long STEPPED Bid ReIeaS2 <br /> 3-Sd box(2 I/2 " x 0.I 13")or Foorw� January 3, 2018 <br /> 3-Sd common (2 I/2" x 0.I3 I ");or 2x CRIPPLE <br /> 20 I " x 8"and wider sheathin g to each bearin g 3-IOd box(3 °x 0.128");or STUD W,�LL <br /> Structural Release <br /> 3 staples I"crown, 16ga., I 3/�F°long ,/i�/i�/i�/i�// January 22, 2018 <br /> Wider than I°x3" Face nail FOOTING SECTION"A" /�\ . <br /> �\��\i�\��\��\ Construction Issue <br /> 4-8d box(2 I/2 " x 0.I I3")or /���\��\��\�� <br /> 3-8d common (� I/2" x 0.I 3 I ");or ` ` August 7, 2018 <br /> 3-I Od box(3 "x 0.I�S")•or For SI; I inch =25.4 mm. <br /> 4 staples I"crown, I 6ga., I 3/4"long NOTE:WHERE FOOTING SECTION"A"IS LESS THAN S FEET LONG IN 25 FEET ReVISiO►1 - I <br /> TOTAL LENGTH WALL, PROVIDE BRACING AT CRIPPLE STUD WALL. <br /> Floor <br /> 4-Sd box(� I/� " x 0.I 13")or <br /> Project Number <br /> 3-8d common (� I/2" x 0.13 I "); or � O � � � <br /> 2 I Joist to sill, top plate or girder 3-IOd box(3 "x 0.128")• or Toe nail � <br /> 3 3"x 0.I 3 I"n a i l s , <br /> Sd box(2 I/2 " x 0.I I 3") 4"o.c. toe nail <br /> All I�ights Reseraed. <br /> 22 Rim joist, band joist or blocking to sill or Cop plate , . � All�ontents wirhin rh;s <br /> Sd Common�� 1/2" X 0.I 3 I '�, or sheet is the sole propert��of <br /> (roof applications also) IOd box(3 "x 0.125"); or 6'°o.e. toe nail Creaave Co�7�Eorr. , � <br /> 3°x 0.I 3 I"nails Reproduction by any means <br /> 3-Sd box�2 I/2 ° X 0.(I 3"�or � � in whole or in p.�rt requires <br /> written permission by� <br /> �3 I " x 6°subfloui'or less to each joist 2-Sd common (2 I/2" x U.I 3 I "); or <br /> Creaeine Comfort. <br /> 3-I Od box(3 "x 0.128"); or Face nail Sheet Numbe2' <br /> 2 stapJes I"crown, 16ba., I 3/�F"long � , <br /> � �� � <br /> � . <br />