Laserfiche WebLink
' City of Everett 00 5213- 1 <br /> UT 3707 <br /> Diversion Dam Road Phase 3 & UT 3708 <br /> SECTION 00 5213 -AGREEMENT FORM <br /> CONTRACT <br /> fir. <br /> THIS CONTRACT is made and entered into this ,A' 1 day of .5 U L`t ,c2' , by and <br /> between the City of Everett, Washington, a municipal corporation existing under the laws of the <br /> State, " of Washington,. • hereinafter called the "City," and <br /> vvixe.r em--51af�f10/) /21i L,, hereinafter called the"Contractor." <br /> In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees <br /> to furnish all labor, tools, materials, equipment, and supplies required to build and construct and <br /> ' to build and construct in a workmanlike manner the Work, improvements, and appurtenances in <br /> accordance with the Specifications and Drawings entitled: "Diversion Dam Road Phase 3", (the <br /> "Project"). <br /> ' 1. Contract Documents. The following documents ("Contract Documents") are <br /> incorporated by reference and are hereby made a part of this Contract: <br /> ' A. Notice to Bidders (Advertisement for Bids) <br /> B. Instructions to Bidders <br /> C. General Conditions <br /> ' D. Supplementary Conditions (if any) <br /> E. Drawings, Standard Plans, and Specifications <br /> 1 F. Addenda (if any) <br /> G. Payment and Performance Bonds <br /> ' H. Contractor's Bid Form <br /> I. Other documents described as Contract Documents in Section 072000, <br /> ' General Conditions <br /> J. All provisions required by law whether set forth and reproduced herein or not <br /> ' Terms that are capitalized in a Contract Document but not defined in that Contract <br /> Document shall have the meaning defined to them in the other Contract Documents. <br /> ' 2. Contract Time. Substantial Completion of the Work shall be achieved within <br /> Ninety (90) calendar days after the effective date of the Notice to Proceed. Physical <br /> Completion shall be within Thirty (30) calendar days after the actual date of issuance of <br /> ' substantial completion. <br /> 3. Liquidated Damages. The parties agree the City will suffer damage and be put <br /> to additional expense in the event that the Contractor does not complete the Work in all <br /> ' respects and have it ready for use by the Substantial and Physical Completion dates <br /> stated above. Because it is difficult to accurately compute the amount of such costs <br /> and damages, the Contractor hereby covenants and agrees to pay to the City liquidated <br /> 00 5213 - 1 AGREEMENT FORM <br />