My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
840 N BROADWAY JR RELOCATION 2019-09-04
>
Address Records
>
N BROADWAY
>
840
>
JR RELOCATION
>
840 N BROADWAY JR RELOCATION 2019-09-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2019 1:20:03 PM
Creation date
9/4/2019 1:20:01 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
840
Tenant Name
JR RELOCATION
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lighting Summary LGT-SUM <br /> 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2,R3,R4 over 3 stories and all R1 Revised July 2016 <br /> Project Info Project Title: WashingtonState DSHS-JR Relocation Date 10/3/2018 <br /> Compliance Applicant Information. Provide contact information for individual Who can For Building Department Use <br /> fors do not respond to inquiries about compliance form information provided. <br /> require a Company Name: Magellan Architects <br /> password to <br /> use. Company Address: 8383 158th Ave NE,Suite 280,Redmond WA 98052 <br /> Instructional and <br /> calculating cells Applicant Name: Tina Koch <br /> are wife- <br /> protected. Applicant Phone: 425-885-4300 <br /> Applicant Email: tina@magellanarchitects.com <br /> Project Description Cl New Building Cl Addition 0 Alteration Cl Plans Included <br /> Include PROJ-SUM form(included in envelope forms Workbook) With lighting complliance forms. <br /> Building Additions Compliance Method Interior lighting Exterior lighting <br /> Lighting systems in addition area comply with all applicable 0 <br /> 13 <br /> provisions as a stand alone new construction project <br /> Refer to Section C502.2.6 for additional - <br /> requirements. Lighting systems in addition are combined with existing <br /> 13 13 <br /> building lighting systems to demonstrate compliance <br /> Addition is combined with existing: <br /> For interior lighting projects,include new+existing interior lighting fixture Wattage in Proposed <br /> Lighting Wattage table in LTG-INT-BLD orLTG-INT-SPACE form. <br /> For exterior lighting projects,include new+existing exterior lighting fixture Wattage in Proposed <br /> Tradable and Proposed Non-Tradable Lighting Wattage tables in LTG-EXT form. <br /> Interior and Exterior Lighting Power Interior lighting Parking garage Exterior lighting <br /> Lighting Alterations 50%or more of existing are replaced 0 Cl 0 <br /> Select all Lighting Polder and Lighting <br /> Control elements that apply to the scope Less than 50%of existing are replaced 0 Cl 0 <br /> of the retrofit project.If project includes a <br /> combination of spaces Where less than Lamp and/or ballast replacement only <br /> 13 13 13 <br /> 50%of the existing fixtures are replaced —existing total wattage not increased <br /> in some spaces,and 50%or more of the 50%or more replaced-Total lighting polder of new+existing-to-remain fixtures shall comply With <br /> fixtures are replaced in others, then total LPA per Sections C405.4.2 and C405.5.2. Include new+existing-to-remain fixtures in <br /> provide separate lighting polder Proposed Lighting Wattage table in LTG-INT-BLD,LTG-INT-SPACE or LTG-EXT form. <br /> compliance forms for the two retrofit <br /> conditions.Spaces undergoing the same Less than 50%replaced-Total lighting polder of new+existing-to-remain fixtures shall not exceed <br /> type of retrofit may be combined into one the total lighting polder prior to alteration. Include new+existing-to-remain fixtures in the Proposed <br /> lighting polder compliance form. Lighting Wattage table in LTG-INT-BLD,LTG-INT-SPACE or LTG-EXT form. <br /> 50%threshold applies to numberof luminaires for interior spaces and parking garages,and total <br /> Refer to Section C503.6 for additional installed Wattage for exterior luminaires. <br /> requirements. <br /> Lighting Controls Interior lighting Parking garage Exterior lighting <br /> All alteration lighting controls shall be New wiring installed to serve added <br /> commissioned per C408fixtures and/or fixtures relocated to 0 0 0 <br /> � <br /> � �� new circuit(s) <br /> iR19 U <br /> New or moved lighting panel 0 0 0 <br /> :9 <br /> . Interior space is reconfigured - <br /> � �' -tri luminaires unchanged or relocated <br /> CITY_ New wiring or circuit -For interior lighting,provide required manual controls per C405.2.3, <br /> Permit SeP vIC 5 occupancy sensor controls per C405.2.1,daylight responsive controls per C405.2.4 and application <br /> No changes are being made to specific lighting controls per C405.2.5.For exterior lighting,provide required controls per C405.2.7. <br /> the interior or exterior lighting New or moved panel-Provide all applicable lighting controls as noted for New Wiring and automatic <br /> systems and existing space time switch controls per C405.2.2. <br /> uses and configuration are not Reconfigured interior space-Provide all required lighting controls that apply to a new interior <br /> changed. space.Application specific lighting control provisions per C405.2.5 do not apply to reconfigured <br /> Change of Space Use 0 Existing interior lighting systems in areas under-going a change in space use are upgraded to <br /> comply with LPAs for the new space types per Tables C405.4.2(1)or C405.4.2(2). <br /> identify interior spaces requiring LPD upgrade to the current Code in Proposed Lighting Wattage <br /> table in LTG-INT-BLD or LTG-INT-SPACE form. <br />
The URL can be used to link to this page
Your browser does not support the video tag.