My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12 SW EVERETT MALL WAY MALLORY PAINT STORE 2019-09-05
>
Address Records
>
SW EVERETT MALL WAY
>
12
>
MALLORY PAINT STORE
>
12 SW EVERETT MALL WAY MALLORY PAINT STORE 2019-09-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 10:27:34 AM
Creation date
9/5/2019 10:27:29 AM
Metadata
Fields
Template:
Address Document
Street Name
SW EVERETT MALL WAY
Street Number
12
Tenant Name
MALLORY PAINT STORE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{ <br /> POST-INSTALLED ANCHORS REPORT MAYES TESTING ENGINEERS <br /> ATerracen cow <br /> Report Number: M7181438.0002 <br /> Service Date: 06/12/18 20225 Cedar Valley Rd Ste 110 <br /> Report Date: 06/15/18 Lynnwood, WA 98036-6365 <br /> 425-742-9360 <br /> Client Project <br /> Mallory Paint Store Inc Mallory Paint Store Everett <br /> Attn: Lisa Faulk 12 SW Everett Mall Way <br /> 145 NW Gilman Blvd Everett, WA <br /> Issaquah, WA 98027 <br /> Project No.: M7181438 <br /> Permit No.: B1804-024 Weather: Inside <br /> Samples: N/A <br /> On site for proprietary anchor inspection. Inspected all-thread installation for shelving units. Holes were cleaned <br /> with a hand pump and bottle brush prior to using Hilti HIT HY-200R epoxy (lot#2022 16L2, expiration 03/2019). <br /> All-thread anchors were 3/8" diameter x 8" long and installed per epoxy manufacturer's directions. Witnessed <br /> 3/8"-diameter lag bolts installed into solid wood floor joists. Anchors were installed into (15) total racks at new <br /> store. <br /> To the best of our knowledge, the items inspected today are in conformance with approved plans and <br /> specifications. <br /> • <br /> Services: Special Inspections/Materials Testing <br /> Mayes!Terracon Rep.: Mark Vassallo <br /> Reported to: Mallory Paint Store <br /> Contractor: Mallory Paint Store <br /> Report Distribution: <br /> (1)Mallory Paint Store Inc,Lisa Faulk (1)City of Everett WA,Permit Services <br /> (1)Mayes Testing Engineers,Inc,Bob Reviewed By: ®'_� <br /> 94 r <br /> Gardner <br /> Robert Gardner <br /> Senior Project Field Manager c;/ <br /> The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client <br /> indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to <br /> the actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br /> CT0001,10-16-13,Rev.10 Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.