My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Weber Construction Inc 8/28/2019
>
Contracts
>
Capital Contract
>
Weber Construction Inc 8/28/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:40:29 AM
Creation date
9/10/2019 10:41:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Weber Construction Inc
Approval Date
8/28/2019
Council Approval Date
7/24/2019
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Diversion Dam Road Phase 3 & Haybecker
Public Works WO Number
UT3707 UT3708
Tracking Number
0001982
Total Compensation
$419,958.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Weber Construction 4/15/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Weber Construction Inc 5/4/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' City of Everett 00 7200- 5 <br /> Diversion Dam Road Phase 3 UT 3707 & UT 3708 <br /> Traffic: Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, <br /> ' and equestrian traffic. <br /> Unabsorbed Overhead: The reduction or loss of contribution to recovery of the Contractor's <br /> ' Overhead costs realized by the result of reduced Project or Contractor billings, or both, due to <br /> any reason whatsoever, including a Project extension. <br /> Unit Price Work: Refers to items of Work identified by unit prices in the bid form. <br /> t Work: Refers to the Project and the labor, materials, Equipment, supplies, services, and other <br /> items necessary for the execution, completion and fulfillment of the Contract. <br /> 1.2. CONTRACT DOCUMENTS <br /> ' The complete Contract includes: <br /> 1. Federal requirements that apply to this Contract and Project; <br /> ' 2. Supplemental agreements between Owner and Contractor, if any, subsequent to the <br /> Owner's execution of the Contract; <br /> 3. Addenda; <br /> ' 4. The Contract; <br /> 5. Specifications, including, but not limited to, these General Conditions and other <br /> ' numbered Sections; <br /> 6. Supplementary Conditions, if any; <br /> 7. Drawings; <br /> ' 8. Change Orders; <br /> 9. City of Everett standard plans in effect as of the date Bids are opened; <br /> ' 10. Instructions to Bidders; <br /> 11. Contractor's completed Bid Form; and <br /> ' 12. Certifications and affidavits as required by this Contract and by law. <br /> These parts complement each other in describing the complete Work. Any requirement in one <br /> part binds as if stated in all parts. The Contractor shall provide any work or materials clearly <br /> ' implied in the Contract even if the Contract does not mention it specifically. Any inconsistency in <br /> the parts of the Contract shall be referred to the Owner's Representative attention for a <br /> determination of the intended requirements. <br /> ' The Work required in one part must be furnished even if not mentioned in other parts of the <br /> Contract. If any part of the Contract requires Work that does not include a description for how <br /> the Work is to be performed, the Work shall be performed in accordance with standard trade <br /> practice(s). For purposes of the Contract, a standard trade practice is one having such regularity <br /> ' of observance in the trade as to justify an expectation that the Contractor will follow or observe <br /> the practice in performing the Work. In case of any ambiguity, disagreement or Dispute over <br /> interpreting the Contract, the Owner's Representative's decision will be final as provided in <br /> ' these General Conditions. <br /> Approved Shop Drawings, other Contractor's Submittals, and the reports and drawings of <br /> subsurface and physical conditions are not Contract Documents. <br /> 00 7200- 5 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.