Laserfiche WebLink
8/15/2019 <br />11:41:13AM City of Everett <br />INSPECTION ACTIVITY REPORT <br />Page 1 <br />Permit No. P1804-006 Site Address 7605 BEVERLY BLVD <br />Applied 4/9/2018 Applicant MCCORMICK MICHAEL E Lot <br />Approved 5/22/2018 Owner MCCORMICK MICHAEL E Block <br />Issued 6/28/2018 Contractor INTERSTATE CONSTRUCTION LLC Tract <br />Parent Permit No. B1804-022 Description RELOCATE FIXTURES FOR COMMERCIAL KITCHEN REMOI <br />Notes SUBJECT TO FIELD INSPECTION <br />Scheduled <br />Completed <br />1WDe <br />Inspector <br />Result Remarks <br />Inspector's Comments <br />8/1/2018 <br />8/1/2018 <br />PLUMB <br />SDP <br />OTHER <br />1. Obtain health department approval. <br />01-CONSULTATIO <br />2. All plumbing shall meet current codes <br />and be on the test. <br />3. Proper backflow protection on all <br />necessary equipment such as ice machine, <br />pop machine, water supplied ovens, etc. <br />4.Obtain approval from waste <br />pre-treatment for grease trap. <br />8/1/2018 <br />8/1/2018 <br />PLUMB <br />DXW <br />CORRECTION Work not complete <br />Recommend hire journeyman plumbing. All <br />03-ROUGH IN <br />plumbing to be up to 2015 UPC. <br />9/14/2018 <br />9/14/2018 <br />PLUMB <br />SDP <br />OTHER <br />1. Grease trap shall have a proper <br />01-CONSULTATIO <br />base/stand/support. <br />2. Grease trap shall be a minimum 2-35 gal <br />or 1-50 gal - flow controls as discusses. <br />3. Bring water heater up to code: elect, <br />temp/pressure drain, etc. Heater. <br />4. Waste and vents shall be separated from <br />other occupancies and brought up to code. <br />5.3-comp sink, janitor sink and meat prep <br />sink shall drain to grease. <br />6. Ice machine, pop machines must be <br />separately protected with an RPBA. <br />7. ADA toilet room shall meet current code <br />for location, fixtures, grab bars, etc. <br />8. 1 1/4" gas pipe recommended. If not, <br />show how V is OK. <br />9. Plumbing vents shall terminate above the <br />roof and not be exposed on outside wall. <br />10/1/2018 <br />10/1/2018 <br />PLUMB <br />SDP <br />APPROVAL As noted <br />Only 1 flow control will be required at the <br />03-ROUGH IN <br />grease interceptor. the vertical drop is not <br />significant and to add flow controls at the <br />floor sink would hinder the cleansing <br />process. <br />4/2/2019 <br />4/2/2019 <br />PERMIT <br />TKJ <br />APPROVAL <br />EXTENSION <br />7/25/2019 <br />7/25/2019 <br />ADMIN USE <br />KLC <br />APPROVAL <br />ONLY" <br />7/25/2019 <br />7/25/2019 <br />PLUMB 06-FINAL <br />DXW <br />APPRVD-PER-N <br />INSP12 <br />