My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2325 TAYLOR DR 2022-05-23
>
Address Records
>
TAYLOR DR
>
2325
>
2325 TAYLOR DR 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 11:59:34 AM
Creation date
9/9/2019 3:20:59 PM
Metadata
Fields
Template:
Address Document
Street Name
TAYLOR DR
Street Number
2325
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC /ORKS PERMIT IDateApplied: 7/5/2018 <br /> ellp City of Everett Permit Services Public Works Permit#: PW1807-017 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> _ Everett,WA 98201 Planning Reference#: SS18-003 <br /> (425) 257-8810 Public Works Fel f2t5E019 2018 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> MV3, LLC SCOTT CHAD <br /> 728 3RD ST, STE D <br /> MUKILTEO, WA, 98275 <br /> PHONE: 4257506315 PHONE: 4257506315 <br /> TAX PARCEL ID#: 00417000100202 SITE ADDRESS: 2325 TAYLOR DR <br /> DESCRIPTION: SITE WORK FOR 2-LOT SHORT PLAT <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett 'Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans and drainage report approved by the City of Everett Public Works Department dated <br /> 9/14/2018. Approved plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction to set up <br /> an on-site pre-construction consultation. All inspections must be formally requested. See the attached handout for phone <br /> number and online instructions to Request an Inspection. .74:3 <br /> 6. City of Everett Water Department crews shall make all connections to City water main at ow nerico.ntractor's xpEtsE <br /> This work to be under a separate Utility Permit to be purchased at the Permit Services C .unte,\AloLls Mall,be'sCheduled 3-4 <br /> weeks in advance. _:•__ <br /> 7. As-builts of storm, sanitary sewer, and water systems will be required to be submitted thy/ it or i;-r City <br /> Design and Construction Standards and Specifications for Development prior to final approval/close ou of theermit. <br /> 8. All private easements shown on plans shall be shown on the short plat map with legal descriptions of each oism i' -The <br /> easments will be recorded with the short plat map. <br /> 11. A Landscape Inspection is required by the Planning Department prior to final by the PutAlic Works Inspector. Cont the <br /> Planning Department at 425-257-8731 to schedule the inspection. inn <br /> 12. This permit must be finaled in order to close out this permit/apply for final short plat.�C�° ithe inspection line to regst a <br /> Final for this permit when all items have been completed. r3® � <br /> o <br /> Public Works Permit Fee Breakdown: `_' - -,r..:7 <br /> Paving (2,579SF) $45.00 Q'`' <br /> Erosion Control (2-Lot S.P.) $70.00 <br /> Grade/Fill/Excavate (250CY) $90.00 <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> I The undersigned owner/applicant hereby agrees to hold and save <br /> I harmless the City of Everett from any and all claims for damages,costs, <br /> / l /� LYII p expenses,or causes of action that may arise because of installation and <br /> ALAl maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date 7 <br /> Approved as Constructed (PW Inspector) Signatu e o Ap scant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.