Laserfiche WebLink
INSPECTION REPORT'eCz 0; <br /> Date l b(7,01/7 Permit: P& I703reV/ <br /> lir <br /> Contractor: *546 <br /> 4-%O.Ot i Owner: �'.c�l /d 3Z.-�c5 <br /> tol ,GZ <br /> Site Address: L� �4 (5." — <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ['Roof Nailing El Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> Roof drains ❑Building Final� [❑Gas Pipe Final El HWT Final <br /> OTHER OR CONSULTATION: 'G� `�-cc. _ <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> E l OK FOR C.O. VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> O(L 1)G2/4-0t/c' 4 k (1 <br /> g1fr/LL <br /> Inspector: 4- , wi•---- <br /> i21Date: /12'^ r-( 7 <br /> EIR(10/06) DATABAR,INC. <br />