My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
F D Thomas Inc 9/9/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2020
>
F D Thomas Inc 9/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2019 10:10:38 AM
Creation date
9/10/2019 10:08:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
F D Thomas Inc
Approval Date
9/9/2019
Council Approval Date
8/28/2019
End Date
2/13/2020
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everpark Garage Structural Repairs
Tracking Number
0001981
Total Compensation
$1,386,761.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 72 00 -4 ' <br /> Everpark Garage Repairs 2018-034 <br /> Samples: Physical examples of materials,Equipment,or workmanship that are representative of some <br /> portion of the Work and which establish the standards by which such portion of the Work will be judged. <br /> Schedule of Values: Allocation of Contract Sum to items of Work as provided in 9.1.1. Schedule of ' <br /> Values. <br /> Shall: Required conduct. <br /> Shop Drawings: All drawings, diagrams, illustrations, schedules, and other data or information,which <br /> are specifically prepared or assembled by or for Contractor and submitted by Contractor,to illustrate <br /> some portion of the Work. <br /> Shown: Refers to information presented on the Drawings,with or without reference to the Drawings. <br /> Site: Lands or areas indicated in the Contract Documents as being furnished by Owner upon which the <br /> Work is to be performed, including rights-of-way and easements for access thereto,and such other lands <br /> furnished by Owner that are designated for the use of Contractor. <br /> Specifications: That part of the Contract Documents consisting of written descriptions of the technical <br /> features of materials,Equipment, construction systems, standards, and workmanship. <br /> Specify: Refers to information described, shown, noted or presented in any manner in any part of the <br /> Contract Documents. <br /> Subcontractor: An individual or entity having a direct contract with Contractor or with any other <br /> Subcontractor for the performance of a part of the Work. <br /> Submittals: The information required by the Contract Documents provided by Contractor to the ' <br /> Owner's Representative or Owner. <br /> Substantial Completion: The day on which the Owner or Owner's Representative determines the <br /> Owner has full and unrestricted use and benefit of the Project,from both the operational and safety <br /> standpoints and only minor incidental Work, replacement of temporary substitute facilities,or minor <br /> correction or repair Work remains. Determination of Substantial Completion in whole or in part is solely <br /> at the discretion of the Owner. Substantial Completion does not mean complete in accordance with the <br /> Contract nor shall Substantial Completion of all or any part of the Project entitle the Contractor to Final <br /> Acceptance under the Contract. <br /> Supplier: A manufacturer,fabricator, supplier, distributor,materialman, or vendor having a direct ' <br /> contract with Contractor or with any Subcontractor to furnish materials or Equipment to be incorporated <br /> in the Work. <br /> Total Float: The amount of time any given activity or path of activities may be delayed before it will ' <br /> affect the Completion Date. <br /> Traffic: Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists,wheelchairs, and <br /> equestrian traffic. <br /> Unabsorbed Overhead: The reduction or loss of contribution to recovery of the Contractor's Overhead <br /> costs realized by the result of reduced Project or Contractor billings, or both,due to any reason <br /> whatsoever, including a Project extension. <br /> Unit Price Work: Refers to items of Work identified by unit prices in the bid form. <br /> Work: Refers to the Project and the labor,materials,Equipment, supplies, services, and other items <br /> necessary for the execution, completion and fulfillment of the Contract. <br /> 1.2. CONTRACT DOCUMENTS ' <br /> The complete Contract includes: <br /> 1. Federal requirements that apply to this Contract and Project; <br /> 00 72 00 -4 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.