My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023 HOYT AVE 2019-09-09
>
Address Records
>
HOYT AVE
>
2023
>
2023 HOYT AVE 2019-09-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2019 1:42:13 PM
Creation date
9/9/2019 1:42:13 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
2023
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T <br /> Work Activity Work Order Page 2 <br /> 8/6/2019 11:03 <br /> Issued By BRP BIGLEY,RYAN P. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 6/17/2019 <br /> Fund 401 Account 5 Program 710 Function 119 Activity 675 <br /> Program <br /> Title REPAIR.75 INCH POLY 2023 HOYT 710119675 <br /> Work Order No 20191630 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 6/17/2019 Time 15:28 Original WO Billing <br /> Problem Details <br /> Structure ID StrTyp Activity Compl Date Comments <br /> WS1995H032 WASRVC YES 6/17/2019 <br /> Address 2023 HOYT AVE <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 2023 HOYT AVE <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M ADAP34000647 ADAPTER 3/4 FIP X 3/4 IPS INSTA-TITE 1 15.628 06/18/2019 PM <br /> M ADAP34000447 ADAPTER 3/4 IPS INSTA-TITE UNION 1 21.261 06/18/2019 PM <br /> M COUP36143547 COUPLING 1 FEMALE COPPER THREAD X 3/4 MIP CTN 1 13.611 06/18/2019 PM <br /> M ELLO34154947 ELBOW 3/4 NPT 45 DEG STREET BRASS(1/8 BEND) 1 3.952 06/18/2019 PM <br /> M PIPE34060647 PIPE 3/4 POLY IPS 200 PSI SIDR7 ASTM D2239 3 .954 06/18/2019 PM <br /> Total Material Cost $55.40 <br /> NA Costs <br /> Type Na No Description Quantity Cost Billing Date War <br /> NA N/A 3/4 MINUS .5 12.81 06/18/2019 <br /> Total NA Cost $12.81 <br /> Total Cost $68.21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.