Laserfiche WebLink
2 <br /> INSPECTION REPORT <br /> / /� j� / ` ` %/�V <br /> Date C(//!� / � Permit: J G � � �"0-3 <br /> Contractor: r r_ rhe <br /> ow j, tli''' <4, /1 <br /> Owner: h C� eJ v1�l /1/ <br /> Site Address: &0 /1 3 Ge#44, tt) , <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Cil+ng Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains uilding Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FORT O. ❑ CORRECTION REQUESTED — - — ❑ <br /> OK C.O. ❑ VIOLATION <br /> A TO PERFORM INSPECTION: <br /> LL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> 6 n Ai 7:0-C/7— <br /> Pieo &i a Ai ,'/76.- etk <br /> 19-z-D 40- D - .. <br /> Inspector: /J Fs' Date: 4i--- �_ <br /> a EIR(10/06) �r�� DATABAR,INC. <br />