My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3315 BROADWAY HOPEWORKS STATION 2 2020-12-02
>
Address Records
>
BROADWAY
>
3315
>
HOPEWORKS STATION 2
>
3315 BROADWAY HOPEWORKS STATION 2 2020-12-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2020 9:35:38 AM
Creation date
9/4/2019 12:11:18 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3315
Tenant Name
HOPEWORKS STATION 2
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U-BUILDER PRODUCT ASSUMPTIONS <br /> RM5- Ballasted Flat Roof Systems <br /> Limitations of Responsibility:It is the user's responsibility to ensure that inputs are correct for your specific project. <br /> Unirac is not the solar,electrical,or building engineer of record and is not responsible for the solar,electrical,or <br /> building design for this project. <br /> Duildina Assumptions <br /> 1.Building and System Risk Category II <br /> 2.Building Height<_60 ft. <br /> 3.Roof Slope>_2.4°(1/2:12)and<5.6°(1-3/16:12) <br /> 4.Friction Tested Roofing Types:EDPM,PVC,TPO,and Mineral Cap <br /> 5.Required Setback from Module Edge to Building Edge for Wind Tunnel:3 ft(See Item 14) <br /> 6.Surrounding Building Grade:Level <br /> 7.Wind Design:Basic Wind Speed Range is 110-170 mph(ASCE 7-10).Wind Exposure:B or C(ASCE 7-10).Occupancy/Risk Category <br /> II buildings and systems with a 25 year design life.Insertion of the project at-grade elevation can result in a reduction of wind pressure.If <br /> your project is in a special case study region or in an area where wind studies have been performed,please verify with your jurisdiction to <br /> ensure that elevation effects have not already been factored into the wind speed.If elevation effects have been included in your wind <br /> speed,please select 0 ft. <br /> 8.Ground Snow Load(ASCE 7-10):0-60 psf.Results are based on uniform snow loading and do not consider unbalanced,drifting,and <br /> sliding conditions.Roof snow load reduction calculated per Section 7.3 of ASCE 7 with the following assumptions:Exposure factor=0.9, <br /> Thermal factor=1.2. <br /> 9.RM5 Bay Weight:-7.2 lbs <br /> 10.Module Gaps(EMI)=0.25 in <br /> 11.Seismic:Installations must be in seismic site class A,B,C,or D as defined in ASCE 7-10. <br /> 12.Ballast Calculations are based on ASCE 7-10 load combinations and product specific wind tunnel testing. <br /> 13.Ballast Blocks:The installer is responsible for procuring the ballast blocks(Concrete Masonry Units-CMU)and verifying the required <br /> minimum weight needed for this design.CMU to comply with ASTM standard specification for concrete roof pavers designation C1491 or <br /> C90 with an integral water repellant suitable for the climate it is placed.It is recommended that the blocks are inspected periodically for <br /> any signs of degradation.If degradation of the block is observed,the block should immediately be replaced.The CMU ballast block <br /> should have nominal dimensions of 4"x8"x16".The actual block dimensions are 3/8"less than nominal dimensions.Ballast blocks should <br /> have weight as specified for the project in the"Inspection"section of this report. <br /> 14.Wind deflectors on the east and west edges of the array should overhang the east and west modules by six inches for Type I modules <br /> on the north rows only.Wind deflectors on the east and west edges of the array should overhang the east and west modules by six inches <br /> for Type II modules on the north row and east and west edge columns. <br /> 15.Limitations of Responsibility:It is the users responsibility to ensure that inputs are correct for your specific project.Unirac is not the <br /> solar,electrical,or building engineer of record and is not responsible for the solar,electrical,or building design for this project. <br /> 16.The system is certified to UL2703 when properly installed.See the installation guide for more detail. <br /> $allast Blocks <br /> The installer is responsible for procuring the ballast blocks (Concrete Masonry Units-CMU)and verifying the <br /> required minimum weight needed for this design. CMU should comply with ASM standard specification for <br /> concrete roof pavers designation (C1491 or C90 with an integral water repellant suitable for the climate it is <br /> placed.It is recommended that the blocks are inspected periodically for any signs of degradation.If degradation <br /> of the block is observed,the block should immediately be replaced.The CMU ballast block should have nominal <br /> dimensions of 4"x8"x16".The actual block dimensions are 3/8"less than the nominal dimensions.Ballast blocks <br /> should have a weight as specified for the project in the"Inspection"section of this report. <br /> Desian Parameters <br /> 1.Importance Factor:Array(Ip)=1.0,Building(le)=1.0 <br /> 2.Site Class=D <br /> 3.S=design seismic displacement of the array relative to the roof <br /> 4.Minimum Separation:Array to Array=0.5°S,Array to Roof Edge or Obstruction with Qualified Parapet=1.0*S,Array to Roof Edge <br /> with Unqualified Parapet=1.5*S <br /> 5.Ss=mapped MCER,5 percent damped,spectral response acceleration parameter at short periods per ASCE 7-10 <br /> 6.SDS=design,5 percent damped spectral acceleration parameter at short periods per ASCE 7-10 <br /> 7.Coefficient of friction used for calculations per Unirac,Inc.Roof Mount Ballast Support Coefficient of Friction Testing report dated <br /> 7/13/2016. <br /> Properties <br /> 1.Bay Weight:-7.2 lbs <br />
The URL can be used to link to this page
Your browser does not support the video tag.