My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
F D Thomas Inc 9/9/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2020
>
F D Thomas Inc 9/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2019 10:10:38 AM
Creation date
9/10/2019 10:08:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
F D Thomas Inc
Approval Date
9/9/2019
Council Approval Date
8/28/2019
End Date
2/13/2020
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everpark Garage Structural Repairs
Tracking Number
0001981
Total Compensation
$1,386,761.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' City of Everett 00 72 00 -21 <br /> Everpark Garage Repairs 2018-034 <br /> accepted as substantially complete. Except for any portion(s)of Work specified for early completion or <br /> required by the Owner for early possession, Substantial Completion will not occur for any Work until the <br /> ' entire Project is ready for possession and use. The acceptance notice will include a Punch List of <br /> incomplete Work items and corrective Work, set the date for their completion and repair, describe the <br /> division of responsibility between the Owner and Contractor, and describe any other terms of acceptance. <br /> ' The Contractor will acknowledge receipt of the acceptance notice in writing, indicating acceptance of all <br /> of its terms and provisions. <br /> Subsequent to the Substantial Completion date,the Owner may exclude the Contractor from the Work <br /> during such periods when construction activities might interfere with the intended operation of the <br /> Project. The Owner,however, shall allow the Contractor reasonable access for completion or correction <br /> of incomplete Punch List items. <br /> 5.8. ACCEPTANCE OF WORK <br /> Upon completion of the Project, including, but not limited to,record drawings, as-builts,required reports <br /> and operations and maintenance manuals,the Contractor shall so notify the Owner's Representative in <br /> ' writing. Upon receipt of the notification,the Owner's Representative will promptly, by personal <br /> inspection, determine the actual status of the Work in accordance with the terms of the Contract. If the <br /> Owner's Representative finds materials, Equipment, or workmanship that do not meet the terms of the <br /> ' Contract,he or she will prepare a Punch List of such items and submit it to the Contractor. Following <br /> completion of the corrective Work by the Contractor,the Owner's Representative will notify the Owner <br /> that the Work has been completed in accordance with the Contract. The Owner shall make the final <br /> ' determination of acceptability and completion. For portions of the Project not previously accepted as <br /> substantially complete,the conditions of guarantee shall commence on the date that the Owner determines <br /> the Project is complete. <br /> ' 6. CHANGES <br /> ' 6.1 OWNER'S RIGHT TO DIRECT CHANGES TO THE WORK <br /> The Owner reserves the right to change the Work at any time. Such changes shall not invalidate the <br /> Contract nor release the surety, and the Contractor agrees to perform the Work as changed. Among <br /> ' others,these changes and alterations may include: <br /> 1. Deleting or omit any part of the Work, Equipment or material to be provided under this Contract, <br /> and <br /> 2. Increasing or decreasing quantities, <br /> 3. Altering Specifications,designs, or both, <br /> ' 4. Altering the way the Work is to be done, <br /> 5. Adding new Work or Extra Work, <br /> ' 6. Altering facilities, Equipment, materials, services, or sites,provided by the Owner,and <br /> 7. Ordering the Contractor to accelerate or Delay Work. <br /> If the Contractor and Owner do not agree upon scope of Work changed or adjustment to the Contract Sum <br /> and Contract Time,the Owner may, at its sole option,unilaterally direct the Contractor to implement any <br /> change by notice. The Owner shall not pay or be responsible or liable for any change implemented by the <br /> Contractor without explicit notice from the Owner to proceed. <br /> ' 6.2 EXTRA WORK <br /> At its sole option,the Owner may(1)perform Extra Work itself,(2)employ others to do it, (3)direct the <br /> ' Contractor to perform the Extra Work at existing unit bid price, (4)direct the Contractor to perform the <br /> 00 72 00 - 21 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.