My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2514 51ST ST SW Geotech Report 2022-10-25
>
Address Records
>
51ST ST SW
>
2514
>
Geotech Report
>
2514 51ST ST SW Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 11:40:50 AM
Creation date
9/10/2019 10:41:07 AM
Metadata
Fields
Template:
Address Document
Street Name
51ST ST SW
Street Number
2514
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C E C7 Grou • Northwest Inc• GeatceEn Engineers,Geologists <br /> & <br /> b: Environmental Specialists <br /> 41—z t AS 3 7 4t-S <br /> October 4,2017 G-4400 <br /> Mr. Edward Koltonowski <br /> 2514 -51s`Street SW <br /> Everett, WA 98203 <br /> Subject: Geotechnical Final Inspection Letter <br /> Permit No.:B 1707-050 <br /> Project Address: 2514- 51"Street SW, Everett, WA <br /> Description:Underpin the northeast portion of the house foundation with 3"diameter push <br /> piers. <br /> Mr. Koltonowski, <br /> • <br /> This is our final geotechnical inspection letter, as requested by the City of Everett. A total of eight(8) <br /> 3-inch diameter push piers were installed by Innovative Foundation Solutions(IFS)to underpin the <br /> northeastern corner of the house foundation for the purpose of stabilizing and lifting to relevel the <br /> foundation. The foundation had settled about 34". <br /> Wade Lassey with GEO Group Northwest, Inc.,was at the site and inspected the pier installation and <br /> recorded the pier load test. Based on our observations the piers and the foundation brackets were <br /> installed in accordance with the project plans and specifications and are acceptable. The piers were <br /> individually installed to either a maximum installation pressure of 6000 psi(34,200 equivalent lbs) or <br /> until the house foundation started to lift. After installing all the piers, the foundation in the northeast <br /> corner was lifted and releveled. <br /> Attached is the field report with the recorded pier installation pressures and pier depths. A quick load <br /> test was performed in accordance with ASTM D1143-81 on pier#1 to 200 percent of the design load <br /> of 12,500 lbs and the load test passed. The load test data sheet is attached. <br /> 13705 Bel-Red Road - Bellevue, Washington 98005 <br /> Phone 425/649-8757 Fax 435/649-8758 <br />
The URL can be used to link to this page
Your browser does not support the video tag.