My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2514 51ST ST SW Geotech Report 2022-10-25
>
Address Records
>
51ST ST SW
>
2514
>
Geotech Report
>
2514 51ST ST SW Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 11:40:50 AM
Creation date
9/10/2019 10:41:07 AM
Metadata
Fields
Template:
Address Document
Street Name
51ST ST SW
Street Number
2514
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIELD REPORT <br /> GEO Group Northwest, Inc. Job# Date Page# Field Report# <br /> Geotechnical Engineers,Geologists,a — G-4400 9/25/2015 1 of 2 1 <br /> ErivIronnv3ntatSciertists Project: <br /> 13240 NE 20th Street,Ste 10 Bellevue,WA 98005 Koitonowski Res, 2514 51st ST SW, Everett,WA <br /> Phone 425-649-8757 Fax 425.6498758 Permit#: <br /> B1707-050 <br /> Wade Lassey with GEO Group Northwest, Inc., was onsite to inspect the installation of the <br /> 3 inch diameter push piers by Innovative Foundation Solutions. The piers were installed to <br /> underpin the foundation at the northeast corner of the house. <br /> Push Pier Installation <br /> A total of eight (8)push piers were installed. Based on our observations the pier installation was <br /> acceptable. The pier locations and the installation of the piers and brackets were in accordance <br /> with the plans and specifications. Below is the pier numbering sketch and the pier installation <br /> record. <br /> Load Test <br /> A quick load test was performed on pier#1, in accordance with ASTM D1143-81. The load test <br /> passed and was acceptable. Attached is the load test data sheet. <br /> Pier Numbering&Installation Record <br /> #8 #7 #6 #5 #4 <br /> rcilD <br /> D #3 :.►��, <br /> Front <br /> Door O #2 Plan View <br /> HOUSE Not To Scale <br /> D #1 <br /> Push Pier&Number**. <br /> Chimney <br /> Pier# Pier Length Final Pressure Equiv.Force <br /> Iasi) ILI <br /> 1 24.5' 6,000 34,200 <br /> 2 14.0' 4,200 23,940 <br /> 3 14.0' 3,200 18,240 <br /> 4 14.0' 3,200 18,240 <br /> 5 17.5' 3,200 18,240 <br /> 6 14.0' 6,000 34,200 Where: <br /> 7 10.5' 4,000 22,800 Equiv.Force(lbs)= Final Pressure(psi)x CF <br /> 8 6.0' 3,000 17,100 CF=Conversion Factor=5.7 <br /> Copy to: Mr. Edward Koltonowski <br /> Continued <br /> Office File on next page <br />
The URL can be used to link to this page
Your browser does not support the video tag.