My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2514 51ST ST SW 2019-09-10
>
Address Records
>
51ST ST SW
>
2514
>
2514 51ST ST SW 2019-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2019 10:37:27 AM
Creation date
9/10/2019 10:37:25 AM
Metadata
Fields
Template:
Address Document
Street Name
51ST ST SW
Street Number
2514
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEO Grou a Northwest Inc. Geotechnical Engineers,Geologists <br /> Environmental Specialists <br /> L;b v<✓/try P <br /> October 4,2017 G-4400 <br /> Mr. Edward Koltonowski <br /> 2514-51' Street SW <br /> Everett, WA 98203 <br /> Subject: Geotechnical Final Inspection Letter <br /> Permit No.:B 1707-050 <br /> Project Address: 2514- 51st Street SW, Everett, WA <br /> Description:Underpin the northeast portion of the house foundation with 3"diameter push <br /> piers. <br /> Mr. Koltonowski, <br /> This is our final geotechnical inspection letter, as requested by the City of Everett. A total of eight(8) <br /> 3-inch diameter push piers were installed by Innovative Foundation Solutions(IFS)to underpin the <br /> northeastern corner of the house foundation for the purpose of stabilizing and lifting to relevel the <br /> foundation. The foundation had settled about 3/4". <br /> Wade Lassey with GEO Group Northwest, Inc.,was at the site and inspected the pier installation and <br /> recorded the pier load test. Based on our observations the piers and the foundation brackets were <br /> installed in accordance with the project plans and specifications and are acceptable. The piers were <br /> individually installed to either a maximum installation pressure of 6000 psi(34,200 equivalent lbs) or <br /> until the house foundation started to lift. After installing all the piers,the foundation in the northeast <br /> corner was lifted and releveled. <br /> Attached is the field report with the recorded pier installation pressures and pier depths. A quick load <br /> test was performed in accordance with ASTM D1143-81 on pier#1 to 200 percent of the design load <br /> of 12,500 lbs and the load test passed. The load test data sheet is attached. <br /> 13705 Bel-Red Road - Bellevue,Washington 98005 <br /> Phone 425/649-8757 • Fax 4351649-8758 <br />
The URL can be used to link to this page
Your browser does not support the video tag.