My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6320 EVERGREEN WAY VERIZON WIRELESS ANTENNA 2019-09-05
>
Address Records
>
EVERGREEN WAY
>
6320
>
VERIZON WIRELESS ANTENNA
>
6320 EVERGREEN WAY VERIZON WIRELESS ANTENNA 2019-09-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 12:21:05 PM
Creation date
9/5/2019 12:20:55 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
6320
Tenant Name
VERIZON WIRELESS ANTENNA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t, k <br /> I <br /> i ipm <br /> . bia <br /> N <br /> Bra <br /> am <br /> SCHEDULE OF SPECIAL INSPECTION SERVICES SCHEDULE OF SPECIAL INSPECTION SERVICES SCHEDULE OF SPECIAL INSPECTION SERVICES 1111) <br /> PROJECT APPLICABLE TO THIS PROJECT APPLICABLE TO THIS PROJECT APPLICABLE TO THIS PROJECT <br /> YIF YIF YIF <br /> MATERIAL/ACTIVITY SERVICE REQ. EXTENT AGENT* ATE COMPLETED MATERIAL/ACTIVITY SERVICE REQ. EXTENT AGENT*DATE COMPLETED MATERIAL/ACTIVITY SERVICE REQ. EXTENT AGENT*DATE COMPLETED <br /> Verify use of approved design Prior to placement of <br /> 1705.2 Steel Construction Field review Y Periodic <br /> mix controlled fill,observe Field Inspection Y Periodic <br /> Material verification of Review material Fresh concrete sampdng. Field testing Y Continuous hes ds and verify that site PACIKIQ I3CNaN. <br /> ptpATI <br /> high-strength bolts,nuts,and markings and certificates Y Periodic has been prepared properly <br /> washers, of compliance of concrete end <br /> 1705.11.1 Structural <br /> shotcrete placement for Field Inspection Y Continuous <br /> Inspection of high-strength Field inspection proper application techniquesSteel Special Inspections - <br /> bolting: Concrete and shotcrete for Selsmk Resistance <br /> a.Snug-tight joints Periodic curing operations. Field inspection Periodic Continuous Inspection of <br /> structural welding In SEA-FLEMING <br /> b.Pre-tensioned and Erection of precast concrete Field inspection Periodic accordance with AISC 341, Shop and Held inspection Continuous <br /> slip-critical joints members. Seismic Provisions <br /> 1)Tum-of-nut with y Periodic Concrete strength testing and Field testing and review 1705.11.7 Storage Racks <br /> matching markings verification of compliance Y Periodic (NE'W BUILD I <br /> with construction documents of laboratory reports and Access Floors <br /> 2)Direct tension indicator Periodic verification of In-situ concrete Special Seismic Resistance for <br /> Resistance 8320 EVERGREEN WAY <br /> 3)Twist-off bolt y Periodic strength,prior to stressing of <br /> 4 Tum-of-nut <br /> tendons In post tensioned Review field testing and <br /> Periodic Inspection during the EVERETT WA 203 <br /> without matching Y Continuous concrete and prior to removal laboratory reports end storage racks 8 feet a <br /> °9 of shores end forms from anchorage of access floors Field Ins SNOHOMSH COUNTY <br /> martdngs beams and structural slabs. greater In height inspection y Periodic <br /> 5)Calibrated wrench(Ref. Inspection of fomhwork for 1705.11.5 Architectural <br /> details on sheets A9.2-A9.4 Y Continuous shape,Ones,location and Field Inspection Y Periodic Components Special <br /> for torquing requirements. dimensions Inspections for Seismic <br /> Material verification of 1705.4 Masonry Construction Resistance O <br /> structural steel: Inspection during the erection <br /> a.Identification markings Field inspection y Periodic Verify proportion of site and fastening of exterior <br /> Field inspection Y Periodic <br /> prepared mortar,grout and Field and submittalcladding and Interior and <br /> b.Certified mail tests Review submittals Y Each submittal prestressing grout for bonded review Y Periodic exterior veneer, CAM^ Pf <br /> *�' <br /> tendons. Inspection during the erection <br /> Reviewzte of Verify construction of mortar and fastening of Interior and <br /> Weld filler materials. compliance <br /> and field PeriodicField Inspection Periodic exterior inspection Y Periodic ASSOCIATES <br /> verification walls. <br /> exterior non load bearing <br /> Verify location of walls. <br /> Structural steel welding: Shop and field Inspection reinforcement and 1705.11.6 Mechanical& 19401 40TH AVE.W.,SUITE 304 <br /> connectors,and placement of Field ins Y Periodic Electrical Components LYNNWOOD,WA 98036 <br /> a.Complete and portal Continuous prestressing tendons and inspection ( ) <br /> penetration groove weldsP 9 Special Inspections for PHONE:425 740-6390 <br /> anchorages. Pe FAX:(425)224-1614 <br /> Seismic Resistance <br /> b.Multi-pass fillet welds Continuos W W W.CAMPASSOC.COM <br /> Verify prestressing technique Field Inspection Periodic Inspection during the <br /> a.Single-pass fillet wrelds> <br /> Continuousanchorage of electrical <br /> 5/16- Verify size and location of Field and submittal Field inspection Periodic PROJECT MANAGER. MTM <br /> d.Single-pass filet welds< <br /> structural masonry elements. review Y Periatlk equipment for emergency or <br /> Y Periodic standby power systems. <br /> 5/16" Verify type,size,and location Level 1-Periodic: Inspection during the <br /> e.Floor and deck welds of anchors,Including details - <br /> Y Periodic of anchorage of masonry to Field Inspection anchorage of other electrical Field inspection Y Periodic <br /> Reinforcing steel waking: Shop and field Inspection structural members,frames, Level 2- Inspecequipment. PREPARED BY. GA <br /> e.Verification of vreldabllt of or other censWction. Continuous nspection during installation <br /> y Periodic Verify size,grade,and type of canypipingfla systems(Mended to <br /> steel other than ASTM A 706 of reinforcement. <br /> Field inspector Y Periodic APPROVE)BY. MTM <br /> b.Reinforcing steel-resisting or highly toxic contents andie <br /> flexural and axial forces In V�e�welding of reintordng Field inspection Continuous their associated mechanical - -- <br /> Intermediate and special units. <br /> moment frames,and ContinuousVerify protection of masonry <br /> the <br /> boundary elements of special during hot/cold weather. Field inspection PeriodicInsNaW ion of HVAC ductwork <br /> Field inspection Periodic <br /> concrete shear wads,and Y Level 1-Periodic that will contain hazardous 2 GA 01/22/19 FINAL PERMIT ISSUE <br /> shear reinforcement Verify grout space is deo Field inspection materials 1 GA 01/11/17 FINAL PERMIT ISSUE <br /> c.Shear reinforcement Continuous <br /> prior to grouting. Level 2- Inspection during the <br /> instalation of vibration Field Inspection Periodicd.Other reinforcingsteel Periodic Verify gran placement isolation systems.Continuous 0 GA 12/15/16 PRELIM PERMIT ISSUE <br /> A GA 10/17/16 PRELIM PERMIT ISSUE <br /> Inspection of steel frame joint <br /> complies with code end Field inspection Y Continuous <br /> construction document Steel1705.12.2 <br /> es Structural <br /> details To compliance with Field inspection provisions. Steel Testing for Seismic <br /> approved construction -PLAN REVIEWERS SIGNATURE <br /> documents. Testing of grout specimens, Resistance <br /> mortar specimens,and/or Test In accordance with the <br /> a.Details such as bracing& Field testing PeriodicShop and field testing Per AISC 341 <br /> stiffeningdic Prisms required by 9ualfy assurance <br /> construction documents requirements of AISC 341, <br /> b.Member locations Periodic Observe preparation of Seismic Provisions <br /> c.Application of joint details prisms required by Field Inspection Continuous Ultrasonically test for <br /> M each construction documents discontinuities behind and <br /> Periodic cst <br /> Verify compliance withadjacent to welds with base <br /> 1705.3 Concrete Construction required testing and metalthicker than 1.5 inches Shop and field tasting Each occurrence <br /> Field testing and where subject to <br /> Inspection of reinforcing steel <br /> inspectionovisions of <br /> s and Periodic <br /> inspection through-thickness weld <br /> Installation. Field Inspection y Periodic. shrinkage strains. I <br /> the approved submittals. <br /> inspection of prestressing Irplant o field review Pedodk Verify grade and size of 1705.11.6 Seismic <br /> steel Installation. <br /> Inspection of restressed prestressing tendons and Field inspection Periodic Qualificationicalod STEP <br /> p in-plant a field review anchorages. Mechanical and <br /> concrete: <br /> a.Application of prestressing Verify proper grouting of Field Inspection Continuous - Eb Review certificate Equipment ,tlegylT/j• <br /> force Continuous Prestressing tendons. of CertlAcete of cempdance a of 9 < <br /> b.Grouting of bonded compliance for designated Y Each submittal F - m <br /> Verify application and Level 1-Periodic review <br /> prestressing tendons in the measurement of prestressing Field Inspection Level 2 seismic system components ,i/ u/ <br /> Continuous / j�- II / <br /> seismic-fora:-resisting f0� Continuous - / I <br /> system <br /> 1705.6 Soils ..j4, ,!Last• <br /> Inspection of anchor bolts to <br /> Verify materials below "TONAL 4'01/2Z/Ig <br /> be installed in concrete prior <br /> to and du <br /> shallow foundations are Field inspection Y Periodic <br /> ring placement of <br /> concrete where allowable Field inspection Continuous adequate to achieve the <br /> loads have been increased design bearing capacity. <br /> SHEET <br /> RABE <br /> per IBC section 1908.5 or Verify excavations are <br /> where strength design is used extended to proper depth and Field inspection y Periodic <br /> inspection of anchors and have reached proper material. SPECIAL <br /> reinforcing steel installed In Perform classification and <br /> hardened concrete:verify testing of controlled f11 Field Inspection Periodic INSPECTION <br /> anchor type,anchor materials. <br /> dimensions,hole dimensions, <br /> hole cleaning procedures, Field inspection y Periodic d )Verify use and diner thicknesses <br /> materials, <br /> anchor spacing,edge <br /> during <br /> hole <br /> andkField inspection Y Continuous <br /> distances,concrete minimum compaction of controlled fill - <br /> r NUMBERthickness,anchor <br /> embedment and tightening <br /> torque <br /> S1.2 <br /> •The registered/certified agent In accordance with the project jurisdiction. <br /> 0_?1 <br /> - <br /> PROECT NUMBER <br /> • <br /> 20181380230 <br />
The URL can be used to link to this page
Your browser does not support the video tag.