Laserfiche WebLink
ummn ni rue inn ems nice nvn vevw we nit. ervp m -•-• .-•.• •.. •....... -•--•-.... • ....... ..... .... . <br />three or more.lanes In h*M W+shington State Nonresidential nerdYC1158V O il"IItAW441HIPgolpment, or <br />1102.4.2 Optimum Stan Controls: Hooting On � is system$ with design Supply <br />2 ate Isolated it a *.tenor with on automatic shut-off damper complying <br />es exceeding 10,0 cfm Shell have vm start controls. Optimum <br />eh Capacities <br />with Section . t.1. <br />start controls shall be designed to automatically adjust the start time of an HVAC <br />Once outside air ducts most the above listed requirement&, any runt w6Mn <br />system each day to bring the space to desired occupied temperature levels <br />conditioned space Shall comply with Table 14.5 requirements <br />InnMedialely before mhoduiad occupancy. The control algorithm $halt, at a <br />Omer ducts and plenums shell be thermally insulated per Table 14.5. <br />minimum, be a function of the difference between space emperature and occupied <br />Exceptions: <br />selpolnt and the amount of time prof to scheduled occupancy. <br />1 Within the HVAC equipment. <br />1412.6 Host Pump Controls: Unitary air cooled host pumps shall include <br />microprocessor controls that minimize supplemental heal usage during start-up. set. <br />2 Exhaust air ducts not subject to condensation. <br />up, and defrost conditions. These controls shall anticipate need for heal and use <br />d Exposed ductwork within a tons that osrve& that zone <br />compression hosting as the first stage of heal. Controls shell Indicate when <br />1416 Piping Sysleme <br />Supplemental heating Is being used through visual moons (a 9 , LED indicators). <br />1416.1 Insulation: Piping shall be thermally insulated in accordance with Table 14.E <br />1412.E Combustion Healing Equipment Controls: Combustion healing equipment <br />Exception: Piping Installed within unitary HVAC equipment <br />with a capacity over 225,000 Blum shall hove modulating or staged combustion <br />West pipes outside the conditioned space shell be insulated in accordance with <br />control. 000 <br />Washington Stale Plumbing Code (WAC 51.26) <br />EXCEPTIONS: 1. Boller. 2. Rosiant heaters <br />1416 Completion Requirements (Reforla NREC Section fats andthe Building <br />1412.7 Balancing: Each sir supply outlet or air cr wator terminal dovice shall have <br />Commissioning GuideNnes, published by the Building CommiSSloning Association, <br />a meant for balancing, Including but nct Ilmhed to, dampers, tompersturo and <br />krcomplets text and glddeNnos for building completion and commissioning <br />pressure last connections and balancing valve. <br />requirements.) <br />