My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2120 62ND ST SE 2019-09-10
>
Address Records
>
62ND ST SE
>
2120
>
2120 62ND ST SE 2019-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2019 1:27:35 PM
Creation date
9/10/2019 1:27:34 PM
Metadata
Fields
Template:
Address Document
Street Name
62ND ST SE
Street Number
2120
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC -ORKS PERMIT mate Applied: 10/16/2018 <br /> iSIPAihoe0e—A City of Everett Permit Services Public Works Permit#: PW1810-042 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> Everett,WA 98201 Planning Reference#: <br /> (425) 257-8810 PublicWorks Fee: $65 <br /> 118 OCT 2Oi <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> SCOTT ROTH BATH PLUS INC. <br /> 2120 62nd ST SE 1427 130th AVE NE <br /> EVERETT, WA, 98203 BELLEVUE, WA, <br /> PHONE: PHONE: 4252293296 <br /> TAX PARCEL ID#: SITE ADDRESS: 2120 62nd ST SE <br /> DESCRIPTION: ADA PATHWAY FROM BACK TO THE DRIVEWAY <br /> (10/16/2018 9:38 AM BES) <br /> ADA CONCRETE PATHWAY FROM DECK IN THE BACK TO THE DRIVEWAY <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you calf does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 10/16/2018. <br /> Approved plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting constructio ;for aq; i <br /> consultation and to evaluate Erosion/Sedimentation control set-up. All inspections must be formally requested.See le <br /> attached handout for phone number and online instructions to Request an Inspection. a�,. ,t:, --- . <br /> 6. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadv ' • ) <br /> 8. Protect all existing underground utilities during construction. :,.�-:?'�' <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfs will be <br /> managed on-site in a manner that does not adversely affect neighboring properties, including the City's right-ofway c-4r <br /> easements and the improvements located therein. 1-1- <br /> 10. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Call the inspection lin* <br /> request a Final for this permit when all items have been completed. ; <br /> cp. �ea <br /> Public Works Permit Fee Breakdown: .f:t a .qtr• F <br /> Driveway/Concrete Pathway Residen $25.00 ° 'e-°*'E-° °� <br /> c rr...3 r•.. <br /> PW Plan Review $20.00 --'C;. . <br /> PW Site Inspection $20.00 '� - <br /> ,' City of Evere Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> ...'�.. harmless the City of Everett from any and all claims for damages,costs, <br /> Ali `_�� fp /4 k7/I expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> 'pproved for ConstructioUblic Works) ate for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> ,........../62 <br /> FINAL INSPECTION Date <br /> lath <br /> ti <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.