My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
F D Thomas Inc 9/9/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2020
>
F D Thomas Inc 9/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2019 10:10:38 AM
Creation date
9/10/2019 10:08:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
F D Thomas Inc
Approval Date
9/9/2019
Council Approval Date
8/28/2019
End Date
2/13/2020
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everpark Garage Structural Repairs
Tracking Number
0001981
Total Compensation
$1,386,761.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 4336- 1 <br /> Everpark Garage Repairs 2018-034 <br /> SECTION 00 4336 - PROPOSED SUBCONTRACTORS FORM <br /> 1. For heating, ventilation, air conditioning, plumbing (as defined by RCW Chap. 18.106)and <br /> ' electrical work (as defined by RCW Chap. 19.28), Bidder MUST either identify itself or <br /> Subcontractors in the chart below. If Bidder believes such work is not part of the Work, <br /> Bidder shall write "NO WORK". <br /> ' 2. Bidder shall not list more than one Subcontractor for each category of Work identified, <br /> unless Subcontractors vary with Bid alternates, in which case the Bidder must indicate <br /> which Subcontractor will be used for which alternate. <br /> 3. Bidder's Bid shall be deemed non-responsive and void if: <br /> A. For heating, ventilation, air conditioning, plumbing and electrical work, Bidder fails: <br /> (1) to submit as part of the Bid the names of such Subcontractors; (2) to name <br /> ' itself to perform such Work; or (3) to write "No Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same Work. <br /> 4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, <br /> plumbing, and electrical subcontractors applies only to proposed heating, ventilation and <br /> air conditioning, plumbing, and electrical subcontractors who will contract directly with the <br /> ' general contractor submitting the Bid to the City. <br /> Type/Scope of Work Name and Address of Subcontractor or Bidder <br /> ' HEATING <br /> Subcontractor, bidder or"no work" MUST be <br /> stated <br /> VENTILATION AND AIR CONDITIONING <br /> ' Subcontractor, bidder or"no work" MUST be <br /> stated <br /> PLUMBING (as described in RCW Chap. 18.106) Auburn Mechanical <br /> Subcontractor, bidder or"no work" MUST be <br /> stated 2623 W. Valley, HWY . Auburn, WA 9800: <br /> ELECTRICAL (as described in RCW Chap. 19.28) <br /> Subcontractor, bidder or"no work"MUST be stated <br /> END OF SECTION 00 4336 <br /> 1 <br /> 00 4336 - 1 PROPOSED SUBCONTRACTORS FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.