Weber Construction Inc 8/28/2019
>
Contracts
>
Capital Contract
>
Weber Construction Inc 8/28/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:40:29 AM
Creation date
9/10/2019 10:41:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Weber Construction Inc
Approval Date
8/28/2019
Council Approval Date
7/24/2019
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Diversion Dam Road Phase 3 & Haybecker
Public Works WO Number
UT3707 UT3708
Tracking Number
0001982
Total Compensation
$419,958.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Weber Construction 4/15/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Weber Construction Inc 5/4/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200- 8 <br /> Diversion Dam Road Phase 3 UT 3707 & UT 3708 <br /> Governmental agencies and owners of utilities reserve the right to enter upon streets, alleys, <br /> rights-of-way, or easements for the purpose of making changes in their property made <br /> necessary by the Work and for the purpose of maintaining and making repairs to their property. <br /> ' 2.3.3.2 Known Utilities <br /> The Contractor shall provide at its sole expense all labor, equipment, materials and services <br /> necessary to remove, relocate, or maintain utilities specified on the Drawings. The work on <br /> ' each utility shall be performed in a manner satisfactory to the utility owner. The utility owner has <br /> the option of doing such work with its own forces at the Contractor's expense, or permitting the <br /> work to be performed by the Contractor. <br /> ' 2.3.3.3 Service Connections <br /> Locations of service connections are not identified on the Drawings. The Contractor shall <br /> provide at its sole expense all labor, equipment and material to remove, relocate or maintain <br /> ' service connections. Work on service connections shall be performed in a manner satisfactory <br /> to the service connection owner. The service connection owner has the option of doing such <br /> work with its own force at the Contractor's expense, or permitting the work to be performed by <br /> the Contractor. <br /> 2.3.3.4 Unknown Utilities <br /> When a utility interferes with the Work and is either (1) not identified on the Drawings or (2) <br /> ' located in a position significantly different from that specified on the Drawings, Contractor shall <br /> follow the procedures of ARTICLE 11. DIFFERING SITE CONDITIONS. Interference with the <br /> Work is defined as a utility that crosses or projects into the plane of the Work at an elevation <br /> between the top and bottom of the Work. If it is necessary to remove, relocate, or temporarily <br /> ' maintain the utility, that work shall be included in a Change Order. The utility owner has the <br /> option of doing such work or permitting the work to be performed by the Contractor. In either <br /> case, the cost of the work incurred by or charged to the Contractor will be included in a Change <br /> ' Order. <br /> 2.4. SUBMITTALS <br /> ' Where required by the Contract Documents, the Contractor shall submit information which will <br /> enable the Owner's Representative to advise the Owner whether the Contractor's proposed <br /> materials, Equipment or methods of work are in general conformance to the design concept and <br /> in compliance with the Drawings and Specifications, such as catalog cuts and shop, working or <br /> ' detail drawings. In its Submittals, the Contractor shall expressly and explicitly notify the <br /> Owner's Representative of any and all deviations from the Specifications. Without express and <br /> explicit Notice of a deviation from the Contract requirements, approval of a Submittal does not <br /> ' relieve Contractor from complying with Contract requirements. The Owner's approval of a <br /> Submittal did not constitute a waiver of the Contract requirements. The Owner or Owner's <br /> Representative shall respond to a Submittal within thirty (30) days of receipt. The Owner or <br /> ' Owner's Representative may extend this time for good cause by notifying the Contractor. The <br /> Owner will not be obligated to accept or pay for Work performed by the Contractor that may be <br /> affected by materials, Equipment, or methods of work not submitted in a timely manner so that <br /> final review can be accomplished before the affected Work is complete. The Owner shall not be <br /> ' responsible for Delays, inefficiencies, or any additional costs or expenses caused in whole or in <br /> part by Contractor's failure to submit required information in sufficient time for review, comment, <br /> and correction. Contractor's failure to submit required information in sufficient time for review, <br /> ' comment and correction shall be deemed a waiver of any and all Contract Claims for <br /> adjustment of Contract Sum or Contract Time arising out of, or related to, such a Submittal. <br /> Contractor acknowledges and agrees that it may not rely upon receiving the Owner's response <br /> ' to a Submittal in less than thirty (30) days, unless the Owner explicitly changes this section by a <br /> signed Change Order. Requests for information or clarification from the Contractor to the <br /> Owner shall be treated as a Submittal. <br /> ' 00 7200- 8 GENERAL CONDITIONS <br />