Laserfiche WebLink
` 4 ...i <br /> LEGEND. <br /> Ob' VERIZON WIRELESS/GC RESPONSIBILITY O (E) SNOHOMISH PUD UTILITY POLE WITH POLE MOUNTED TRANSFORMER O (E) BLOCK WALL 1414) <br /> TO PROVIDE CONNECTION TO NEW SERVICE <br /> ® FIBER PROVIDER RESPONSIBILITY 0 (E) BUILDING <br /> ® (E) BOLLARD, TYP <br /> ® EXISTING SITE ITEMS O (E) GAS METER OF OTHERS 0 (E) WALL OF ENCLOSURE 0 <br /> VZW/GC RESPONSIBILITY ABOVE O (E) ELECTRIC VAULT N <br /> O (E) TELECOM RISER OF OTHERS VERIZON WIRELESS/GC RESPONSIBILITY(FIBER RELATED). •_ <br /> VZW/GC RESPONSIBILITY BELOW O VZW/GC TO INSTALL (N) FIBER VAULT hiM <br /> FIBER PROVIDER RESPONSIBILITY ABOVE VZW/GC TO INSTALL (N) LC/UPC FIBER PANEL, a) <br /> 0 SPLICE TRAYS AND PRE-CONNECTORIZED CABLESDEMARC WITH FIBER ASSOCIATED TAILS <br /> 0 <br /> 0 VZW/GC TO CORE DRILL HOLES THROUGH EXTERIOR WALL, (TYPICAL <br /> OF 4) <br /> CCCLIA PACIFIC CORPcn AT,ON <br /> _ VZW/GC TO INSTALL 3—(N) 2" CONDUIT FROM (N) FIBER VAULT TO <br /> © I 0 (N) CORE DRILLED HOLE ON EXTERIOR WALL <br /> 0 ma \\ 0 \ O VZW/GC TO INSTALL 3-(N) 2" CONDUITS ABOVE DROP CEILING <br /> I SEA-FLEMING <br /> ., / \ N O VZW/GC TO INSTALL 3-(N) 2" CONDUIT THROUGH (N) CORE DRILLED <br /> HOLEOOONN REEXTERIOR WALL TO (N) DEMARC CABINET ON (E) WALL OF I NEW BUILD ) <br /> \ ' I 6320 EVERGREEN WAY <br /> \ 1 - 0VZW/GC TO INSTALL (N) 2" CONDUIT FROM (N) FIBER VAULT TO (N) EVERETT, WA 98203 <br /> ` r ti 9 CORE DRILLED HOLE ON EXTERIOR WALL FOR FUTURE FIBER SNOHOMISH COUNTY <br /> _ <br /> . moi_ <br /> E aft- __ <br /> (((C <br /> O , � ' 0 ' <br /> �1r <br /> \N m 0 6A CAMP+ <br /> ASSOCIATES <br /> \' ^` • VERIZON WIRELESS/GC RESPONSIBILITY (POWER RELATED). 19401 40TH AVE.W.,SUITE 304 <br /> ` I _ LYNNWOOD,WA 98036 <br /> I PHONE(425)740-6390 <br /> `F 'i 0 ) VZW/GC TO INSTALL (N) SERVICE WEATHERHEAD ON EXTERIOR WALL FAX:(425)224-1614 <br /> WWW.CAMPAS OCCOM <br /> 0 j <br /> O / '" O VZWSNOH/GCOMISH TO INSTALLPUD (N) METER MOUNTED ON EXTERIOR WALL PER PROJECT MANAGER' EJC <br /> r / REQUIREMENTS <br /> F- <br /> O / 0 ' /� O VZW/GC TO INSTALL (N) INTEGRATED LOAD CENTER (ILC) ON (E) WALL PREPARED BY GA <br /> ® ' I\\\ • Z/ OF ENCLOSURE <br /> 0 O VZW/GC TO INSTALL (N) 2" CONDUIT FROM (N) SERVICE WEATHERHEAD APPROVED BY' sJ\, <br /> ' / TO (N) METER, TO (N) CORE DRILLED HOLE ON EXTERIOR WALL <br /> __ 120A7/30/19 FINAL PERMIT ISSUE-- <br /> / <br /> \ 11 GA1/17/19 FINAL PERMIT ISSUE <br /> VZW/GC TO INSTALL (N) 2" CONDUIT ABOVE DROP CEILING <br /> i; i \ \ 10 GA12/12/18 REVISED REDS <br /> . 0 \ VZW/GC TO INSTALL (N) 2" CONDUIT FROM (N) CORE DRILLED HOLE 9 GAI2/03/18 REVISED REDS <br /> TO (N) INTEGRATED LOAD CENTER (ILC) ON (E) WALL OF ENCLOSURE 8 GA11/13/18 REVISED REDS <br /> ' <br /> C711 • 7 RL 11/02/18 REVISED REDS <br /> �p 'I ----"0 C_ SNOPUD TO PULL (N) POWER WIRE FROM (E) POLE MOUNTED PLAN REVIEWERS SIGNATURE <br /> ' /F4 F `E_ / TRANSFORMER ON (E) UTILITY POLE TO (N) SERVICE WEATHERHEAD, <br /> ////'"' I 0 THEN THROUGH (N) 2" CONDUIT FROM (N) SERVICE WEATHERHEAD TO <br /> 0 '�_�► -4,°`� 0 /1! C ` 0 O (N) METER MOUNTED TO EXTERIOR WALL, THROUGH CORE DRILLED <br /> ._ I 0 HOLE ON EXTERIOR WALL, ABOVE DROP CEILING, THROUGH CORE <br /> ``�F ` ,P� I F DRILLED HOLE ON EXTERIOR WALL TO (N) INTEGRATED LOAD CENTER <br /> ` 0 F` (ILC) ON (E) WALL OF ENCLOSURE <br /> _+ 1 <br /> I <br /> I 0 <br /> 0 = PROFS• 0. •L STAMP <br /> If <br /> I 1.e.;11 .!'6 At, 3 <br /> 40 5J 1 <br /> % ati <br /> 0 <br /> .0-/ <br /> FIBER PROVIDER RESPONSIBILITY(FIBER RELATED). <br /> 0 //I WAVE BROADBAND TO PROVIDE (N) OVERHEAD FIBER STRIKE TO (E) <br /> Is UTILITY POLE FROM DONOR SITE: SEA—SOUTH EVERETT 'EXPIRES u'�2.p I <br /> ______,,,/,\\ <br /> / \ WAVE BROADBAND TO INSTALL (N) CONDUIT DROP FOR FIBER ON (E) SHEET NAME <br /> ,--, . /111 <br /> " UTILITY POLE ENLARGED POWER <br /> I / 1a WAVE BROADBAND TO INSTALL (N) CONDUIT FROM (N) CONDUIT DROP & FIBER ROUTING <br /> TO (N) FIBER VAULT PLAN <br /> I i WAVE BROADBAND TO PULL (N) FIBER THROUGH (N) CONDUIT DROP <br /> el) <br /> TO (N) FIBER VAULT, THEN THROUGH (N) 4" CONDUIT W/(2) 1-1/4' SHEET NUMBER <br /> ENLARGED SITE PLAN - ENLARGED SITE PLAN - 9 INNER DUCTS & MEASURED MULE TAPE THROUGH CORE DRILLED HOLE <br /> ON EXTERIOR WALL, ABOVE DROP CEILING, THROUGH CORE DRILLED E—2.1 <br /> FIBER & POWER PLAN NORTH FIBER & POWER PLAN NORTH HOLE ON EXTERIOR WALL, TO (N) DEMARC CABINET ON (E) WALL OF <br /> - <br /> (START) 0 2 4 8 (END) 0 2 a 6 ENCLOSURE (09 <br /> PROJECT NUMBER <br /> I 2 S 21 20161380230 <br /> SCALE. 3/4' - V-0' (22x34), 3/8' - 1'-0' (11x17) SCALE. 1/2' - T-0'(22x34), 1/4' - V-0' (11x17) IMMIIIIII <br />