Weber Construction Inc 8/28/2019
>
Contracts
>
Capital Contract
>
Weber Construction Inc 8/28/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:40:29 AM
Creation date
9/10/2019 10:41:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Weber Construction Inc
Approval Date
8/28/2019
Council Approval Date
7/24/2019
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Diversion Dam Road Phase 3 & Haybecker
Public Works WO Number
UT3707 UT3708
Tracking Number
0001982
Total Compensation
$419,958.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Weber Construction 4/15/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Weber Construction Inc 5/4/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' City of Everett 00 7200- 11 <br /> Diversion Dam Road Phase 3 UT 3707 & UT 3708 <br /> 4. CONTRACTOR <br /> ' 4.1. CONTRACTOR'S REPRESENTATIVE <br /> ' The Contractor shall notify the Owner in writing of the name of the person who will act as the <br /> Contractor's representative and shall have the authority to act in matter relating to this Contract. <br /> This person shall have authority to carry out the provisions of the Contract and to supply <br /> materials, Equipment, tools and labor without delay for the performance of the Work. <br /> ' Contractor shall employ and keep on Site on a full time basis personnel experienced in the <br /> management of construction of projects of this size and type. These shall include, but not be <br /> limited to, a project manager and superintendent. Neither the Contractor's project manager nor <br /> ' the superintendent shall have supervisory responsibility for other Projects for the Contractor <br /> while assigned to this Project. Contractor shall employ and assign such additional, full time <br /> office, support and engineering personnel to support the project manager and superintendent <br /> ' and allow timely completion of the Project. The project manager and superintendent must be <br /> approved by the Owner, and such approval shall not be unreasonably withheld. Contractor <br /> acknowledges that one of the instances in which it will be reasonable for the Owner to withhold <br /> ' consent is if the project manager or superintendent is different than as stated in the Bidder <br /> Qualification Statement. Contractor shall submit personnel qualifications within ten (10) days of <br /> Contractor's execution of the Contract. Bases for disapproval include, but are not limited to, <br /> ' lack of sufficient experience managing the construction of similar type or size projects or <br /> relationships on other projects unsatisfactory to the Owner. Owner may require removal and <br /> replacement of Contractor's supervisory staff who are disruptive or who appear to lack sufficient <br /> competence to complete the Project successfully. <br /> 4.2. CONSTRUCTION PROCEDURES <br /> The Contractor shall supervise and direct the Work and determine the means, methods, <br /> techniques, sequences and procedures of construction, except in those instances where the <br /> Owner, to define the quality of an item of Work, specifies in the Contract, a means, method, <br /> technique, sequence or procedure for construction of that item of Work. <br /> 4.3. SUBCONTRACTORS <br /> Unless explicitly specified elsewhere in the Contract Documents or expressly authorized in <br /> writing by the Owner before Contractor submits its Bid, the Contractor shall perform with its own <br /> ' organization at least one-third of the Work by dollar volume and Contractor shall not sublet to a <br /> single Subcontractor more than one-half of the Project. A Subcontractor of the Contractor shall <br /> not sublet to another Subcontractor more than one-half of its work without the written consent of <br /> the Owner obtained within twenty (20) days of award of the Contract to the Contractor. The <br /> Owner may refuse to approve such subcontract for any reason. Only unit price and Schedule of <br /> Value items of the Contract will be used in computing the total Work. The Owner may, at its <br /> sole option, refuse to approve a Subcontractor that is also providing services to the Owner on <br /> the same project. <br /> Subcontractors will be considered agents of the Contractor and their work shall be subject to the <br /> ' provisions of the Contract. References in the Contract Documents to actions required of <br /> Subcontractors, manufacturers, Suppliers, or persons other than the Contractor, the Owner or <br /> the Owner's Representative shall be interpreted as requiring that the Contractor shall require <br /> such Subcontractor, manufacturer, Supplier or Person to perform the specified action. <br /> Contractor shall comply with RCW 39.04.250 (1992) and RCW 39.76.011 (1992), as amended, <br /> and any successor and other laws, ordinances, and regulations regarding payment of <br /> Subcontractors. Contractor shall also comply with the requirements of RCW Chap. 60.28 and <br /> any other law, ordinance, or regulation relating to the release of retainage to Subcontractors. <br /> 1 00 7200 - 11 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.