Laserfiche WebLink
8/15/2019 <br />12:01:16PM <br />Permit No. M1806-047 <br />Applied 6/14/2018 <br />Approved 7/20/2018 <br />Issued 8/1/2018 <br />Parent Permit No. B1804-022 <br />Scheduled Completed <br />City of Everett Page 1 <br />INSPECTION ACTIVITY REPORT <br />Site Address 7605 BEVERLY BLVD <br />Applicant Jennifer hemphill Lot <br />Owner MCCORMICK MICHAEL E Block <br />Contractor Interstate Construction LLC Tract <br />Description install new 10' type one hood system, gas piping, gas fumac <br />Notes SEPARATE PERMIT REQUIRED FOR HOOD SUPPRESSION. <br />(11/8/2018 8:57 AM CRB) <br />CUST WRITES THEY ARE INSTALLING 4 GAS OUTLETS UNDER HOOD AND HOOKING UP <br />GASFURNACE. <br />1WDe Inspector Result Remarks InSDector's Comments <br />10/12/2018 <br />10/12/2018 <br />MECH 04-ROUGH <br />SDP PARTIAL APPR <br />Type 1 hood - OK to cover wall behind <br />IN <br />hood after framing - inspection is approved. <br />10/12/2018 <br />10/12/2018 <br />MECH 05-OTHER <br />DXW CORRECTION <br />1. Furnace ductwork in crawl area rough in <br />OK. <br />2. Furnace exhaust to be to manufacturers <br />spec at termination outside. <br />3. Complete insulation on duct in crawl R-8 <br />minimum. <br />10/12/2018 <br />10/12/2018 <br />MECH 04-ROUGH <br />DXW CORRECTION No access <br />IN <br />4/2/2019 <br />4/2/2019 <br />PERMIT <br />TKJ APPROVAL <br />EXTENSION <br />5/13/2019 <br />ADMIN OTHER <br />TKJ status <br />review/contractor <br />change <br />6/25/2019 <br />6/25/2019 <br />MECH 04-ROUGH <br />DXW PARTIAL APPR <br />PM inspection requested <br />IN <br />Phone:206-617-4951 <br />(6/25/2019 2:31 PM DXW) <br />light test ok. <br />7/11/2019 <br />7/11/2019 <br />MECH 04-ROUGH <br />SDP APPROVAL Grease duct and <br />206-617-4951 <br />IN <br />mech. <br />(7/11/2019 3:37 PM SDP) <br />1) Grease duct wrap - ok <br />2) Furnace venting - ok <br />7/25/2019 <br />7/25/2019 <br />MECH06-FINAL <br />DXW PARTIAL APPR <br />206-617-4941 <br />PM Inspection requested <br />(7/25/2019 2:04 PM DXW) <br />type 1 hood final is ok. <br />FOR FINAL mech - insulate the return air <br />ducts in crawl with 1 layer of insulation R - <br />4. <br />7/25/2019 <br />7/25/2019 <br />GAS O1-ROUGH IN <br />DXW APPROVAL <br />(7/25/2019 2:00 PM DXW) <br />Received affidavit for pressure test. <br />R.I. gas pipe ok <br />At final pipe the 1 1/2 in. gas pipe all the <br />way to meter and have the leashes and <br />supply flexes installed. <br />7/31/2019 <br />7/31/2019 <br />MECH 06-FINAL <br />DXW APPRVD-PERK <br />425-922-6399 <br />(7/31/2019 10:56 AM DXW) <br />as noted complete insulation on hard duct <br />in crawl. <br />7/31/2019 <br />7/31/2019 <br />ADMIN USE <br />KLC APPROVAL <br />ONLY" <br />7/31/2019 <br />7/31/2019 <br />ADMIN USE <br />KLC APPROVAL <br />ONLY" <br />7/31/2019 <br />7/31/2019 <br />GAS 03-FINAL <br />DXW APPRVD-PERIL <br />INSP12 Cawsysnms <br />