Laserfiche WebLink
WAC 296-46B-900° ELECTRICAL PLAN REVIEW <br /> DIRECTIONS: Read the WAC section below to determine if plan review is required or not required. Then select the box next to(a)to <br /> tell City Staff if plan review is not requried and select the box next to the specific reason from WAC 296-468-900. If plan review is <br /> required,select the box next to(b)and (c)to acknowledge that plan review is required and the electrical plans have been provided <br /> with this permit application. <br /> • *If item (a)-(ii,iii, or v)is selected,the work must also comply with section(a)-(vil).See arrow flow chart below. <br /> (3)Electrical plan review. <br /> (a) Electrical plan review is not required for <br /> • (i)Low voltage systems; <br /> O (ii)Lighting specific projects that result in an electrical load reduction on each feeder involved in the project; <br /> (iii)Heating and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder <br /> involved in the project, provided there is not a corresponding increase in the available fault current in any feeder. <br /> (iv)Stand-alone utility fed services that do not exceed 250 volts,400 amperes where the project's distnbution system <br /> Li does not include: <br /> (A)Emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (B)An essential electrical system defined in NEC 517.2;or <br /> (C)A required fire pump system. <br /> -Li (v)Modifications to existing electrical installations where all of the following conditions are met; <br /> (A)Service or distribution equipment involved is rated not more than 400 amperes and does not exceed <br /> 250 volts or for lighting circuits not exceeding 277 volts to ground; <br /> (B)Does not involve emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (C)Does not involve branch circuits or feeders of an essential electrical system as defined in NEC 517.2; <br /> and <br /> (0) Service or feeder load calculations are increased by 5%or less. <br /> (vi)Electric power production source(s)such as solar photovoltaic,fuel cell, or wind electric system(s)with a total <br /> rating of 9600 watts or less. <br /> (vi))For installations in(a)(II), (Ill),and (v) of this subsection to be considered,the following must be available <br /> El to the electrical inspector before the work is initiated: <br /> (A)A clear and adequate description of the project's scope; <br /> (B)A load calculation(s); <br /> (C)What the load changes are, providing both before and after panel schedules as needed; and <br /> (D)Provide information showing that the service and feeder(s)supplying the panel(s)where the work is <br /> taking place has adequate capacity for any increased load and has code compliant overcurrent protection <br /> for that supply. <br /> NOTE: Electrical plan review is not required for"Medical, dental, and chiropractic clinic"of which is a clinic or <br /> • physicians'office where patients are not regularly kept as bed patients for twenty-four hours or more,per section <br /> (1)(c)(xii). <br /> (b)Electrical plan review is required for all other new or altered electrical projects in educational, institutional,or health care <br /> occupancies defined in this chapter. <br /> (G)If a review is required,the electrical plan must be submitted for review and approval before the electrical work is begun. <br /> Table WW1 Table 900-2 <br /> Health or Personal Care Facilities Educational and Institutional Facilities,Places of Assembly or Other Facilities <br /> (-Health or Personal Caro Facility I Plan Review I <br /> Type I Required Educational.Institutional.or Plan Review <br /> Other Facility Types Required <br /> I Wes <br /> -.wsn.1 horn.tr,-4,t tortgitrre. I YI#% ECuCatiOna Vitr5 <br /> insututionai VOS <br /> C1:;ar . nt#4 Ytt% <br /> As .4ted <br /> in fat)tly <br /> Pf ivace Scc,hoUtin hospttal e$ Notes to Tables 9004 and 900.2. <br /> ni,vate r).;;, 5aW-r ho4puil Y.% A Cay autt.oriced to do electrical ,tspecuons <br /> ty r:Qs , Y.04 troy Q,an ie,r-ewon faci.ity types cot <br /> Arribwistery Surgint fiCNty reviewed by Me 0i,paqment <br /> Rrna,Plery:c4.4sh VraK 'et& <br /> kelgderatattraatMer+tf4Kilq veS <br /> rtha,,Ced ttnoco!facility Yes <br /> ACS.tt fesidentiai eisliobiNtavrin I val D2: <br /> PERMIT Is , <br /> centw Page 2-Plan Review <br />