My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Weber Construction Inc 8/28/2019
>
Contracts
>
Capital Contract
>
Weber Construction Inc 8/28/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:40:29 AM
Creation date
9/10/2019 10:41:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Weber Construction Inc
Approval Date
8/28/2019
Council Approval Date
7/24/2019
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Diversion Dam Road Phase 3 & Haybecker
Public Works WO Number
UT3707 UT3708
Tracking Number
0001982
Total Compensation
$419,958.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Weber Construction 4/15/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Weber Construction Inc 5/4/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' City of Everett 00 0000 - 6 <br /> Diversion Dam Road Project Phase 3 UT 3707 & UT 3708 <br /> ' 12.4.2 Extra Work <br /> 12.4.2.1 Adjustment of Contract Sum <br /> 12.4.2.2 Extension of Contract Time <br /> 12.4.3 Delays 44 <br /> ' 12.4.3.1 Owner Caused Delay Unrelated to Extra Work <br /> 12.4.3.1.1 Adjustment of Contract Sum <br /> 12.4.3.1.2 Adjustment of Contract Time <br /> ' 12.4.3.2 <br /> 12.4.3.3 Contractor Caused Delay <br /> Delays Concurrently Caused by Contractor and Owner <br /> 12.4.3.3.1 Adjustment of Contract Sum <br /> ' <br /> 12.4.3.412.4.3.3.2 Adjustment of Contract Time <br /> Third Party Caused Delays and Force Majeure <br /> 12.4.3.4.1 Caused Solely by Third Parties or Force Majeure <br /> 12.4.3.4.1.1 Adjustment of Contract Sum <br /> 12.4.3.4.1.2 Adjustment of Contract Time <br /> 12.4.3.4.2 Caused Concurrently by Third Parties and <br /> Contractor or Owner <br /> ' 12.4.3.4.2.1 Adjustment of Contract Sum <br /> 12.4.3.4.2.2 Adjustment of Contract Time <br /> 12.4.3.5 Extended or Unabsorbed Overhead <br /> ' 12.4.3.5.1 General <br /> 12.4.3.5.2 Elements <br /> 12.4.3.5.2.1 Resources <br /> ' 12.4.3.5.2.2 No Material Variations <br /> 12.4.3.5.2.3 Over absorbed Overhead <br /> 12.4.4 Inefficiencies <br /> 12.4.4.1 Adjustment of Contract Sum <br /> ' 12.4.4.2 Adjustment of Contract Time <br /> 13. DISPUTES <br /> 13.1 RESOLUTION <br /> ' 13.2 CONTINUING THE WORK <br /> 14. TIME LIMITATIONS AND JURISDICTION <br /> 15. LIABILITY AND INSURANCE <br /> ' 15.1 GENERAL <br /> 15.2 BONDS <br /> 15.2.1 Payment and Performance Bonds <br /> 15.2.2 Maintenance Bond <br /> ' 15.3 INSURANCE <br /> 15.3.1 General <br /> 15.3.2 Insurer Rating <br /> ' 15.3.3 Claims Made Form Requirements <br /> 15.3.4 Cross Liability Endorsement <br /> 15.3.5 Additional Insured <br /> ' 15.3.6 Contractor Insurance Primary <br /> 15.3.7 Assumption of Risk <br /> 15.3.8 Cost Included in Price <br /> 15.3.9 Subcontractors <br /> ' 15.3.10 <br /> 15.3.11 No Work Until Insurance Requirements Met <br /> Failure to Procure and Maintain Insurance <br /> 15.3.12 Cancellation <br /> 1 <br /> 00 0000 - 6 TABLE OF CONTENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.