My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Weber Construction Inc 8/28/2019
>
Contracts
>
Capital Contract
>
Weber Construction Inc 8/28/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:40:29 AM
Creation date
9/10/2019 10:41:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Weber Construction Inc
Approval Date
8/28/2019
Council Approval Date
7/24/2019
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Diversion Dam Road Phase 3 & Haybecker
Public Works WO Number
UT3707 UT3708
Tracking Number
0001982
Total Compensation
$419,958.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Weber Construction 4/15/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Weber Construction Inc 5/4/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ' City of Everett 00 7200 -21 <br /> Diversion Dam Road Phase 3 UT 3707 & UT 3708 <br /> safeguard the Work then completed and the materials and Equipment then delivered to the Site <br /> of the Work and to leave the Work in a safe and useful condition. Payment for this Extra Work <br /> will be made in accordance with 9.2. PAYMENT FOR CHANGES. <br /> 5.4.5. Ownership of Materials upon Termination <br /> As of the termination date, whether effected by the Owner or Contractor as provided herein, all <br /> the Contractor's right, title, and interest in and to materials ordered by the Contractor prior to <br /> termination, whether or not they have been delivered to the Site of Work, shall be vested in the <br /> Owner, and the Contractor shall, upon demand of the Owner, execute and deliver to the Owner <br /> all requisite bills of sale, assignments, and other documents of transfer that may be necessary <br /> to give effect to the intention of the termination procedures set forth above. <br /> 5.4.6. Opportunity to Cure <br /> If the Contractor has not already had an opportunity to cure the default or breach the Owner <br /> ' shall specify the default or breach and a reasonable period of time to allow the Contractor to <br /> cure the default or breach. The notice of termination will state the time period in which cure is <br /> permitted and other conditions as the Owner, in its sole judgment, shall deem appropriate. If <br /> ' Contractor fails to remedy the breach or default or any of the terms, covenants, or conditions of <br /> this Contract to the Owner's satisfaction within the time period specified or the Owner shall have <br /> the right to terminate the Contract without any further obligation to the Contractor. Any such <br /> termination for default shall not in any way operate to preclude the Owner from also pursuing all <br /> available remedies against Contractor and its sureties for said breach or default. <br /> 5.4.7 Waiver of Remedies for Any Breach <br /> ' In the event that the Owner elects to waive its remedies for any breach by Contractor or any <br /> covenant, term or condition of this Contract, such waiver by the Owner shall not limit the <br /> Owner's remedies for any succeeding breach of that or of any other term covenant, or condition <br /> of this Contract. <br /> 5.5. POSSESSION AND USE OF COMPLETED PORTIONS OF THE WORK <br /> The Owner shall have the right to take possession of and use completed or partially completed <br /> ' portions of the Work even though the time for completing the Work for such portions may not <br /> have expired. Operations and maintenance costs of use of such Work will be borne by the <br /> Owner. Such possession and use shall not be deemed as acceptance of the Work. If such <br /> prior possession or use increases the cost of the Work, the Contractor may be entitled to <br /> request extra compensation by giving Notice and following the procedures of ARTICLE 10. <br /> NOTICE TO OWNER and ARTICLE 12. CONTRACT CLAIMS within five (5) days of <br /> each occurrence. The Contractor shall not submit a Contract Claim for possession by the <br /> Owner of portions of the Work specifically required in the Contract Documents to be placed into <br /> use or operation before completion of the entirety of the Work. <br /> 5.6. POSSESSION OF INCOMPLETE PORTIONS OF THE PROJECT <br /> Should the Contractor fail to meet any date specified for Substantial Completion of Work or any <br /> portion of work requiring early possession and use by the Owner, the Owner may, after a 10- <br /> il day notice to the Contractor, take over such portion or any Work that is behind schedule. In <br /> such case, the Owner's Representative will prepare a list of incomplete Work taken over by the <br /> Owner. The cost of Owner's work will be charged to and deducted from amounts due to the <br /> ' Contractor. The Substantial Completion date of the entire or a portion of the Project will be <br /> established as the date when the Owner actually begins using the Project or portion of the <br /> Project for its intended purpose. Division of responsibilities between Owner and Contractor, <br /> beginning of warranties, and any other issues relating to Substantial Completion shall be as <br /> specified in 5.7. SUBSTANTIAL COMPLETION. <br /> 00 7200-21 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.