My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Weber Construction Inc 8/28/2019
>
Contracts
>
Capital Contract
>
Weber Construction Inc 8/28/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:40:29 AM
Creation date
9/10/2019 10:41:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Weber Construction Inc
Approval Date
8/28/2019
Council Approval Date
7/24/2019
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Diversion Dam Road Phase 3 & Haybecker
Public Works WO Number
UT3707 UT3708
Tracking Number
0001982
Total Compensation
$419,958.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Weber Construction 4/15/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Weber Construction Inc 5/4/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' City of Everett 00 7200- 10 <br /> Diversion Dam Road Phase 3 UT 3707 & UT 3708 <br /> ' 2. It is in the public interest. <br /> The Owner's Representative and Owner shall have complete access to the Work and to the Site <br /> of the Work and to the places where Work is being prepared or where materials, Equipment, <br /> ' and machinery are being obtained for the Work. If requested by the Owner's Representative or <br /> Owner, the Contractor shall provide the assistance necessary for obtaining such access, and <br /> shall provide information related to the inspection of construction. Absence of such access or <br /> information, as needed, may result in the Owner's refusal to accept the Work. <br /> ' The Owner's Representative has the authority to recommend Change Orders, but does not <br /> have authority to approve Change Orders. Proposed Change Orders are subject to review and <br /> approval by the Owner. No proposed Change Order or any change of Contract Sum or <br /> Contract Time is effective or binding upon the Owner unless and until the Mayor or his or her <br /> designee signs it, as authorized by City Council or by ordinance. <br /> ' To detail and illustrate the Work, the Owner's Representative may furnish to the Contractor <br /> additional Drawings and explanations consistent with the original Drawings. The Contractor <br /> shall perform the Work according to these additional Drawings and explanations. <br /> ' The Owner's Representative may appoint assistants and inspectors to assist in determining that <br /> the Work and materials meet the Contract requirements. Assistants and inspectors have the <br /> authority to reject defective material and suspend Work that is being done improperly, subject to <br /> the final decisions of the Owner's Representative or, when appropriate, the Owner. <br /> ' Assistants and inspectors are not authorized to accept work, to accept materials, to issue <br /> instructions, or to give advice that is contrary to the Contract. Work done or material furnished <br /> which does not meet the Contract requirements shall be at the Contractor's risk and shall not be <br /> a basis for a Contract Claim even if the Owner's Representative, inspectors or assistants <br /> purport to change the Contract. <br /> Assistants and inspectors may advise the Contractor of faulty Work or materials or <br /> ' infringements of the terms of the Contract; however, failure of the Owner's Representative or <br /> the assistants or inspectors to advise the Contractor does not constitute acceptance or <br /> approval. <br /> ' The Contractor shall submit supplemental working or detail drawings as required for the <br /> performance of the Work pursuant to 2.4. SUBMITTALS. Except as noted, all drawings and <br /> other Submittals shall be delivered directly to the Owner's Representative. The drawings shall <br /> ' be on sheets measuring 22 by 34 inches, 11 by 17 inches, on sheets with dimensions in <br /> multiples of 8 1 /2 by 11 inches, or other size approved by the Owner consistent with the Work <br /> to be detailed. Contractor shall provide drawings far enough in advance of ordering or <br /> ' installation to allow for review by the Owner's Representative or other agencies and possible <br /> resubmittal and further review after resubmittal. After a plan or drawing has been reviewed and <br /> returned to the Contractor, all changes proposed by the Contractor may be submitted to the <br /> ' Owner's Representative for review and comment. <br /> The Contractor shall obtain the Owner's Representative's written acknowledgement of approved <br /> Submittals before proceeding with the Work represented by the Submittal. Such review does not <br /> impose any responsibility upon the Owner, nor does it relieve the Contractor of any <br /> responsibility for the accuracy of the Submittal or its conformity with the Contract. The <br /> Contractor shall bear all risk and all costs of any Work delays caused by resubmittal or <br /> correction of Submittals. The Contractor shall allow sufficient time for Owner's review of <br /> Submittals and possible corrections by the Contractor so as not to delay the Work. <br /> The Contractor's Bid price shall include all costs of all Submittals, including, but not limited to, <br /> working, detail and shop drawings. <br /> 111 <br /> 00 7200 - 10 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.