My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
F D Thomas Inc 9/9/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2020
>
F D Thomas Inc 9/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2019 10:10:38 AM
Creation date
9/10/2019 10:08:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
F D Thomas Inc
Approval Date
9/9/2019
Council Approval Date
8/28/2019
End Date
2/13/2020
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everpark Garage Structural Repairs
Tracking Number
0001981
Total Compensation
$1,386,761.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 1 <br /> , / <br /> I u: 1 <br /> V E R E I I ADDENDUM NO.1 <br /> TO <br /> I WASHINGTON EVERPARK GARAGE REPAIRS <br /> #2018-034 <br /> June 3,2019 <br /> I <br /> NOTICE TO BIDDERS <br /> Addendum No. 1 contains the following revisions, <br /> additions, deletions and classifications and is hereby <br /> I made a part of the contract documents for the above <br /> named Project and shall be considered by all <br /> prospective bidders in submitting bids. <br /> IBidders must acknowledge receipt of addendum No.1 <br /> in the space provided on page section 00 4113-2 in the <br /> I Bid Form. Failure to comply with this requirement <br /> may render the Bid non-responsive and may cause <br /> rejection. <br /> I <br /> This Addendum No.1 consist of 2 pages, including all <br /> Irevisions, attachments. <br /> SPECIFICATIONS,PROPOSAL AND <br /> ICONTRACT DOCUMENTS <br /> ITEM 1 —Remove and replace Table of Contents with <br /> I00 01 10 Table of Contents(Revision A 5/31/19) <br /> ITEM 2—Delete/Remove Specifications 00 2213, 00 <br /> 4336, 00 4513 and 00 6800 from project manual. <br /> ITEM 3 — Section 00 2113—INSTRUCTION TO <br /> IBIDDDERS,remove and replace entire section 00 <br /> 2113 with attached revised Section 00 21 13 (Revision <br /> acilities Administration A - 5/31/19). <br /> Ever Wetmore Ave,Ste.9E Note the following revisions/deletions to Section 00 <br /> Everett,WA 98201 21 13 INSTRUCTIONS TO BIDDERS: <br /> 1. Deletion of Paragraph 1.13 -Award of Contract <br /> 161 425.257.6290 subsection 1.13.A.1c.(5) replacing with added new <br /> 425.257.6299 fax subsection 1.13.A.1 c. <br /> everettwa.gov 2. Added new subsection 1.13.A.1 c. (6) <br /> everettwa.gov <br />
The URL can be used to link to this page
Your browser does not support the video tag.