My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Weber Construction Inc 8/28/2019
>
Contracts
>
Capital Contract
>
Weber Construction Inc 8/28/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:40:29 AM
Creation date
9/10/2019 10:41:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Weber Construction Inc
Approval Date
8/28/2019
Council Approval Date
7/24/2019
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Diversion Dam Road Phase 3 & Haybecker
Public Works WO Number
UT3707 UT3708
Tracking Number
0001982
Total Compensation
$419,958.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Weber Construction 4/15/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Weber Construction Inc 5/4/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> City of Everett 00 4113-2 <br /> Diversion Dam Road Phase 3 UT 3707& UT 3708 <br /> 1 1.3 ACCEPTANCE <br /> SCHEDULE A SCHEDULE B <br /> ITEM EST. CONTRACT CONTRACT <br /> NO. DESCRIPTION UNIT QUANT. UNIT PRICE PRICE PRICE <br /> 1 1. Mobilization LS 1 LUMP SUM $ 39 ,,5O0 <br /> 00-' 2. Pioneering STA 8 $ J 500- $ do, poo- <br /> 1 <br /> 3. Drilled Holes EA 250 $ $ <br /> a U <br /> 571'3'00-- <br /> 4. <br /> 7,5004. Hauling CY 9,040 $ 1,6 <br /> ` $ 135- <br /> , (o00 <br /> I 5. Rock Crushing CY 7,040 $ 1 f ;v $ 80,9(00 <br /> 6. Timber Value Credit LS 1 LUMP SUM $ (23,000.00) <br /> I 7. Road Grade and Ditch CY 600 $ /9 <br /> - $ I 1 Li(n- <br /> f <br /> 8 Crushed Surfacing CY 200 $ $ <br /> 1 Base Course Lift �()- q,000 <br /> 9 Erosion and Sediment LS 1 LUMP SUM $ <br /> Control Measures 000 <br /> I10. 24"Culvert LS 1 LUMP SUM $ <br /> 11, Restoration LS 1 LUMP SUM $ 44! 00 <br /> 1 12. Force Account EST 1 $ $ 10,000.00 <br /> I13 Haybecker Culvert LS 1 LUMP SUM $ <br /> Replacement 11'7()50 <br /> I 14. Final Grade Lift CY 186 $ $ L <br /> 531 ' <br /> 15 Crushed Surfacing CY 55 $ $ /100-- <br /> Base Couse Lift <br /> 1 16. Erosion and Sediment LS 1 LUMP SUM $ <br /> Control Measures /MOO <br /> I 17. Restoration LS 1 LUMP SUM $ 3��0 - <br /> 18, Force Account EST 1 $ $ 10,000.00 <br /> I <br /> SUBTOTAL $ 3,1,ifLeo' $ 70(LI9V- <br /> TOTAL BID $ J I'q f O 's) <br /> In <br /> c <br /> 00 4113-2 BID FORM <br /> I <br /> IIProvided to Builders exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.