Laserfiche WebLink
Final: <br /> The building enclosure elements of the townhome building were inspected <br /> during the course of material application from window flashing to <br /> completion of the siding and sealing of all penetrations. Elements are <br /> determined to be installed to plans and specifications and to good industry <br /> standards. <br /> Submitted by: <br /> Diane Glenn <br /> Construction Consultants of <br /> Washington, LLC <br /> Building Enclosure inspector <br /> Office(425)709-6100 Cell (425)351-0940 40 Lake Bellevue,Suite 100, Bellevue,WA 98005 <br /> C/At) <br />