My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
720 80TH ST SW JAMCO AMERICA 2018-01-02 MF Import
>
Address Records
>
80TH ST SW
>
720
>
JAMCO AMERICA
>
720 80TH ST SW JAMCO AMERICA 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2022 8:16:14 AM
Creation date
9/4/2019 9:35:06 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
720
Tenant Name
JAMCO AMERICA
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2006 <br />State Nonresidential Energy Code Compliance Form <br />Stan Nc.11esme^l a Ero1.1 Co!. CcIr a^ce1 —.r <br />Rama Jwr 2W' <br />Project Info <br />Project Address im11Co AMRICA, INC. <br />Date 12/3/2008 <br />120 - eosT sN <br />For Building Dept Use <br />SWRETT, aA 99203 <br />Applicant Name JOINNE SECHIER <br />Applicant Address. 6902 S. 220TR ST, IRNT, MA 99032 <br />Apploart Phone (4251251-9940 <br />Project Description I REPLACE EXISTING 4-TON ROOFTOP GAS PACK WITH NEW 4-TON ROOFTOP <br />Briefly describe mechanical GASPACK. <br />system type and features <br />[] includes Plans IDrawings must contain notes requireing compliance with commissioning requirements - Section 1416 <br />r!) Simple System O Complex System Q Systems Analysis <br />Compliance Option <br />(See Decision Flowchart (over) for qualifications Use separate MECH-SUM for simple 8 complex systems ) <br />Equipment Schedules <br />The following information Is required to be incorporated with the mechanical equipment Schedules on the <br />plans For projects without plans. fill in the required information below. <br />Cooling Equipment Schedule <br />Equip <br />ID <br />Brand Name' <br />Model No <br />Capacity' <br />Muth <br />Total CFM <br />OSA CFM <br />or Econo? <br />SEER <br />or EER <br />IPLV' <br />Location <br />AC-5 <br />CARRIER <br />49NJD-005 --- 6 <br />48900 <br />1600 <br />ECONO <br />13.00 <br />Poor <br />Heating Equipment Schedule <br />Equip <br />10 <br />Brand Name' <br />Model No ' <br />Capacity <br />Btulh <br />Total CFM <br />OSA cfm <br />or Econo? <br />Input Blunt <br />Output Blunt <br />Efficiency' <br />Ac-5 <br />CARRIER <br />48HJD --- 6 <br />72000 <br />1600 <br />ECONO <br />72000 <br />59400 <br />82.500 <br />Fan Equipment Schedule <br />Equip <br />ID <br />Brand Name <br />Model No <br />CFM <br />SP' <br />HP/BHP <br />Flow Control' <br />Location of Service <br />'If available. 2 As tested according to Table 14-IA through 14.1G. 3 If required. ' COP. HSPF. Combustion Efficiency or AFUE, as <br />applicable. ' Flow control types variable air volume(VA'✓), constant volume (CV), or variable creed (VS) <br />F^ <br />
The URL can be used to link to this page
Your browser does not support the video tag.