My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
909 SE EVERETT MALL WAY IIZUNA CIDER 2019-09-05
>
Address Records
>
SE EVERETT MALL WAY
>
909
>
IIZUNA CIDER
>
909 SE EVERETT MALL WAY IIZUNA CIDER 2019-09-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 9:12:48 AM
Creation date
9/5/2019 9:12:43 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
909
Tenant Name
IIZUNA CIDER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr Paul Douglas <br /> 2812 Architecture <br /> Plan Check Number: B1901-015, First Building Review <br /> February 11, 2019 <br /> Architectural <br /> General: <br /> 1. Work on existing buildings shall comply with the IEBC. The IEBC provides three alternative <br /> methods for performing work: the Prescriptive Compliance Method (Section 301.1.1), the <br /> Work Area Method (301.1.2), and the Performance Compliance Method (301.1.3). The <br /> method selected for the project should be specified in the Project Criteria on Sheet Al. A <br /> statement should be provided clarifying the types of work that are included in the project <br /> (e.g., repairs, additions, change of occupancy, etc.) and referencing the appropriate IEBC <br /> sections. The comments provided herein presume the project will comply with the Work <br /> Area Method of Chapter 5. Based on a review of the construction drawings, the proposed <br /> project appears to include the following work: Level 2 Alternations (Chapter 8), and Change <br /> of Occupancy (Chapter 10). Additional and alternative types of work required for the <br /> project shall be identified by the designer-of-record. Additional comments may be pending. <br /> See IBC Sections 301.1, 504, and 506. <br /> 2. The Project Criteria on Sheet Al specifies the Occupancy Category as Type F-1. Based on <br /> the proposed use, the premises appears to potentially contain hazardous materials. <br /> Documentation shall be submitted to and review by the City of Everett Fire Department to <br /> verify that hazardous materials on the premises do not exceed the maximum allowable <br /> quantities per IFC Table 5003.1.1. If quantities are found to exceed the specified limits, the <br /> Occupancy Category shall be revised and additional building review comments may be <br /> pending. Note that this comment is intended to address impacts for the building review <br /> only and do not supersede comments based on a review by the Fire Department. <br /> Fire Protection: <br /> 3. The space is undergoing a change of occupancy from B to F-1. The space shall comply with <br /> the requirements of IBC Chapter 9 per IEBC Section 1004.1. The fire area containing the F- <br /> 1 occupancy, presumed to be the entire building, exceeds 12,000 SF. The entire fire area <br /> shall be provided with an automatic sprinkler system per IBC Section 903.2.4 Item 1. <br /> Alternatively, the proposed space containing the F-1 may be compartmentalized and <br /> provided with fire protection per one of the exceptions of Everett Municipal Code Section <br /> 16.76.060. The design shall be revised. <br /> 4. The Occupant Plan on Sheet A2 states a total occupant load of 21. The following comments <br /> shall be addressed: <br /> a. The occupant load for the fixed seating area (i.e.,Tasting Room 104) shall be performed <br /> per the requirements of IBC Section 1004.4. Based on 13 individual seats and a bench <br /> length of 13.5 feet, the occupant load shall be at least 20. <br /> b. Continuing with the previous comment, the occupant load for the Tap Room 105 shall <br /> be at least one additional occupant. <br /> c. The Cidery Room 101 has an approximate gross area of 1,560 SF. Based on an <br /> occupant load factor of 100 SF/occupant per IBC Table 1004.1.2, Room 101 shall have a <br /> minimum occupant load of 16. <br /> d. The total occupant load shall be revised to at least 37. <br /> 0(�} 3200 Cedar Street 0 425.257.8800 0 everettpw@everettwa.gov <br /> �% Everett,WA 98201 425.257.8882 fax everettwa.gov � <br />
The URL can be used to link to this page
Your browser does not support the video tag.