1 <br /> ' City of Everett 00 7200- 16 <br /> Diversion Dam Road Phase 3 UT 3707 & UT 3708 <br /> ' 5. PROGRESS AND COMPLETION <br /> 5.1. NOTICE TO PROCEED <br /> ' Following execution of the Contract by the Owner, the Owner or Owner's Representative will <br /> give the Contractor a written Notice to Proceed. Notwithstanding other provisions of the <br /> Contract, the Contractor shall not be obligated to perform Work, and the Owner will not be <br /> obligated to accept or pay for Work performed by the Contractor or be liable for any Delays, <br /> ' prior to delivery of the Notice to Proceed. The Owner's knowledge of Work being performed <br /> prior to delivery of the Notice to Proceed will not obligate the Owner to accept or pay for such <br /> Work. Contractor waives any and all Contract Claims for an adjustment of Contract Sum and <br /> ' Contract Time arising out of, or related to, work it performs prior to receipt of the Notice to <br /> Proceed. The Owner may issue partial Notices to Proceed. <br /> 5.2. CONTRACT TIME <br /> ' 5.2.1. General <br /> TIME IS OF THE ESSENCE IN PERFORMING THE CONTRACT. Failure to complete the <br /> ' Project within the contractually specified time may affect other Projects and Owner activities. <br /> Contract Time starts upon the later of the issuance of the Notice to Proceed or a date specified <br /> in the Notice to Proceed. The Contractor shall promptly start the Work as soon as possible after <br /> ' the date of the Notice to Proceed and shall prosecute the Work so that the various portions of <br /> the Project shall be completed in accordance with the Contract Time period. Contractor shall <br /> perform its work at such times and in such ways that the Work is not damaged by weather such <br /> as wind, rain, or snow. Contractor shall correct or repair at its sole expense any Work damaged <br /> ' by weather, irrespective of whether such damage is covered by insurance. No portions of the <br /> Work where acceptable quality will be affected shall be constructed while unfavorable conditions <br /> exist. By bidding on the Project and executing a Contract to perform the Work, Contractor <br /> ' agrees the contractually required completion dates are feasible, reasonable, and achievable for <br /> the Contract Sum. Contractor represents that it has considered all factors relevant to its price <br /> and achieving the Completion Dates, including, but not limited to, weather, Site access, labor <br /> ' conditions and the availability of materials, supplies and Equipment. Compliance with ARTICLE <br /> 10. NOTICE TO OWNER, ARTICLE 12. CONTRACT CLAIMS, and 5.2.2. Construction <br /> Schedule are conditions precedent to a request for, consideration of, and grant of, any <br /> extension of Contract Time. Failure to request a time extension in the manner and in the time <br /> required by this section, and the Specifications referred to herein, constitutes a waiver by the <br /> Contractor of any and all entitlement to an extension of time and any adjustment of Contract <br /> Sum arising out, or related to, such Delay. <br /> 1 5.2.2. Construction Schedule <br /> 5.2.2.1 General <br /> ' Contractor shall submit, update and maintain schedules as required by the Contract <br /> Documents. <br /> The Contractor shall provide sufficient material, equipment, and labor to meet the interim <br /> ' milestones, Substantial Completion, Physical Completion and Completion Dates provided by the <br /> Contract Documents. The Owner allocates its resources to a Contract based on the total time <br /> allowed in the Contract. The Contractor may submit a schedule indicating Completion Date <br /> earlier than the end of Contract Time, but Owner cannot guarantee its resources will be <br /> ' available to meet such schedule. Owner shall not pay or be liable for any additional <br /> compensation if the Contractor is not able to meet a schedule that indicates a Completion Date <br /> earlier than the end of Contract Time. <br /> Failure to schedule Owner furnished or installed materials and Equipment for installation on or <br /> after its planned arrival pursuant to the Owner's contract with the supplier or failure to Notify the <br /> 00 7200- 16 GENERAL CONDITIONS <br />