My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2408 39TH ST CINGULAR WIRELESS ANTENNA 2019-09-10
>
Address Records
>
39TH ST
>
2408
>
CINGULAR WIRELESS ANTENNA
>
2408 39TH ST CINGULAR WIRELESS ANTENNA 2019-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2019 8:38:06 AM
Creation date
9/10/2019 8:37:58 AM
Metadata
Fields
Template:
Address Document
Street Name
39TH ST
Street Number
2408
Tenant Name
CINGULAR WIRELESS ANTENNA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 31, 2017 <br /> 130 Ft Monopole Tower Structural Analysis Report CCI BU No. 815285 <br /> Project Number 85660.008.01,Application 402883, Revision 1 Page 5 <br /> 3.2) Assumptions <br /> 1) Tower and structures were built in accordance with the manufacturer's specifications. <br /> 2) The tower and structures have been maintained in accordance with the manufacturer's <br /> specification. <br /> 3) The configuration of antennas, transmission cables, mounts and other appurtenances are as <br /> specified in Tables 1 and 2 and the referenced drawings. <br /> 4) Mount areas and weights are assumed based on photographs provided. <br /> 5) Base and flange plate design methodology of the manufacturer has been reviewed and found to <br /> Be an acceptable means of designing to resist the full capacity of the bolts and shaft. <br /> This analysis may be affected if any assumptions are not valid or have been made in error. B+T <br /> Group should be notified to determine the effect on the structural integrity of the tower. <br /> 4)ANALYSIS RESULTS <br /> Table 5- Section Capacity(Summary) <br /> Section Elevation(ft) Component Type Size Critical P(K) SF*P_allow % Pass/Fail <br /> No. Element (K) Capacity <br /> L1 130-120 Pole P30x3/8 1 -3.774 1311.060 3.9 Pass <br /> L2 I 120-80 I Pole P30x3/8 2 1 -16.271 1311.060 40.4 Pass <br /> L3 80-40 Pole P36x3/8 3 i -28.192 1490.100 88.5 Pass <br /> L4 40-0 Pole P42x1/2 4 i -40.852 2410.400 86.2 Pass <br /> �. _ <br /> Summary <br /> Pole(L3) 88.5 Pass <br /> i Rating= 88.5 Pass <br /> Table 6 -Tower Component Stresses vs. Capacity—LC7 <br /> Notes Component Elevation (ft) % Capacity Pass/Fail <br /> 1,3 , Flange Connection 80 40.4 Pass i <br /> 1,3 Flange Connection 40 88.5 Pass <br /> 1 Anchor Rods Base 87.2 Pass <br /> 1,2 Base Plate Base i 87.2 Pass <br /> 1 Base Foundation (Structure) Base 54.1 Pass <br /> 1 Base Foundation (Soil Interaction)`; Base • 19.8 Pass <br /> Structure Rating (max from all components)= 88.5% <br /> Notes: <br /> 1) See additional documentation in"Appendix C—Additional Calculations"for calculations supporting the%capacity <br /> consumed. <br /> 2) Base plates have the same capacity as their respective bolt. <br /> 3) Flange plates have the same capacity as their respective shaft. <br /> 4.1) Recommendations <br /> The tower and its foundation have sufficient capacity to carry the final load configurations. No <br /> modifications are required at this time. <br /> tnxTower Report-version 7.0.5.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.