Laserfiche WebLink
e. <br /> VSPECTION REPORT <br /> ve <br /> Date �j 1 Permit: L1i 2 1 `-I 1 <br /> ... 1.. <br /> Contractor: SEPA,- A-ii/( t -- 0 J <br /> OP$44 Owner: 6 hq, VO- ol <br /> ���,, in <br /> Site Address: )2004 �!) t � ) <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> k ❑DryCeiling Grid <br /> wall Nailing ❑Plumbing Final <br /> Electrical Final ❑Shear Nailing GAS PIPE <br /> ✓/ ITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PER I T <br /> .C.O. ❑ CORRECTION REQUESTEDA <br /> ❑ OK FOR C.O. ❑ VIOLATION r/ <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> / / 4 <br /> / -�„ <br /> 77 ,,al r— <br /> 1 I <br /> Inspector: Alf Date: _ 111 <br /> EIR(10/06) DATABAR,INC. <br />