GENERAL NOTES: GENERAL CONSTRUCTION NOTES: . TEMPOARY EROSION SEDIMENT CONTROL TESC NOTES:
<br /> IE��� IHI��,
<br /> 1. WORK SHALL CONFORM TO THE 2017 EDITION OF CITY OF EVERETT DESIGN AND CONSTRUCTION STANDARDS AND 1. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE RECORDS AND 1. THE IMPLEMENTATION, CONSTRUCTION, MAINTENANCE, REPLACEMENT AND UPGRADING OF THESE ESC �r.������
<br /> SPECIFICATIONS. THESE STANDARD PLANS ARE REFERENCED TO IN THESE DESIGN DRAWINGS. A COPY OF THESE ARE SHOWN FOR CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS ���'��Q��J�
<br /> DOCUMENTS SHALL BE ON SITE DURING CONSTRUCTION. LOCATIONS AND TO AVOID DAMAGE TO ANY ADDITIONAL UTILITIES NOT SHOWN. IF CONFLICTS WITH APPROVED.
<br /> EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE ENGINEER. ANY
<br /> 2, A COPY OF THE APPROVED PLAN MUST BE ON SITE WHENEVER CONSTRUCTION IS IN PROGRESS. CHANGES REQUIRED SHALL BE APPROVED BY THE ENGINEER AND THE CITY PRIOR TO COMMENCEMENT 2. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL
<br /> OF RELATED CONSTRUCTION ON THE PROJECT. CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO INSURE THAT SEDIMENT LADEN
<br /> 3. LOCAL AND EMERGENCY ACCESS SHALL BE MAINTAINED AT ALL TIMES. WATER DOES NOT LEAVE THE SITE, ENTER THE DRAINAGE SYSTEM, OR VIOLATE APPLICABLE WATER �°5��
<br /> 2. CONTRACTOR SHALL NOTE INVERT ELEVATIONS ON EXISTING AND PROPOSED MANHOLES. NOTIFY STANDARDS. Ev��,W"s�cr°`�
<br /> 4. ALL PERMITS REQUIRED FOR WORK WITHIN THE PUBLIC RIGHT OF WAY MUST BE OBTAINED PRIOR TO THE START OF ENGINEER IF ELEVATIONS DIFFER FROM PLANS PRIOR TO ORDERING MANHOLES.
<br /> CONSTRUCTION. 3. THE ESC FACILIIIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE
<br /> 3. DO NOT ALLOW SEDIMENT LADEN WATERS TO ENTER THE PUBLIC STORM OR COMBINED SEWER SYSTEM. CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED BY THE
<br /> 5. PRIOR TO THE START OF CONSTRUCTION WITHIN THE RIGHT OF WAY, THE CONTRACTOR SHALL SCHEDULE AND AT A MINIMUM PROVIDE CB PROTECTION IMMEDIATELY DOWNSTREAM OF PROJECT. PROVIDE ADDITIONAL CONTRACTOR AS NEEDED FOR UNEXPECTED STORM EVENTS.
<br /> ATTEND A PRECONSTRUCTION MEETING IMTH THE CITY OF EVERETT PUBLIC WORKS DEPARTMENT. EROSION AND SEDIMENT CONTROL AS DIRECTED BY CITY INSPECTOR.
<br /> 6. THE CONTRACTOR SHALL PROTECT ALL AREAS OUTSIDE THE WORK ZONE AND OUTSIDE THE RIGHT-OF-WAY FROM 4. DO NOT ALLOW FLOW OF STORMWATER INTO THE EXCAVAIION. USE TEMPORARY STRAW WATTLES, 4. THE ESC FACILIIIES SHALL BE INSPECTED DAILY BY THE APPLICANT/CONTRACTOR AND MAINTAINED AS
<br /> DISTURBANCE. ALL DISTURBED AREAS SHALL BE FULLY RESTORED TO PROPOSED OR PRE-EXISTING CONDITIONS. BYPASS PIPING AND PUMPS, OR OTHER MEASURES TO INTERCEPT FLOWS UPSTREAM OF THE WORK. NECESSARY OR AS DIRECTED BY THE CITY TO ENSURE THEIR CONTINUED FUNCTIONING.
<br /> 7. ALL DAMAGE TO INFRASTRUCTURE CAUSED BY THE CONSTRUCTION SHALL BE REPAIRED IN KIND OR AS REQUIRED BY 5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND �
<br /> THE CITY OF EVERETT INSPECTOR. MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO
<br /> INSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT.
<br /> 8. THE APPROVED PLANS SHOW THE APPROXIMATE AREA OF PAVEMENT RESTORATION BASED ON THE DEPTH OF 1601 sth Avenue,suite 1600
<br /> 6. CONTRACTOR SHALL PROVIDE CHAIN LINK CONSTRUCTION FENCING OR OTHER SEPARATION BARRIERS, seatt�e, WA 98101
<br /> UTILITY CUTS AND/OR THE AREA OF CURB AND/OR PAVEMENT TO BE REMOVED AND REPLACED. THE ACTUAL LIMITS AS REQUIRED, FOR PUBLIC SAFETY AND/OR AS DIRECTED BY THE CITY INSPECTOR. zos.6zz.5s22
<br /> OF THE PAVEMENT RESTORATION SHALL BE DETERMINED IN THE FIELD WITH THE CITY OF EVERETT INSPECTOR PRIOR www.kpff.com
<br /> TO THE PAVEMENT RESTORATION.
<br /> 7. CATCH BASINS SHALL BE INSPECTED DAILY BY THE CONTRACTOR. WATER LEAVING THE SITE DURING
<br /> CONSTRUCTION, INCLUDING WATER CARRIED BY THE TRUCK TIRES, SHALL BE CLEAN. THE CONTRACTOR
<br /> 9. HORIZONTAL DATUM: NAD 83/91. VERTICAL DATUM: NAVD 88. SHALL CLEAN CATCH BASINS AND IMPLEMENT EXTRA SEDIMENTATION CONTROL METHODS IF NECESSARY
<br /> 10. SURVEYING AND STAKING OF ALL IMPROVEMENTS IN THE PUBLIC RIGHT OF WAY SHALL BE COMPLETED PRIOR TO
<br /> AND AS DIRECTED BY THE CITY.
<br /> CONSTRUCTION AND COORDINATED IMTH CITY INSPECTOR TO VERIFY POSITIVE DRAINAGE IS OBTAINED. 8. EXCAVATION SITE DEWATERING THAT INCLUDES DISCHARGE TO THE CITY STREET, CATCH BASIN, OR
<br /> 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REFERENCING AND REPLACING ALL MONUMENTS THAT MAY BE
<br /> SEWER SHALL BE IMPLEMENTED ONLY A.FTER APPROVAL BY THE CITY INSPECTOR.
<br /> DISTURBED, DESTROYED OR REMOVED BY THE PROJECT AND SHALL FILE AN APPLICATION FOR PERMIT TO REMOVE 9. CONSTRUCTION EROSION CONTROL MEASURES SHALL BE IN PLACE AND APPROVED BY THE CITY PRIOR
<br /> OR DESTROY A SURVEY MONUMENT WITH THE WASHINGTON STATE DEPARTMENT OF NATURAL RESOURCES, PURSUANT TO ANY EARTH DISTURBANCE.
<br /> TO RCW 58.24.040(8).
<br /> 10. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO MORE
<br /> 12. THE CONTRACTOR SHALL COORDINATE WITH CITY INSPECTOR FOR ANY SUBMITTAL OF DOCUMENTS IN CONFORMANCE THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1
<br /> WITH THE STANDARD SPECIFICATIONS PRIOR TO CONSTRUCTION. A MATERIAL SOURCE FORM FOR ALL MATERIALS TO THROUGH SEPTEMBER 30.
<br /> BE PLACED IN THE RIGHT OF WAY AND MIX DESIGNS FOR ALL ASPHALT, CONCRETE AND AGGREGATES TO BE PLACED
<br /> IN THE RIGHT OF WAY MAY REQUIRE SUBMITTAL FOR REVIEW AND APPROVAL PRIOR TO BEGINNING CONSTRUCTION. 11. NO SEDIMENT SHALL BE 7RACKED INTO THE STREET OR ONTO PAVED SURFACES. SEDIMENT SHALL BE
<br /> REMOVED FROM TRUCKS AND EQUIPMENT PRIOR TO LEAVING THE SITE. IN THE EVENT OF FAILURE OF
<br /> 13. THE CONTRACTOR SHALL NOTIFY THE EVERETT FIRE DEPARTMENT DISPATCHER AT LEAST TWENTY-FOUR (24) HOURS THE EROSION CONTROL SYSTEM RESULTING IN SEDIMENT BEING TRACKED ONTO PAVED SURFACES, THE
<br /> IN ADVANCE OF ALL WATER SERVICE INTERRUPTIONS, HYDRANT SHUTOFFS, AND STREET CLOSURES OR OTHER CONTRACTOR SHALL IMMEDIATELY IMPLEMENT MEASURES TO CORRECT THE SITUATION, AND STREET
<br /> ACCESS BLOCKAGE. THE CONTRACTOR SHALL ALSO NOTIFY THE DISPATCHER OF ALL NEW, RELOCATED, OR SWEEPING SHALL BE EMPLOYED ON AN EMERGENCY BASIS. IF STREET SWEEPING VEHICLES ARE
<br /> ELIMINATED HYDRANTS RESULTING FROM THIS WORK. UTILIZED, THEY SHALL BE OF THE TYPE THAT REMOVES THE SEDIMENT FROM THE PAVEMENT.
<br /> 14. THE CONTRACTOR SHALL LOCATE AND PROTECT ALL CASTINGS AND UTILITIES DURING CONSTRUCTION.
<br /> 15. THE CONTRACTOR SHALL CONTACT THE UNDERGROUND UTILITIES LOCATOR SERVICE (1-800-424-5555) AT LEAST � � y��
<br /> TWO BUSINESS DAYS PRIOR TO CONSTRUCTION.
<br /> ����'�F x�s�j'��'���
<br /> 16. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN �' �
<br /> AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILiTIES NOT SHOWN WHICH MAY BE AFFECTED BY THE -
<br /> IMPLEMENTATION OF THESE IMPROVEMENTS. " �y� �
<br /> 17. THE CONTRACTOR SHALL ADJUST ALL EXISTING MANHOLE RIMS, DRAINAGE STRUCTURE LIDS, VALVE BOXES, AND �'�a� �B�Is'ri��l�`�
<br /> UTILITY ACCESS STRUCTURES TO FINISH GRADE WITHIN AREAS AFFECTED BY THE PROPOSED IMPROVEMENTS. � �s'�jOHAL ��'
<br /> 18. THE CONTRACTOR SHALL PROVIDE FOR ALL TESTING AS REQUIRED BY THE STREET INSPECTOR.
<br /> 19. BACKFILL MATERIAL USED IN PUBLIC RIGHT-OF-WAY SHALL MEET CITY OF EVERETT DESIGN AND CONSTRUCTION �
<br /> STANDARDS AND SPECIFICATIONS.
<br /> 20. INSPECTION AND ACCEPTANCE OF ALL WORK IN THE PUBLIC RIGHT-OF-WAY SHALL BE DONE BY REPRESENTATIVES
<br /> Project Number: XXXXXX
<br /> OF THE CITY OF EVERETT. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE AND SCHEDULE Issued For:
<br /> APPROPRIATE INSPECTIONS ALLOWING FOR PROPER ADVANCE NOTICE. THE STREET INSPECTOR MAY REQUIRE Public Works Permit
<br /> REMOVAL AND RECONSTRUCTION OF ANY ITEMS PLACED IN THE RIGHT OF WAY TNAT DO NOT MEET CITY STANDARDS January 26, 2018
<br /> OR THAT WERE CONSTRUCTED WITHOUT APPROPRIATE INSPECTIONS.
<br /> 21. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY EROSION CONTROL AND SEDIMENTATION COLLECTION
<br /> Date:
<br /> FACILITIES TO ENSURE THAT SEDIMENT-LADEN WATER DOES NOT ENTER THE PUBLIC STORM OR COMBINED SEWER o1-26-2o1s Public works Pe,rmit Sub.
<br /> �...�.a.r..��-.�--�
<br /> SYSTEM. AS CONSTRUCTION PROGRESSES AND UNEXPECTED (SEASONAL) CONDITIONS DICTATE, ADDITIONAL CONTROL
<br /> � FACILIIIES MAY BE REQUIRED. DURING THE COURSE OF CONSTRUCTION IT SHALL BE THE OBLIGATION AND A �, � �����
<br /> � RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE �� ,�,��
<br /> �N � ,�� �.
<br /> W �' r i�,ftecord Drawin�t;�s been p�P�rod�r pTh�ughed
<br /> $ CONTRACTOR'S ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES THAT MAY BE NEEDED TO PROTECT ADJACENT � .r1 ,� . ,`-.�;,� Sj:���� pr`���� y ���d on
<br /> g PROPERTIES. F.;t,��c +� ��
<br /> ; �
<br /> � ,,,,��s- dra;ving are
<br /> M ,; :���n ar�d thi� should
<br /> � 22. �s-t�u �; ���; �nr ,. , t, ,resumption
<br /> �� � , ,i�, ��r�n�,i��� � � �
<br /> - ,,e,.t .�i.i �
<br /> THE CONTRACTOR SHALL KEEP ALL PAVED SURFACES IN THE RIGHT OF WAY CLEAN BY SWEEPING. y �,t� � �, ' `', ' �' :1�`"`aJ�l. �...��
<br /> � 't t r�,���, ,.� ��� J',�,.
<br /> � �'�� __�_____.,...�..�'_--�' Sheet Title:
<br /> j , __��---_
<br /> E 23. CONTRACTOR'S TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH THE CITY OF EVERETT TRAFFIC CONTROL MANUAL ' �;�;�y- r7
<br /> ; � ���i�� perrnit lns���o�
<br /> � � � � -----�-- N 0 TE S
<br /> FOR IN-STREET WORK. AN APPROVED TRAFFIC CONTROL PLAN WILL BE REQUIRED FOR ALL ARTERIAL STREETS
<br /> PRIOR TO BEGINNING CONSTRUCTION.
<br /> ����___--- �_�___________ ��s
<br /> ,
<br /> _ ,--fi-^j����t; � r�t;, -----------~-- .
<br /> 's�C!C'�•_ ----__ �"`
<br /> __��---~'-_'�__._.-..�.__-----`
<br /> a 24. ALL WORK PERFORMED BY ANY CITY OF EVERETT DEPARTMENTS AND OTHER UTILITY PURVEYORS TO REMOVE OR
<br /> � RELOCATE EXISTING UTILITIES SHALL BE DONE AT THE CONTRACTOR'S EXPENSE.
<br /> � Sheet Number:
<br /> �4 25. CARE SHALL BE EXERCISED WHEN EXCAVATING NEAR EXISTING CHARGED WATER MAINS.
<br /> �
<br /> N • Call 811 C1 � 01
<br /> � • �two business days
<br /> before you dig
<br />
|