Laserfiche WebLink
I <br /> A 2015 Washington State Energy Code Compliance Forms for Commercial,R2 and R3 over 3 stories and all R1 <br /> Mechanical Summary MECH-SUM <br /> 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised January 2017 <br /> Project Information Project Title: Big Lots,6727 Evergreen Way,Everett WA Date 12/17/2018 <br /> Applicant Information. Provide contact information for individual who can respond to For Building Dept.Use <br /> inquiries about compliance form information provided. <br /> Company Name: Interplan,LLC <br /> Company Address: 604 Courtland Street <br /> Applicant Name: Stacy Henson <br /> Applicant Phone: 407-645-5008 <br /> Project Description ❑New Building ❑Building Addition 2 Tenant Improvement ❑System Retrofit ❑No System Changes <br /> Briefly describe mechanical systems in Packaged rooftop units with supply dropboxes and some ductwork for restrooms and offices. <br /> the text box provided <br /> ❑Total Bldg Performance(TBP) <br /> This path includes all mandatory <br /> provisions per C401.2 Option 2. <br /> MECH-SUM,MECH-CHK,and C407 <br /> Energy Analysis forms required. <br /> ❑ Load calculation summary 0 MECH-LOAD-CALC Form <br /> Design Load Calculations Provide design load calculations for all mechanical systems and equipment serving the building heating,cooling or <br /> ventilating needs.If a load calculation summary is provided with the permit documents that includes all applicable <br /> compliance information then the MECH-LOAD-CALC form is not required. <br /> ❑✓ Mechanical Plans ❑ MECH-EQ Forms(TBD) <br /> Mechanical Schedules Indicate location of equipment compliance information.If provided on plans then MECH-EQ forms are not required, <br /> however,include on plans all applicable compliance information listed in MECH-EQ tables. <br /> ❑✓ DOAS is required per C403.6 effective July 1,2017(office,retail,education,library and fire station occupancies) <br /> All occupied,conditioned areas shall be served by a DOAS that delivers required ventilation air in a manner that does <br /> not require space conditioning fan operation.Space conditioning fans cycled off when no heating or cooling is required. <br /> Dedicated Outdoor Air ❑ Ventilation provided via natural ventilation per 2015 IMC in lieu of DOAS(C403.6,Exception 1) <br /> System Requirements and ❑ Ventilation and space conditioning provided by a HEVAV system per C403.7 in lieu of DOAS(C403.6,Exception <br /> High Efficiency VAV ❑ DOAS included in project,although not required(occupancy not office,retail,education,library or fire station) <br /> Alternate ❑ DOAS related allowances included in project: <br /> ❑ Prescriptive vertical fenestration maximum area allowance increased to 40%per C402.4.1.4 with 100%of <br /> conditioned floor area in building served by DOAS. <br /> ❑ Exception to air economizer per C403.3 Exception 1,include MECH-ECONO form. <br /> 0 Project includes HVAC air distribution systems that provide heating and/or cooling <br /> If yes,provide a MECH-FANSYS-SUM form. <br /> Fan Power El For one or more systems,the total fan motor nameplate hp of all fans in HVAC system exceeds 5hp. <br /> If yes,provide a seperate MECH-FANSYS form for each HVAC system exceeding the 5 horsepower threshold. <br /> Refer to Section C403.2.11 and MECH-FANSYS-DOC for requirements and exceptions. <br /> ❑ Hydronic chilled water ❑ Water-loop heat pump ❑✓ No hydronic systems <br /> HVAC Hydronic Systems <br /> ❑ Hydronic heating water ❑ Geothermal <br /> ❑ C406.2 More efficient HVAC equipment and fan systems <br /> Requires 90%of heating and cooling capacity to be equipment listed in tables C403.2.3(1)-(9)or air-to-water heat <br /> pumps and heat recovery chillers.All equipment listed in tables C403.2.3(1)-(7)must be 15%m.r-i tient than <br /> C406 Additional minimum requirements.All stand alone supply,return,and exhaust fans over 1hp must h- �_ ,ust be <br /> selected within 10%of maximum total or static pressure. l'ILE,VO4 <br /> Efficiency Options- . ❑ C406.6 Dedicated outdoor air system(DOAS) ((�4� nE <br /> Requires 90%of conditioned floor area to be served by a DOAS per C403.6 that• iYe2S =="'Ma a :y - 0 <br /> Mechanical manner that does not require space conditioning fan operation. A, 4" p IA i <br /> ❑ C406.7 Reduced energy in service water heating y eli+ 0 <br /> Requires 90%of floor area be in occupancy types listed in C406.7.1 and that r, %o annual h. -rgy••-Z ' <br /> be provided by heat pump,waste heat recovery or solar water-heating system <br /> 1O 5�0�• I <br /> `il' '4. <br /> CO <br /> JAN 0 4 "019 <br />