Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 9/6/2019 12:50 <br /> Issued By SJT2 SPOONER,JAMES T. <br /> Issued Department PW PUBLIC WORKS , <br /> Date Issued 5/17/2019 <br /> Fund 401 Account 5 Program 710 Function 119 Activity 677 <br /> Program <br /> Title RELOCATE HYDRANT 8525 EVERGREEN WAY 710119677 <br /> Work Order No 20191449 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 5/17/2019 Time 13:29 Original WO Billing <br /> Problem Details <br /> RELOCATE EXISTING HYDRANT APPROX. 3 FEET EAST AND 4'NORTH <br /> FOR SIDEWALK EXPANSION. <br /> Structure ID StrTvp Activity Compl Date Comments <br /> WFH1384A03 WAHYD YES 5/22/2019 <br /> Address 8525 EVERGREEN WAY <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 8525 EVERGREEN WAY-46 FT W <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M ELL044039647 ELBOW 6 MJ 45 DEG DI(1/8 BEND) 1 54.986 05/22/2019 PM <br /> M ELL044039647 ELBOW 6 MJ 45 DEG DI(1/8 BEND) 1 54.986 05/22/2019 PM <br /> M HYDR44092047 HYDRANT 4 FT BURY MJ 1 2073.375 05/22/2019 PM <br /> M MEGA44044447 MEGALUG 6 KIT 2 72.106 05/22/2019 PM <br /> M MEGA44044447 MEGALUG 6 KIT 3 108.159 05/22/2019 PM <br /> M PIPE44055147 PIPE 6 MON JOINT DI CLASS 52 12 188.124 05/22/2019 PM <br /> M HYDR44092047 HYDRANT 4 FT BURY MJ -1 -2073.375 09/04/2019 PM <br /> Total Material Cost $478.38 <br />