My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
F D Thomas Inc 9/9/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2020
>
F D Thomas Inc 9/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2019 10:10:38 AM
Creation date
9/10/2019 10:08:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
F D Thomas Inc
Approval Date
9/9/2019
Council Approval Date
8/28/2019
End Date
2/13/2020
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everpark Garage Structural Repairs
Tracking Number
0001981
Total Compensation
$1,386,761.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 5213 - 1 <br /> Everpark Garage Repairs 2018-034 <br /> SECTION 00 52 13 -AGREEMENT FORM <br /> ' CONTRACT <br /> ' THIS CONTRACT is made and entered into this vto day of PV&UST ,a019, by and <br /> between the City of Everett, Washington, a municipal corporation existing under the laws of the <br /> ' State of Washington, hereinafter called the "City," and <br /> D- -NornAS� S-NC,. a <br /> ME 6ot.1 CDR toWN3 , hereinafter called the "Contractor." <br /> In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees <br /> to furnish all labor, tools, materials, equipment, and supplies required to build and construct and <br /> to build and construct in a workmanlike manner the Work, improvements, and appurtenances in <br /> accordance with the Specifications and Drawings entitled: "Everpark Garage — Repairs", (the <br /> "Project"). <br /> 1. Contract Documents. The following documents ("Contract Documents") are <br /> incorporated by reference and are hereby made a part of this Contract: <br /> ' A. Notice to Bidders <br /> B. Instructions to Bidders <br /> ' C. General Conditions <br /> D. Supplementary Conditions (if any) <br /> ' E. Drawings, Standard Plans, and Specifications <br /> F. Addenda (if any) <br /> ' G. Payment and Performance Bond <br /> H. Contractor's Bid Form <br /> ' I. Other documents described as Contract Documents in Section 072000, <br /> General Conditions <br /> ' J. All provisions required by law whether set forth and reproduced herein or not <br /> Terms that are capitalized in a Contract Document but not defined in that Contract Document <br /> shall have the meaning defined to them in the other Contract Documents. <br /> 2. Contract Time. Substantial Completion of the Work shall be achieved within One <br /> Hundred Twenty (150) calendar days after the effective date of the Notice to Proceed. <br /> ' Physical Completion shall be within Thirty (30) calendar days after the actual date of <br /> issuance of substantial completion. <br /> ' 3. Liquidated Damages. The parties agree the City will suffer damage and be put <br /> to additional expense in the event that the Contractor does not complete the Work in all <br /> respects and have it ready for use by the Substantial and Physical Completion dates <br /> 00 5213 - 1 AGREEMENT FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.