My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3315 BROADWAY HOPEWORKS STATION 2 2020-12-02
>
Address Records
>
BROADWAY
>
3315
>
HOPEWORKS STATION 2
>
3315 BROADWAY HOPEWORKS STATION 2 2020-12-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2020 9:35:38 AM
Creation date
9/4/2019 12:11:18 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3315
Tenant Name
HOPEWORKS STATION 2
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Electrical Schedule/BOM ' A' <br /> Ref. Category Equipment QTY Notes <br /> 1 Modules Itek 365 SE 531 ? __A <br /> 2 Optimizers P730 272 0 3211 Martin Luther King Jr Way S. <br /> 3 Jbox j-box 10 (2) 6"x6"x72" HOFA6672RT Seattle,WA 98144(206)707-9937 <br /> 3 DC Disconnect Pass-Through Disconnect units F4SK32-1-4XP 5 F4SK32-1-4XP <br /> 4,5,6,7 Inverters Solaredge 43.2K 4 Inverter <br /> 8 CombinerPanel 600A Combiner Panel 1 0 <br /> 9 MeterBase MeterBase-200A 13Jaw, Comm. Meter Socket, NEMA 3R 1 200A MeterBase <br /> 9 MeterBase CT Enclosure for Production Meter, NEMA 3R 1 0 <br /> 10 Disconnect 600A 240V 3 Pole I General Duty, No Fuse 1 THIS DRAWING CONSTITUTES THE <br /> Monitoring Solaredge PV Monitoring 1 SolarEdge PV Monitoring kit `ANDFITSRECEPTOR°OSSES ION DOES NOT <br /> RMATION OF A&R R <br /> CONFER ANY RIGHT IN OR LICENSE TO USE IT <br /> OR THE INFORMATTION DISCLOSED HERE IN <br /> NOR ANY RIGHT TO REPRODUCE THIS <br /> DRAWING OR ANY PART HERE IN WITHOUT <br /> THE WRITTEN CONSENT OF A&R SOLAR. <br /> IronRidge Racking BOM-Awning Only IronRidge Racking BOM-Penthouse Only <br /> Description QTY Description QTY N <br /> XR100 Mi11,17' 32 XR100 Mill,17' 4 <br /> XR100 Mill,14' 96 XR100 Mill,14' 0 _ <br /> Kit,XR100 Bonded Splice 64 Kit, XR100 Bonded Splice 0 .2 <br /> Universal Module Clamp, Mill 608 Universal Module Clamp, Mill 16 <br /> RI <br /> Stopper Sleeve,40MM, Mill 128 _ Camo Clamp 8 <br /> Grounding Lug, Low Profile 32 Grounding Lug, Low Profile 2 (/) '"i <br /> Square-Bolt Bonding Attachment Hardware 416 Square-Bolt Bonding Attachment Hardware 26 0 2 o fo NI <br /> 1/4 x 3/4 Microinverter Bonding Hardware,T-Bolt 272 1/4 x 3/4 Microinverter Bonding Hardware,T-Bolt 10 L E to O1 <br /> End Caps, 10 sets(package)XR100 7 End Caps, 10 sets(package)XR100 1 O -- ifrirn m Q <br /> L_FEET, Mill 351 S-5! Clamp, Mill 26 > Q . 2 <br /> 1:1) 00 .-. a <br /> 0 0 0 0 ID. m n3o M a <br /> System Weights System Weights 0 ON N M <br /> Racking Weight(lbs) 1716 Racking Weight(lbs) 76 = '—I .�M W <br /> Total Weight(lbs) 15044 Total Weight(lbs) 566 ■■ <br /> Weight/Attachment(Ibs) 36.2 Weight/Attachment(lbs) 21.8 V <br /> DeadLoad(PSF) 2.58 Deadload(PSF) 2.63 <br /> O <br /> L <br /> O. <br /> REVISIONS <br /> Rev. #: Date: <br /> 4 Feb 11,2019 <br /> Designed by: Daniel H. <br /> PM: Andrew Houle <br /> (262) 331-0485 <br /> Current Date:Feb 11, 2019 <br /> PV-G4 <br /> /) /3 Equipment BOM <br />
The URL can be used to link to this page
Your browser does not support the video tag.