My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Weber Construction Inc 8/28/2019
>
Contracts
>
Capital Contract
>
Weber Construction Inc 8/28/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:40:29 AM
Creation date
9/10/2019 10:41:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Weber Construction Inc
Approval Date
8/28/2019
Council Approval Date
7/24/2019
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Diversion Dam Road Phase 3 & Haybecker
Public Works WO Number
UT3707 UT3708
Tracking Number
0001982
Total Compensation
$419,958.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Weber Construction 4/15/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Weber Construction Inc 5/4/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 7200 - iii <br /> I Diversion Dam Road Phase 3 UT 3707 & UT 3708 <br /> 8.4. MATERIAL AND EQUIPMENT SPECIFIED BY NAME 27 <br /> 8.5. REQUESTS FOR SUBSTITUTION 27 <br /> I 8.6. DEMONSTRATION OF COMPLIANCE WITH CONTRACT REQUIREMENTS 27 <br /> 8.6.1. Inspection 27 <br /> 8.6.2. Samples of Materials 28 <br /> I 8.6.3. Certification 28 <br /> 8.6.4. Inspection at Point of Manufacturing 28 <br /> 8.6.5. Testing and Commissioning of Completed Work 28 <br /> I8.6.6. Storage of Materials and Equipment 28 <br /> 8.6.7. Manufacturer's Directions 28 <br /> 8.7. DEFECTIVE WORK 29 <br /> I <br /> 8.7.1. Correction of Defective Work 29 <br /> 8.7.2. Retention of Defective Work 29 <br /> I 8.8. MATERIALS AND EQUIPMENT FURNISHED BY OWNER 29 <br /> 8.9. GUARANTEE 29 <br /> 8.10. CORRECTION PERIOD 30 <br /> I 9. MEASUREMENT AND PAYMENT 31 <br /> 9.1. PAYMENTS TO CONTRACTOR 31 <br /> 9.1.1. Schedule of Values 31 <br /> I9.1.2. Progress Payments 31 <br /> 9.1.2.1 Payment Request Procedures' 31 <br /> 9.1.2.2 Review Procedures. 32 <br /> I9.1.2.3 Retained Percentage 32 <br /> 9.1.2.4 Withholding 32 <br /> 9.1.3. Final Payment 33 <br /> I9.2. PAYMENT FOR CHANGES 34 <br /> 9.2.1. Changes in Estimated Quantities of Unit Price Work 34 <br /> I 9.2.1.1. Increased Quantities 34 <br /> 9.2.1.2. Decreased Quantities 34 <br /> 9.2.1.3. Limitations 34 <br /> I 9.2.2. Changes in Work Not Covered By Unit Prices 34 <br /> 9.2.3. Deleted Work 34 <br /> 9.3. CHARGES TO CONTRACTOR 35 <br /> I 9.4. COMPENSATION TO OWNER FOR TIME EXTENSION 36 <br /> 9.5. ADJUSTMENT OF CONTRACT SUM 36 <br /> 9.5.1 Calculation 36 <br /> I 9.5.2 Limitations 36 <br /> 9.5.3 Unabsorbed and Extended Overhead 37 <br /> 9.6. FORCE ACCOUNT 38 <br /> I 9.6.1 Labor. 38 <br /> 9.6.2. Materials. 39 <br /> 9.6.3. Equipment. 39 <br /> I 9.6.4. For Services. 39 <br /> 9.6.5. For Mobilization. 40 <br /> 9.6.6. For Contractor Markup on Subcontractor's Work. 40 <br /> I <br /> 00 7200 - iii GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.