' City of Everett 00 7200 - 17 <br /> Diversion Dam Road Phase 3 UT 3707 & UT 3708 <br /> Owner of tasks dependent upon the fact or date of arrival of such Owner furnished materials <br /> and Equipment, constitute a waiver by Contractor of any Contract Claim arising out of or related <br /> to the timeliness of the furnishing or installation of such material and Equipment. All schedules <br /> must allow for timely incorporation of any other's work under separate contract with Owner and <br /> ' for timely incorporation of work provided and installed by Owner. Unless otherwise expressly <br /> authorized in writing by the Owner's Representative, the Contractor must integrate the <br /> schedules with the Schedule of Values and unit price items so that each construction activity is <br /> represented by a dollar value. <br /> Float in a Progress Schedule belongs to the Owner. <br /> Subcontractors shall review all schedules prior to submission to the Owner and Owner's <br /> ' Representative. At the Owner's option and sole discretion, Owner may require Contractor to <br /> obtain written acceptance of each schedule by Subcontractors as practical and feasible, as the <br /> schedule relates to Subcontractors' work. <br /> ' Contractor shall not schedule any activity with an unrealistic, unduly long, or unduly short <br /> duration. Contractor shall use its best efforts in good faith to set reasonable durations for all <br /> activities. Contractor shall not attempt to "grab the Float" or make any effort to use any Float in <br /> ' the Progress Schedule for the benefit of the Contractor. <br /> Contractor shall submit with each Application for Payment or progress pay estimate an updated <br /> Progress Schedule, but no less often than monthly. If requested by the Owner's Representative <br /> ' or the Owner, Contractor shall prepare and submit updated Progress Schedules from time to <br /> time, which may be more frequent than monthly. <br /> The Contractor hereby expressly agrees and acknowledges that any failure by Contractor to <br /> ' provide accurate, complete, current and updated schedules with each and every progress pay <br /> estimate or Application for Payment constitutes a waiver of any and all claims or requests for <br /> adjustment of Contract Sum or Time that arise out of, result from, or are caused by, any Delay <br /> ' on the Project or scheduling of the Work. Timely submission of monthly updated schedules is a <br /> condition precedent to any later or subsequent Contract Claim or request for an adjustment of <br /> either Contract Sum or Time related to or arising out of time, an alleged Delay, or the schedule <br /> or sequence of Work. Similarly, the parties agree the Owner may withhold progress pay <br /> ' estimates if updated schedules are not timely submitted. These remedies are cumulative and <br /> not exclusive of any other remedy. The Owner's use of one or more of these remedies does not <br /> constitute an election or prevent the Owner from pursuing other remedies for this or other <br /> ' defaults. <br /> The Owner's Representative's review of any schedule shall not transfer any of the Contractor's <br /> responsibilities to the Owner. The Contractor alone shall remain responsible for adjusting <br /> forces, equipment, and work schedules to ensure completion of the Work within the Contract <br /> Time. Review by the Owner or Owner's Representative shall not constitute approval or <br /> acceptance of the Contractor's construction means, methods, sequencing, logic, order, <br /> ' precedence and succession of activities or Contractor's ability to complete the Work in a timely <br /> manner. Any mistakes or errors in any schedule, including, but not limited to, mistakes or errors <br /> of logic, order, precedence, and duration, are and remain the Contractor's. The Owner or <br /> ' Owner's Representative may comment upon the schedule. <br /> 5.2.2.2 Extensions of Contract Time <br /> Any requests for extensions in Contract Time, whether resulting from Extra Work directed by the <br /> Owner or not, shall be accompanied by an analysis of schedules using the critical path method. <br /> This analysis shall include an updated schedule, an as-planned schedule, an as-built schedule, <br /> a but-for schedule, and narrative explaining the alleged causes, schedule impacts and all costs <br /> related to or arising out of the proposed extension. Any requests for extensions of Contract <br /> Time by the Contractor shall be submitted in accordance with these General Conditions. <br /> 00 7200- 17 GENERAL CONDITIONS <br />