My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Weber Construction Inc 8/28/2019
>
Contracts
>
Capital Contract
>
Weber Construction Inc 8/28/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:40:29 AM
Creation date
9/10/2019 10:41:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Weber Construction Inc
Approval Date
8/28/2019
Council Approval Date
7/24/2019
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Diversion Dam Road Phase 3 & Haybecker
Public Works WO Number
UT3707 UT3708
Tracking Number
0001982
Total Compensation
$419,958.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Weber Construction 4/15/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Weber Construction Inc 5/4/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' City of Everett 00 2113- 5 <br /> UT 3707 <br /> Diversion Dam Road Phase 3 & UT 3708 <br /> interest of the City. The City, in its sole discretion, reserves the right to accept or <br /> ' reject any and all bids submitted and to waive informalities and minor irregularities. <br /> a. LOWEST: The City will award the Project to the responsive and responsible <br /> bidder whose Bid is the lowest. In accordance with RCW 39.04.380, if a bid <br /> ' is received from a nonresident contractor from a state that provides an in- <br /> state percentage bidding preference and does not have an office located in <br /> Washington, then a comparable percentage disadvantage will be applied to <br /> the bid of that nonresident contractor. <br /> b. RESPONSIVENESS: City will consider all the material submitted by the <br /> bidder to determine whether it is in compliance with the Contract Documents. <br /> The City reserves the right, at its discretion, to reject nonresponsive Bids. <br /> c. RESPONSIBILITY: <br /> 1) Mandatory Responsibility Criteria: RCW 39.04.350(1). It is the intent <br /> of City to award a contract to the lowest responsive and responsible <br /> ' Bidder. Before award, the Bidder must meet the Bidder responsibility <br /> criteria under this Section 1.13.A.1.c.(1) to be considered a <br /> responsible Bidder. The Bidder may be required by the City to submit <br /> ' documentation demonstrating compliance with the criteria under this <br /> Section 1.13.A.1.c.(1). The Bidder must: <br /> a) Registration. Have a current certificate of registration as a <br /> contractor in compliance with chapter 18.27 RCW, which must <br /> ' have been in effect at the time of bid submittal; and <br /> b) UBI. Have a current Washington Unified Business Identifier <br /> (UBI) number; and <br /> t 2) State Requirements. If applicable: <br /> a) Have Industrial Insurance (workers' compensation) coverage for <br /> the bidder's employees working in Washington, as required in <br /> Title 51 RCW; <br /> b) Have a Washington Employment Security Department number, <br /> as required in Title 50 RCW; <br /> c) Have a Washington Department of Revenue state excise tax <br /> ' registration number, as required in Title 82 RCW; and <br /> 3) Disqualification. Not be disqualified from bidding on any public works <br /> contract under RCW 39.06.010 or 39.12.065(3). <br /> ' 4) Apprentices. If the Project is subject to the apprenticeship utilization <br /> requirements in RCW 39.04.320, not have been found out of <br /> compliance by the Washington state apprenticeship and training <br /> ' council for working apprentices out of ratio, without appropriate <br /> supervision, or outside their approved work processes as outlined in <br /> their standards of apprenticeship under chapter 49.04 RCW for the <br /> ' one-year period immediately preceding the date of the bid solicitation. <br /> 5) Within the three-year period immediately preceding the date of the bid <br /> solicitation, not have been determined by a final and binding citation <br /> and notice of assessment issued by the department of labor and <br /> ' industries or through a civil judgment entered by a court of limited or <br /> general jurisdiction to have willfully violated, as defined in RCW <br /> 49.48.082, any provision of chapter 49.46, 49.48, or 49.52 RCW. <br /> ' 6) Supplemental Bidder Responsibility Criteria: RCW 39.04.350(2). If <br /> this Project is subject to supplemental bidder responsibility criteria, <br /> then such criteria will be contained in SECTION 002213, <br /> ' SUPPLEMENTAL INSTRUCTIONS TO BIDDERS. If there is no <br /> 00 2113 - 5 INSTRUCTIONS TO BIDDERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.