Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 8/27/2019 8:01 <br /> Issued By BRP BIGLEY,RYAN P. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 6/25/2019 <br /> Fund 401 Accounts Program Function Activity <br /> Program UT3473 18 3 <br /> Title CONVERT.75 INCH 403 N CABOT RD UT3473-18-3 <br /> Work Order No 20191666 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 6/25/2019 Time 08:42 Original WO Billing <br /> Completed By Time Follow Up? <br /> Problem Details <br /> CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROJECT. <br /> Structure ID StrTyp Activity Compl Date Comments <br /> WS0785D022 WASRVC YES 7/2/2019 <br /> Address 403 N CABOT RD <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 403 N CABOT RD <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M BOX000154347 BOX METER MOLDED PLASTIC W/DI LID 11"X 18" (SMALL) 1 75.229 07/03/2019 PAP <br /> M COUP34142747 COUPLING 3/4 CTS COMPRESSION X 3/4 MIP.871-.879 1 11.78 07/03/2019 PAP <br /> M ELLO34104247 ELBOW 3/4 NPT 90 DEG STREET BRASS(1/4 BEND) 1 3.835 07/03/2019 PAP <br /> M METE34141847 METER 5/8 X 3/4 NEPTUNE W/E-CODER R9001 CU FT STUB ANTENNA 1 205.897 07/03/2019 PAP <br /> M VALV34008348 VALVE METER 3/4 LOCKWING ANGLE METER VALVE SWVLNUT X 3/4FIP 149.188 07/03/2019 PM <br /> Total Material Cost45.94 <br />