My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
720 80TH ST SW JAMCO AMERICA 2018-01-02 MF Import
>
Address Records
>
80TH ST SW
>
720
>
JAMCO AMERICA
>
720 80TH ST SW JAMCO AMERICA 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2022 8:16:14 AM
Creation date
9/4/2019 9:35:06 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
720
Tenant Name
JAMCO AMERICA
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
%19: <br />State Nonresidential Energy Code Comollance Form <br />2006 WrrWrVM Sim NonreuE0mu1 E1419r CM* Ccmphmm Fo,mr <br />Project Info <br />Project Address im co AmRicA, rNc. <br />Date 12/9,12008 <br />120-e0th et. ae <br />For Building Dept. Use <br />twrett, MA 90207 <br />Applicant Name'. aerrre Sechier <br />Applicant Address. 6602 B. 220th et., (tent, NA 9e032 <br />Applicant Phone. (/25)251-9e40 <br />Project Description Replace existing AC-1(15-ton) rooftop gas packaged unit with new 15-ton rooftop <br />Briefly describe mechanical unit with adapter curb and economizer. <br />system type and features. <br />❑ Includes Plans Include documentation requiring compliance with commissioning requirements, Section 1416. <br />Compliance Option * Simple System O Complex System Q Systems Analysis <br />(See Decision Flowchart (over) for qualifications . Use separate MECHSUM for simple 6 complex systems.) <br />Equipment Schedules <br />The following information Is required to be Incorporated with the mechanical equipment schedules on the <br />plans. For projects without plans, fill In the required Information below <br />Coolin Equipment Schedule <br />Equip. <br />ID <br />Brand Name' <br />Model No <br />Capacity' <br />Btu/h <br />Total CFM <br />OSA CFM <br />or Econo7 <br />SEER <br />or EER <br />IPLV1 <br />Location <br />Ac-1 <br />TPA= <br />vcdlec <br />182000 <br />6000 <br />ECONO <br />9.7 EEA <br />noor <br />Heating Equipment Schedule <br />Equip. <br />ID <br />Brand Name' <br />Model No <br />Capacity' <br />Btu/h <br />Total CFM <br />OSA cfm <br />or Econo7 <br />Input Btuh <br />Output Bluh <br />Efficiency' <br />Ac-1 <br />TRAM <br />Y=19D <br />210000 <br />6000 <br />ECONO <br />250000 <br />210000 <br />0.840 <br />Fan Equipment Schedule <br />Equip. <br />t0 <br />Brand Name' <br />Model No <br />CFM <br />SP' <br />HP/BHP <br />Flow Control' <br />Location of Service <br />'If available. 7 As tested according to Table 14.1A through 14.1 G. 1 If required. ' COP, HSPF, Combustion Efficiency, or AFUE, as <br />applicable. 5 Flow control typesvariable air volumelVAV), constant volume (CV), or variable speed (VS). <br />
The URL can be used to link to this page
Your browser does not support the video tag.