Laserfiche WebLink
INSPECTION REPORT <br /> -,-- <br /> /N/41.'''.1 Date /42/ Permit: g/e69-720/ <br /> ,::: <br /> Contractor: <br /> la�3ai <br /> Owner: <br /> Site Address: (5J — La ld r. <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Strr.tural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Serviceaming ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ['Gas Pipe Fi alll ❑HWT Final <br /> `v <br /> OTHER OR CONSULTATION: BP( S 'I f0'29 C/7 <br /> C/7 <br /> Ill ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> rgAilini A/6 - eb' ' r v(ru4a-nom <br /> \ Inspector: 2 / r Date: /0 "" 02?"-.(j) <br /> WEIR(10/06) DATABAR,INiC. <br />