My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12 SW EVERETT MALL WAY MALLORY PAINT STORE 2019-09-05
>
Address Records
>
SW EVERETT MALL WAY
>
12
>
MALLORY PAINT STORE
>
12 SW EVERETT MALL WAY MALLORY PAINT STORE 2019-09-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 10:27:34 AM
Creation date
9/5/2019 10:27:29 AM
Metadata
Fields
Template:
Address Document
Street Name
SW EVERETT MALL WAY
Street Number
12
Tenant Name
MALLORY PAINT STORE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • • <br /> \ STALLATION INSTRUCTIONS <br /> 2. FLOOR ANCHOR WIDE SPAN SHELVING <br /> Floor anchors are required when: <br /> a. The ratio of the height of the unit to the overall depth of the unit exceeds 6:1. <br /> b. Alignment of rows need to be maintained. <br /> c. When hand stackers are used. <br /> d. Post load needs to be spread over a larger area. <br /> e. When bottom of the bottom beam is more than 6" from the floor. <br /> Bolt floor anchor onto the bottom of the post using hardware provided as shown in Detail I. Anchor to <br /> floor using a wedge—style anchor suitable for concrete. Anchor material, finish, diameter and embedment <br /> shall be determined by the customer for the specific site requirement. <br /> 1/ <br /> - The minimum anchor diameter shall be 1/4" and the minimum embedment shall b- 1 8". Z. <br /> NUT FOR CONCRETE ANCHOR <br /> HEX NUT NIS ‘N-9(10/---UPRITE <br /> 3 V5 rEvt/ PE,- Aid ilif. ,- 0 Il Vi <br /> FLOOR ANCHOR (ITEM 9) 1 ® 5/16"-18 X 2 1/2" <br /> klCARRIAGE BOLT <br /> I U (ITEM 12) <br /> CONCRETE ANCHOR ® 11-. -r <br /> DETAIL I `I <br /> 3. FLOOR PROTECTOR/SHIMS �, <br /> Floor protector/shims are used to protect floors when required and/or to aid in leveling the <br /> system when required (by stacking the shims). <br /> NOTE: FLOOR PROTECTOR/SHIMS CANNOT BE USED IN CONJUNCTION WITH FLOOR ANCHOR PADS. <br /> a. Install after assembly of basic unit by lifting one uprite at a time and then positioning shim <br /> (or shims) as shown in "Detail J". Do not exceed 5 shims under any post.ta <br /> 1/41 U <br /> UPRITE POST <br /> U <br /> ® U <br /> 01 <br /> �V FLOOR PROTECTOR/SHIM (ITEM 10) <br /> - <br /> E, <br /> g3 <br /> t,-,::,,,,-,- <br /> z$�a s= 0ss ` <br /> 'N.,0s4 <br /> '"==.0$00 <br /> DETAIL <br /> DETAIL J <br /> ( C /����; SOMAHA, NEBRASKA D 68110 01-60 OMPCOA-88EV 05-21-14 <br /> ©201 4 COZIER CORPORATION (800) 228-9882 PAGE 7 OF 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.